Back to kitchen remodel contractors
Who Built Creative Builders
- Based in
- Petaluma
- On San Francisco permits
- Jun 2007 to Jun 2017
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 1, 2008 | Completed final sign-off Jul 2008 | 737 Pine St | work @ apt# 37 only. kitchen remodel with new cabinets and countertops. upgrade electrical to gfi requirements. bathroom floor covering, pressure balance valve.Details
work @ apt# 37 only. kitchen remodel with new cabinets and countertops. upgrade electrical to gfi requirements. bathroom floor covering, pressure balance valve. | $19,000 |
| Feb 1, 2008 | Completed final sign-off Jul 2008 | 737 Pine St | work on apt#1a. kitchen remodel with new cabinets and countertops, upgrade electrical to gfi requirements, bath floor covering and pressure balance valve and fixturesDetails
work on apt#1a. kitchen remodel with new cabinets and countertops, upgrade electrical to gfi requirements, bath floor covering and pressure balance valve and fixtures | $19,000 |
| Jul 17, 2007 | Completed final sign-off Sep 2007 | 737 Pine St | work on apt#5. kitchen remodel with new cabinets/countertop. update electrical to gfi requirements. bathroom floor covering & new pressure valve, new fixtures.Details
work on apt#5. kitchen remodel with new cabinets/countertop. update electrical to gfi requirements. bathroom floor covering & new pressure valve, new fixtures. | $24,000 |