Back to kitchen remodel contractors
Wei Ming Construction
- Based in
- Daly City
- On San Francisco permits
- May 2006 to Oct 2022
- Last 24 months
- 0 permits filed
37 permits since 2000: 35 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 10 completed. Typically 14 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2022 | Completed final sign-off Oct 2023 | 1639 Ulloa St | kitchen and bathroom remodel on 2/f. replace plaster sheet rock at 2nd flr.Details
kitchen and bathroom remodel on 2/f. replace plaster sheet rock at 2nd flr. | $18,000 |
| Jul 2, 2019 | Completed final sign-off Oct 2019 | 799 La Playa | apt 1: remodel kitchen & 2-1/2 bathrooms in-kind. replace all (e) fixtures.Details
apt 1: remodel kitchen & 2-1/2 bathrooms in-kind. replace all (e) fixtures. | $30,000 |
| Dec 21, 2017 | Completed final sign-off Jun 2019 | 1645 Ulloa St | revision to site permit #201606150054, omit 3rd story addition,changes to 1st & 2nd fl plan. new master bedroom with walk-in closet & bathroom, new storage, media room, windows, lightwell & foundation at 1st fl, kitchen renovation & new windows at 2nd flDetails
revision to site permit #201606150054, omit 3rd story addition,changes to 1st & 2nd fl plan. new master bedroom with walk-in closet & bathroom, new storage, media room, windows, lightwell & foundation at 1st fl, kitchen renovation & new windows at 2nd fl | |
| Jun 15, 2016 | Completed final sign-off Jun 2019 | 1645 Ulloa St | 3rd story addition w/ roof decks. (n) laundry room & foundaiton @ 1st fl. kitchen renovation @ 2nd fl. replace (e) rear windows. seismic upgrade.Details
3rd story addition w/ roof decks. (n) laundry room & foundaiton @ 1st fl. kitchen renovation @ 2nd fl. replace (e) rear windows. seismic upgrade. | $211,613 |
| Dec 23, 2014 | Completed final sign-off Sep 2015 | 135 Miramar Av | legalize new unit at final plan. 2 bedrooms, 1 bath, 1 storage and kitchen. add 1 furnace.Details
legalize new unit at final plan. 2 bedrooms, 1 bath, 1 storage and kitchen. add 1 furnace. | $6,000 |
| Oct 15, 2013 | Completed final sign-off Nov 2014 | 753 35th Av | kitchen remodel and new opening between kitchen and dining room. legalize gr fl bathDetails
kitchen remodel and new opening between kitchen and dining room. legalize gr fl bath | $9,000 |
| Jan 18, 2012 | Completed final sign-off Mar 2012 | 723 41st Av | remodel kitchen. lighting comply with cec150(k)8Details
remodel kitchen. lighting comply with cec150(k)8 | $9,000 |
| Sep 21, 2011 | Completed final sign-off Dec 2011 | 2583 32nd Av | kitchen remodel, counter top, flooring. no change on walls and openings.Details
kitchen remodel, counter top, flooring. no change on walls and openings. | $7,200 |
| Feb 1, 2011 | Completed final sign-off Jun 2011 | 7 Wawona St | remodel kitchen at main floorDetails
remodel kitchen at main floor | $9,000 |
| Dec 20, 2007 | Completed final sign-off Jul 2008 | 631 Congo St | comply nov #200720102. re-sheet rock @ all interior ceilings & walls. also, convert (e) laundry space into stydy & full bath. new deck at rear, remodel second floor kitchen & bath. convert (e) living to bedroom, bedroom to living room. add 2 (2'x5') windows at front elevation.Details
comply nov #200720102. re-sheet rock @ all interior ceilings & walls. also, convert (e) laundry space into stydy & full bath. new deck at rear, remodel second floor kitchen & bath. convert (e) living to bedroom, bedroom to living room. add 2 (2'x5') windows at front elevation. | $80,000 |