Permit GraphShortlistSan Francisco building permits since 2000

Wei Ming Construction

Contractor license
893076
State license record
Based in
Daly City
On San Francisco permits
May 2006 to Oct 2022
Last 24 months
0 permits filed

37 permits since 2000: 35 completed, 1 never finaled, 1 expired or cancelled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllRoof deck 1Deck 5Stairs 9Kitchen remodel 10Bathroom remodel 17

9 stairs permits: 9 completed. Typically 4 days from filing to permit and 120 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 1, 2015Completed
final sign-off Jun 2016
275 Concord Stto comply with complaint 201544131 - add one bedroom on 1st floor; (n) full bath on 1st floor; turn (e) storage into entertainment room on 1st floor; remove illegal deck & staircase on 2nd floor per plan
Details
Permit
201512013853
Status
complete
Filed
Dec 1, 2015
Permit issued
Jan 19, 2016
Final sign-off
Jun 23, 2016
Declared cost
$40,000
Address
275 Concord St

to comply with complaint 201544131 - add one bedroom on 1st floor; (n) full bath on 1st floor; turn (e) storage into entertainment room on 1st floor; remove illegal deck & staircase on 2nd floor per plan

Open the permit page

$40,000
Apr 17, 2013Completed
final sign-off Jul 2013
25 Mizpah Stadd an interior stair to connect 1st and 2nd floor per plan. add one bath tub on 1st fl per plan. add raised floor on 1st floor.
Details
Permit
201304174773
Status
complete
Filed
Apr 17, 2013
Permit issued
May 21, 2013
Final sign-off
Jul 10, 2013
Declared cost
$6,000
Address
25 Mizpah St

add an interior stair to connect 1st and 2nd floor per plan. add one bath tub on 1st fl per plan. add raised floor on 1st floor.

Open the permit page

$6,000
Feb 26, 2013Completed
final sign-off Apr 2018
60 Allston Wyremodel existing wood framed stucco finished single family residt. provide new concrete foundation, raise existing wood framed bldg approx 3' excavate crawl space to provide conditioned habital space, add exterior windows and doors, rear exterior stair, reconfigure front entry stair &
Details
Permit
201302260957
Status
complete
Filed
Feb 26, 2013
Permit issued
Sep 29, 2016
Final sign-off
Apr 25, 2018
Declared cost
$300,000
Address
60 Allston Wy

remodel existing wood framed stucco finished single family residt. provide new concrete foundation, raise existing wood framed bldg approx 3' excavate crawl space to provide conditioned habital space, add exterior windows and doors, rear exterior stair, reconfigure front entry stair &

Open the permit page

$300,000
Feb 1, 2012Completed
final sign-off Mar 2012
282 Guerrero Strebuilt rear damage stairway in kind. same location and same configuration. to comply with his. nov. 201280136.
Details
Permit
201202013369
Status
complete
Filed
Feb 1, 2012
Permit issued
Feb 8, 2012
Final sign-off
Mar 21, 2012
Declared cost
$6,000
Address
282 Guerrero St

rebuilt rear damage stairway in kind. same location and same configuration. to comply with his. nov. 201280136.

Open the permit page

$6,000
Oct 13, 2011Completed
final sign-off Dec 2011
1322 42nd Avrepair dry rot at front stairway about 150 sq.ft. less than 40%
Details
Permit
201110136736
Status
complete
Filed
Oct 13, 2011
Permit issued
Oct 13, 2011
Final sign-off
Dec 7, 2011
Declared cost
$4,000
Address
1322 42nd Av

repair dry rot at front stairway about 150 sq.ft. less than 40%

Open the permit page

$4,000
Mar 21, 2011Completed
final sign-off Sep 2011
824 Teresita Bl1)add 2 bedrooms, one full bath, one utility room and storage/hall area on 1st floor. 2)relocate of interior stairway.
Details
Permit
201103212455
Status
complete
Filed
Mar 21, 2011
Permit issued
Mar 25, 2011
Final sign-off
Sep 28, 2011
Declared cost
$50,000
Address
824 Teresita Bl

1)add 2 bedrooms, one full bath, one utility room and storage/hall area on 1st floor. 2)relocate of interior stairway.

Open the permit page

$50,000
Apr 19, 2010Completed
final sign-off Mar 2011
2242 Cabrillo St1st fl: add 1 bedrm, full bath rm, fam. rm and a storage rm. rewmove rear stairway. 3rd fl: add a full bath and remodel (e) bathrm. add 2 skylights and replace all (e) windows. replace rear room foundation
Details
Permit
201004190480
Status
complete
Filed
Apr 19, 2010
Permit issued
Apr 20, 2010
Final sign-off
Mar 10, 2011
Declared cost
$60,000
Address
2242 Cabrillo St

1st fl: add 1 bedrm, full bath rm, fam. rm and a storage rm. rewmove rear stairway. 3rd fl: add a full bath and remodel (e) bathrm. add 2 skylights and replace all (e) windows. replace rear room foundation

Open the permit page

$60,000
Aug 22, 2007Completed
final sign-off Dec 2007
2662 22nd Avrepair front stair and replace all stucco at front of house (about 300 sq. ft). no structural work under this permit. stucco replacement in kind.
Details
Permit
200708220599
Status
complete
Filed
Aug 22, 2007
Permit issued
Aug 22, 2007
Final sign-off
Dec 20, 2007
Declared cost
$15,000
Address
2662 22nd Av

repair front stair and replace all stucco at front of house (about 300 sq. ft). no structural work under this permit. stucco replacement in kind.

Open the permit page

$15,000
Jun 28, 2007Completed
final sign-off Aug 2007
1507 31st Avrepair some dryrot at the side of front stair about 40 sqft. no termite report submitted approximatly 40 sqft.
Details
Permit
200706285483
Status
complete
Filed
Jun 28, 2007
Permit issued
Jun 28, 2007
Final sign-off
Aug 14, 2007
Declared cost
$4,000
Address
1507 31st Av

repair some dryrot at the side of front stair about 40 sqft. no termite report submitted approximatly 40 sqft.

Open the permit page

$4,000