Wei Li Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2015 to Aug 2026
- Last 24 months
- 5 permits filed
42 permits since 2000: 35 completed, 5 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 8 completed, 3 in progress. Typically 137 days from filing to permit and 368 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Aug 2026 | 1935 Webster St | revision to pa 202507030118 rebuild 2nd/3rd floor stair within existing space. bring framing, rise/run dimensions, stair width, guardrail and handrail height up to codeDetails
revision to pa 202507030118 rebuild 2nd/3rd floor stair within existing space. bring framing, rise/run dimensions, stair width, guardrail and handrail height up to code | $15,000 |
| Feb 6, 2026 | In progress issued Jul 2026 | 3342 Fulton St | additions to rear of house at first, second, and third floor. new stair to connect first and second floors, convert rear storage space to office, reconfigure and remodel third floor bathrooms and closets.Details
additions to rear of house at first, second, and third floor. new stair to connect first and second floors, convert rear storage space to office, reconfigure and remodel third floor bathrooms and closets. | $230,000 |
| Oct 28, 2024 | In progress issued Mar 2025 | 571 34th Av | 1st flr - infill lightwell with new interior stair. -add new conditional space within garage - add new living space under existing second flr structure. second floor - infill lightwell - remodel interior space -add elevated deck at rear year with exterior stairs to grade.Details
1st flr - infill lightwell with new interior stair. -add new conditional space within garage - add new living space under existing second flr structure. second floor - infill lightwell - remodel interior space -add elevated deck at rear year with exterior stairs to grade. | $176,000 |
| Apr 7, 2023 | Completed final sign-off Mar 2025 | 1468 36th Av | interior remodel of existing spaces to include ground flr/1st flr family rm, bedroom, bath, internal open stairs & 2nd flr. open kitchen, full bath & half bath.Details
interior remodel of existing spaces to include ground flr/1st flr family rm, bedroom, bath, internal open stairs & 2nd flr. open kitchen, full bath & half bath. | $125,000 |
| Dec 16, 2022 | Completed final sign-off Apr 2024 | 239 Lakeshore Dr | interior remodel of (e) sfr, to include (n) g/f family room, bedroom, powder room, laundry and bath, and 2/f open kitchen, (n) open stairs, full bath and 1/2 bath. windows to be replace in kind.Details
interior remodel of (e) sfr, to include (n) g/f family room, bedroom, powder room, laundry and bath, and 2/f open kitchen, (n) open stairs, full bath and 1/2 bath. windows to be replace in kind. | $150,000 |
| May 2, 2022 | Completed final sign-off Jun 2023 | 1359 41st Av | remodel g/f rec room, new bedroom, new bar, new bath, new laundry, new open interior stairs, & remodel of 2/f kitchen, open living space.Details
remodel g/f rec room, new bedroom, new bar, new bath, new laundry, new open interior stairs, & remodel of 2/f kitchen, open living space. | $125,000 |
| Oct 5, 2020 | Completed final sign-off Apr 2022 | 3655 Folsom St | interior remodel to incl kitchen, switching location of dinining rm & bedrm on ground flr, upgrading stairs to upper flr, new bathrm & closets on upper flr.Details
interior remodel to incl kitchen, switching location of dinining rm & bedrm on ground flr, upgrading stairs to upper flr, new bathrm & closets on upper flr. | $90,000 |
| Jul 21, 2020 | Completed final sign-off Sep 2021 | 619 11th Av | construct a deck at the rear yard approx 6'3 above grade. deck is entirely within buildable area and not encroach rear 30% of lot. deck size is approx 75 sf with stair to yardDetails
construct a deck at the rear yard approx 6'3 above grade. deck is entirely within buildable area and not encroach rear 30% of lot. deck size is approx 75 sf with stair to yard | $6,000 |
| Jan 26, 2018 | Completed final sign-off Aug 2018 | 134 Naples St | 1st floor: add 1 bedroom, 1 family rm, 1 full bath. new stairs at rear. remove attached shed.Details
1st floor: add 1 bedroom, 1 family rm, 1 full bath. new stairs at rear. remove attached shed. | $50,000 |
| Jun 16, 2017 | Completed final sign-off Feb 2018 | 16 Loyola Tr | 1st flr: add 1 media room, 2 bedrooms, 1 bath abd interior stairs to connect to 2nd flr. 2nd flr: remodel kitchen and bathroom, add 1 full bathDetails
1st flr: add 1 media room, 2 bedrooms, 1 bath abd interior stairs to connect to 2nd flr. 2nd flr: remodel kitchen and bathroom, add 1 full bath | $60,000 |
| Jul 21, 2016 | Completed final sign-off Mar 2025 | 4104 California St | to comply w/nov#202042521. legalize attic studio w/ kitchen, full bath, to include rear spiral stairDetails
to comply w/nov#202042521. legalize attic studio w/ kitchen, full bath, to include rear spiral stair | $50,000 |