Block 0272, lot 001
701 Pine St
- City’s use
- Multi-Family Residential
- Built
- 1926
- Stories
- 7
- Units
- 44
- Rooms
- 44 bathrooms
- Building
- 32,460 sq ft
- Lot
- 5,998 sq ft
- Zoning
- RM4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
49 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2025 | Completed final sign-off Nov 2025 | 701 Pine St | Sure, Inc. | unit 7: (1) kitchen (1) bath remodel. no wall moving. no change to layout. update electrical. led fixtures and sub-panel in the unit. replace (e) bathtub w/walk-in shower.Details
unit 7: (1) kitchen (1) bath remodel. no wall moving. no change to layout. update electrical. led fixtures and sub-panel in the unit. replace (e) bathtub w/walk-in shower. | $40,000 |
| Aug 20, 2024 | Completed final sign-off Nov 2024 | 701 Pine St | Sure, Inc. | unit 11: remodel (1) 90 sq ft kitchen. (1) 70 sq ft bathroom. no change to wall or windows. update light fixtures in the unit.Details
unit 11: remodel (1) 90 sq ft kitchen. (1) 70 sq ft bathroom. no change to wall or windows. update light fixtures in the unit. | $52,000 |
| Aug 13, 2024 | Completed final sign-off Nov 2024 | 701 Pine St | Sure, Inc. | unit #23: (1) bathroom renovation no change to layout, update electrical sub electric breaker panel and (n) led light fixtures no work in other areasDetails
unit #23: (1) bathroom renovation no change to layout, update electrical sub electric breaker panel and (n) led light fixtures no work in other areas | $25,000 |
| Dec 23, 2022 | Completed final sign-off Mar 2023 | 701 Pine St | Sure, Inc. | unit #52: (1) kitchen approx 80sqft remodeling with existing layout. (1) bathroom (40sqft) remodeling to existing layout. no change to unit layout. no wall moving update light fixtures in the unit.Details
unit #52: (1) kitchen approx 80sqft remodeling with existing layout. (1) bathroom (40sqft) remodeling to existing layout. no change to unit layout. no wall moving update light fixtures in the unit. | $38,000 |
| Dec 15, 2022 | Completed final sign-off Nov 2023 | 701 Pine St | Sure, Inc. | kitchen remodel approx. 80sqft existing layout. no change to walls. no work in the bathroom. update light fixtures in unit#67Details
kitchen remodel approx. 80sqft existing layout. no change to walls. no work in the bathroom. update light fixtures in unit#67 | $30,000 |
| Nov 1, 2022 | Completed final sign-off Sep 2024 | 701 Pine St | Sure, Inc. | unit 24 & unit 3. remodel of 1 kitchen and 1 bathroom in each unit. both kitchen and bath are 100sf and 50sf. no change to wall or window as kitchen and bath will keep existing layout. update light fixtures in the unit.Details
unit 24 & unit 3. remodel of 1 kitchen and 1 bathroom in each unit. both kitchen and bath are 100sf and 50sf. no change to wall or window as kitchen and bath will keep existing layout. update light fixtures in the unit. | $53,000 |
| Jul 13, 2022 | Completed final sign-off Oct 2022 | 701 Pine St | Sure, Inc. | unit 4: remodel (1) 54-sq. ft. kitchen and (1) 30-sq. ft. bath: no wall moving: replace (1) bath tub to walk in shower. (n) electrical wiring and panel inside of the unit. no layout changeDetails
unit 4: remodel (1) 54-sq. ft. kitchen and (1) 30-sq. ft. bath: no wall moving: replace (1) bath tub to walk in shower. (n) electrical wiring and panel inside of the unit. no layout change | $32,000 |
| Jun 3, 2022 | Completed final sign-off Sep 2022 | 701 Pine St | Sure, Inc. | units #22 & #51: one kitchen ~ 50 sqft and one bathroom ~ 40 sqft remodeling for each unit. no wall moving or layout, window or door changing. remove (e) bathtubs and (n) electrical wiring and subpanel in each unit.Details
units #22 & #51: one kitchen ~ 50 sqft and one bathroom ~ 40 sqft remodeling for each unit. no wall moving or layout, window or door changing. remove (e) bathtubs and (n) electrical wiring and subpanel in each unit. | $49,000 |
| May 2, 2022 | Completed final sign-off Jul 2022 | 701 Pine St | Sure, Inc. | (1) kitchen & (1) bath remodel for each unit. no change to wall or layout. remove (e) bathtub & install (n) walk-in shower for each unit. (n) electrical wiring & panel inside of each unit.Details
(1) kitchen & (1) bath remodel for each unit. no change to wall or layout. remove (e) bathtub & install (n) walk-in shower for each unit. (n) electrical wiring & panel inside of each unit. | $46,000 |
| Mar 1, 2022 | Completed final sign-off May 2022 | 701 Pine St | Sure, Inc. | unit 36: (1) kitchen (1) bathroom remodel. no change to layout. no wall moving, no window or door moving. update light fixtures and wiring and install new walk-in shower. x1Details
unit 36: (1) kitchen (1) bathroom remodel. no change to layout. no wall moving, no window or door moving. update light fixtures and wiring and install new walk-in shower. x1 | $33,000 |
| Dec 20, 2021 | Completed final sign-off May 2022 | 701 Pine St | Sure, Inc. | units #43 & #53. total of 2 kitchen, 2 bath remodel. no change to layout, wall or window. update light fixtures and install new walk-in shower.Details
units #43 & #53. total of 2 kitchen, 2 bath remodel. no change to layout, wall or window. update light fixtures and install new walk-in shower. | $55,000 |
| Nov 17, 2021 | Completed final sign-off Feb 2022 | 701 Pine St | Sure, Inc. | replace sheet metal gutter for front awning in kind approx 16'Details
replace sheet metal gutter for front awning in kind approx 16' | $1,800 |
| Jul 29, 2021 | Completed final sign-off Oct 2021 | 701 Pine St | Sure, Inc. | unit 41: one kitchen and one bath remodel. no change to layout. replace (e) tub with shower in bathDetails
unit 41: one kitchen and one bath remodel. no change to layout. replace (e) tub with shower in bath | $33,000 |
| May 12, 2021 | Completed final sign-off Oct 2021 | 701 Pine St | Sure, Inc. | apt 63: renovate kitchen & bathroom. no change to structural wall.Details
apt 63: renovate kitchen & bathroom. no change to structural wall. | $39,000 |
| Nov 30, 2020 | Never finaled filed Nov 2020, never issued | 701 Pine St | Crime Watch Security Sys Llc | like for like & 2021 replacement of fa system, install of facp, radio communicator, monitor module, pull stations, smoke detectors, horn strobes in common areas and horns in every room to meet 2021 mandate.Details
like for like & 2021 replacement of fa system, install of facp, radio communicator, monitor module, pull stations, smoke detectors, horn strobes in common areas and horns in every room to meet 2021 mandate. | $59,034 |
| Nov 5, 2020 | Completed final sign-off Jun 2021 | 701 Pine St | Crime Watch Security Sys Llc | like for like & 2021 replacement of fa system, facp, radio communicator, monitor module, pull stations, smoke detectors, horn strobes in common areas and horns in every unit to meet 2021 mandate.Details
like for like & 2021 replacement of fa system, facp, radio communicator, monitor module, pull stations, smoke detectors, horn strobes in common areas and horns in every unit to meet 2021 mandate. | $59,034 |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 701 Pine St | Sure, Inc. | unit 25 - remodel kitchen and bath in kind.Details
unit 25 - remodel kitchen and bath in kind. | $35,000 |
| Dec 17, 2019 | Never finaled issued Dec 2019, no final | 701 Pine St | Sure, Inc. | unit 26 - 1 kitchen and 1 bathroom remodel like for like. no structural workDetails
unit 26 - 1 kitchen and 1 bathroom remodel like for like. no structural work | $35,000 |
| Jul 26, 2019 | Completed final sign-off Sep 2019 | 701 Pine St | Sure, Inc. | apt 32. kitchen and bath remodeling. kitchen (8x10). bath (5x7).Details
apt 32. kitchen and bath remodeling. kitchen (8x10). bath (5x7). | $35,000 |
| Jul 8, 2019 | Completed final sign-off Sep 2019 | 701 Pine St | Sure, Inc. | unit 33: kitchen (8' x 10') and bathroom (5' x 7') remodelingDetails
unit 33: kitchen (8' x 10') and bathroom (5' x 7') remodeling | $35,000 |
| Jul 2, 2019 | Completed final sign-off Sep 2019 | 701 Pine St | Sure, Inc. | unit # 62: kitchen and bathroom remodel. approx 8'x10' kitchen and 5'x7' bathroom.Details
unit # 62: kitchen and bathroom remodel. approx 8'x10' kitchen and 5'x7' bathroom. | $35,000 |
| Jul 2, 2019 | Completed final sign-off Sep 2019 | 701 Pine St | Sure, Inc. | unit #2: remodle kitchen and bathroom. approx 8'x10' kitchen and 5'x7' bathroomDetails
unit #2: remodle kitchen and bathroom. approx 8'x10' kitchen and 5'x7' bathroom | $35,000 |
| Mar 26, 2019 | Completed final sign-off Jun 2019 | 701 Pine St | Sure, Inc. | unit 31: kitchen and bathroom remodeling. kitchen and bathroom approx. 10' x 8' and 5' x 7' respectivelyDetails
unit 31: kitchen and bathroom remodeling. kitchen and bathroom approx. 10' x 8' and 5' x 7' respectively | $35,000 |
| Jun 22, 2018 | Completed final sign-off Sep 2018 | 701 Pine St | Sure, Inc. | unit 64: kitchen & bath remodelDetails
unit 64: kitchen & bath remodel | $35,000 |
| Feb 20, 2018 | Completed final sign-off Apr 2018 | 701 Pine St | Sure, Inc. | #66 - kitchen & bath remodel, no change to walls & opening & layoutDetails
#66 - kitchen & bath remodel, no change to walls & opening & layout | $35,000 |
| Jan 8, 2018 | Completed final sign-off Mar 2018 | 701 Pine St | Sure, Inc. | #34 - kitchen & bath remodelling. n/a maher ordinanceDetails
#34 - kitchen & bath remodelling. n/a maher ordinance | $35,000 |
| May 31, 2017 | Completed final sign-off Aug 2017 | 701 Pine St | Sure, Inc. | unit #42: bathroom and kitchen remodel, in kindDetails
unit #42: bathroom and kitchen remodel, in kind | $30,000 |
| Dec 8, 2016 | Never finaled issued Dec 2016, no final | 701 Pine St | Sure, Inc. | #32 - kitchen & bath remodel | $30,000 |
| Dec 10, 2015 | Completed final sign-off Jan 2016 | 701 Pine St | Sure, Inc. | #55- replace kitchen cabinets & counter tops, replace bath tub, replace bathroom tiles, replace vanity & medicine cabinet. n/a ordinance #155-13Details
#55- replace kitchen cabinets & counter tops, replace bath tub, replace bathroom tiles, replace vanity & medicine cabinet. n/a ordinance #155-13 | $18,000 |
| Jul 17, 2014 | Completed final sign-off Oct 2014 | 701 Pine St | Sure, Inc. | unit 54: replace kitchen cabinets & counter tops. replace bath tiles. replace bathtub & vanity.Details
unit 54: replace kitchen cabinets & counter tops. replace bath tiles. replace bathtub & vanity. | $28,000 |
| May 16, 2014 | Completed final sign-off May 2014 | 701 Pine St | A B C Window Contractors | install 11 vinyl windows in kind into existing frames. no change in size or locationl windows do not face the street. if applicable, bedroom windows will comply with section 1029 for rescue. all windows will be dboule pane and have a u factor of .30. unit 57. compliance with ord 155-13 not requiredDetails
install 11 vinyl windows in kind into existing frames. no change in size or locationl windows do not face the street. if applicable, bedroom windows will comply with section 1029 for rescue. all windows will be dboule pane and have a u factor of .30. unit 57. compliance with ord 155-13 not required | $5,360 |
| Feb 5, 2014 | Completed final sign-off May 2014 | 701 Pine St | Sure, Inc. | unit #57: repl kitchen cabinets and counter top, repl bath tub & bath tiles, exh w/humidistat fan to remain, repl vanity & medicine cabinet, no structure work, new lighting 100% efficient lighting, all new lights shall comply with cec 150k; compliance with ord 155-13 not requiredDetails
unit #57: repl kitchen cabinets and counter top, repl bath tub & bath tiles, exh w/humidistat fan to remain, repl vanity & medicine cabinet, no structure work, new lighting 100% efficient lighting, all new lights shall comply with cec 150k; compliance with ord 155-13 not required | $18,000 |
| Oct 19, 2012 | Completed final sign-off Aug 2013 | 701 Pine St | A B C Window Contractors | #61- install 11 vinyl windows in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section cbc1026 for rescue. all windows will be double pane and have a u-factor of 0.30.Details
#61- install 11 vinyl windows in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section cbc1026 for rescue. all windows will be double pane and have a u-factor of 0.30. | $4,835 |
| Oct 2, 2012 | Completed final sign-off Jan 2013 | 701 Pine St | Sure, Inc. | #61- kitchen & bathroom remodel: replace kitchen cabinets, replace bathtub, replace bathroom tiles, replace bath vanity. no wall relocation. lighting requirements shall comply with cec 150(k)8 & cec 150(k)10.Details
#61- kitchen & bathroom remodel: replace kitchen cabinets, replace bathtub, replace bathroom tiles, replace bath vanity. no wall relocation. lighting requirements shall comply with cec 150(k)8 & cec 150(k)10. | $18,000 |
| Jan 17, 2012 | Completed final sign-off Feb 2012 | 737 Pine St | Arcon Construction Corp | unit #26-kitchen cabinets replacement onlyDetails
unit #26-kitchen cabinets replacement only | $8,000 |
| Jan 11, 2012 | Never finaled issued Jan 2012, no final | 701 Pine St | A B C Window Contractors | #67 - install 1 aluminum window in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section cbc1026 for rescue.Details
#67 - install 1 aluminum window in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section cbc1026 for rescue. | $1,050 |
| May 14, 2009 | Completed final sign-off Nov 2012 | 701 Pine St | Sure, Inc. | work on unit#5. replace kitchen cabinets, bathtub, tiles in bathroom, vanity.Details
work on unit#5. replace kitchen cabinets, bathtub, tiles in bathroom, vanity. | $10,000 |
| Apr 10, 2009 | Never finaled issued Apr 2009, no final | 701 Pine St | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Apr 1, 2009 | Completed final sign-off Jun 2009 | 701 Pine St | Sure, Inc. | replace wall tiles in bathtub enclosure, kitchen cabinets, vanity sink and medicine cabinets.Details
replace wall tiles in bathtub enclosure, kitchen cabinets, vanity sink and medicine cabinets. | $25,600 |
| Mar 14, 2008 | Expired or cancelled cancelled Jan 2026 | 701 Pine St | install vinyl siding on 2 back walls of building | $100,000 | |
| Feb 1, 2008 | Completed final sign-off Jul 2008 | 737 Pine St | Who Built Creative Builders | work @ apt# 37 only. kitchen remodel with new cabinets and countertops. upgrade electrical to gfi requirements. bathroom floor covering, pressure balance valve.Details
work @ apt# 37 only. kitchen remodel with new cabinets and countertops. upgrade electrical to gfi requirements. bathroom floor covering, pressure balance valve. | $19,000 |
| Feb 5, 2007 | Completed final sign-off Mar 2007 | 701 Pine St | A B C Window Contractors | install 4 vinyl windows in kind into existing frames. no chagne in size or location. windows do not face street. if applicable, bedroom windows will comply with section 310.4 for rescue. all windows will be double panel and have a u-factor .30.Details
install 4 vinyl windows in kind into existing frames. no chagne in size or location. windows do not face street. if applicable, bedroom windows will comply with section 310.4 for rescue. all windows will be double panel and have a u-factor .30. | $1,420 |
| Jan 19, 2007 | Completed final sign-off May 2007 | 701 Pine St | Sure, Inc. | unit#9 replace kitchen cabinet. tiles in bathtub enclosure. replace bath vanity, bth medicine cabinet. 50% of wattage of kitchen lighting to be flourescent. bathroom lighting to be flourscent or on occupant sensor.Details
unit#9 replace kitchen cabinet. tiles in bathtub enclosure. replace bath vanity, bth medicine cabinet. 50% of wattage of kitchen lighting to be flourescent. bathroom lighting to be flourscent or on occupant sensor. | $10,000 |
| Mar 3, 2006 | Completed final sign-off Apr 2006 | 737 Pine St | all existing-non strutural,demo old cabinets #24 insatll new ones, demo old counterpots #56 install new ones (gruite)Details
all existing-non strutural,demo old cabinets #24 insatll new ones, demo old counterpots #56 install new ones (gruite) | $1,000 | |
| Apr 7, 2005 | Expired or cancelled expired Mar 2007 | 701 Pine St | A B C Window Contractors | install 2 vinyl windows in kind into (e)frames.no change in size/location.windows do not face streetDetails
install 2 vinyl windows in kind into (e)frames.no change in size/location.windows do not face street | $855 |
| May 5, 2004 | Completed final sign-off Jul 2004 | 701 Pine St | Lara Construction Co. | unit #8 & #64-remove&install kit.cabinet&counter top. no stru walls removeDetails
unit #8 & #64-remove&install kit.cabinet&counter top. no stru walls remove | $5,200 |
| May 5, 2004 | Completed final sign-off Jul 2004 | 701 Pine St | Lara Construction Co. | unit #1-remove&install kit.cabinet&counter top.remove &install bath fix &retile.no struwalls removedDetails
unit #1-remove&install kit.cabinet&counter top.remove &install bath fix &retile.no struwalls removed | $8,500 |
| Mar 25, 2004 | Completed final sign-off May 2004 | 701 Pine St | Lara Construction Co. | remove (e) kitchen cabinets & counters, install new kitchenb cabinets & laminate counter, no **Details
remove (e) kitchen cabinets & counters, install new kitchenb cabinets & laminate counter, no ** | $5,700 |
| Oct 5, 2000 | Completed final sign-off Oct 2000 | 701 Pine St | Lara Construction Co. | replace dry rotted joist above garage on the ceilingDetails
replace dry rotted joist above garage on the ceiling | $1,200 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sure, Inc. (33), A B C Window Contractors (5), Lara Construction Co. (4), Crime Watch Security Sys Llc (2), Arcon Construction Corp, Who Built Creative Builders
- Authorized agents
- Siu (Joe) Man (4)
Find contractors for work like this