Back to bathroom remodel contractors
Wei Li Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2015 to Aug 2026
- Last 24 months
- 5 permits filed
42 permits since 2000: 35 completed, 5 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 21 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 22 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2026 | In progress issued Jul 2026 | 3342 Fulton St | additions to rear of house at first, second, and third floor. new stair to connect first and second floors, convert rear storage space to office, reconfigure and remodel third floor bathrooms and closets.Details
additions to rear of house at first, second, and third floor. new stair to connect first and second floors, convert rear storage space to office, reconfigure and remodel third floor bathrooms and closets. | $230,000 |
| Mar 4, 2024 | Completed final sign-off Apr 2025 | 1018 Pacheco St | 2nd fl kitchen remodel, wall removal & (n) bath. 1st fl remodel to include (n) bedroom, (n) bath, (n) laundry room & expanded foyer inside covered entry. replace windows front and back of the buildingDetails
2nd fl kitchen remodel, wall removal & (n) bath. 1st fl remodel to include (n) bedroom, (n) bath, (n) laundry room & expanded foyer inside covered entry. replace windows front and back of the building | $95,000 |
| Apr 7, 2023 | Completed final sign-off Mar 2025 | 1468 36th Av | interior remodel of existing spaces to include ground flr/1st flr family rm, bedroom, bath, internal open stairs & 2nd flr. open kitchen, full bath & half bath.Details
interior remodel of existing spaces to include ground flr/1st flr family rm, bedroom, bath, internal open stairs & 2nd flr. open kitchen, full bath & half bath. | $125,000 |
| Dec 16, 2022 | Completed final sign-off Apr 2024 | 239 Lakeshore Dr | interior remodel of (e) sfr, to include (n) g/f family room, bedroom, powder room, laundry and bath, and 2/f open kitchen, (n) open stairs, full bath and 1/2 bath. windows to be replace in kind.Details
interior remodel of (e) sfr, to include (n) g/f family room, bedroom, powder room, laundry and bath, and 2/f open kitchen, (n) open stairs, full bath and 1/2 bath. windows to be replace in kind. | $150,000 |
| Jun 16, 2022 | Completed final sign-off Jun 2024 | 619 11th Av | remodel 2 bathrooms at 3rd fl. add a laundry closet.Details
remodel 2 bathrooms at 3rd fl. add a laundry closet. | $30,000 |
| May 2, 2022 | Completed final sign-off Jun 2023 | 1359 41st Av | remodel g/f rec room, new bedroom, new bar, new bath, new laundry, new open interior stairs, & remodel of 2/f kitchen, open living space.Details
remodel g/f rec room, new bedroom, new bar, new bath, new laundry, new open interior stairs, & remodel of 2/f kitchen, open living space. | $125,000 |
| Apr 16, 2021 | Completed final sign-off Sep 2021 | 539 09th Av | kitchen and two bathroom remodel with same layout no wall will be movedDetails
kitchen and two bathroom remodel with same layout no wall will be moved | $45,000 |
| May 26, 2020 | Never finaled issued May 2020, no final | 190 Bridgeview Dr | remodel kitchen and one bathroom on main floor. remove and replace countertop, cabinet, and flooring in kitchen. remove and replace tub, toilet and vanity in the bathroom. no alteration to partition walls. non-structural work only. all work in-kind.Details
remodel kitchen and one bathroom on main floor. remove and replace countertop, cabinet, and flooring in kitchen. remove and replace tub, toilet and vanity in the bathroom. no alteration to partition walls. non-structural work only. all work in-kind. | $30,000 |
| Jan 28, 2020 | Completed final sign-off Aug 2020 | 2425 21st Av | remodel kitchen, one bathroom and a half bathroom in kind. same layout. update electrical wiring for kitchen and bathroom. new kitchen cabinets, counter top. new plumbing fixtures.comply with cec 150(k) 3 and 5.Details
remodel kitchen, one bathroom and a half bathroom in kind. same layout. update electrical wiring for kitchen and bathroom. new kitchen cabinets, counter top. new plumbing fixtures.comply with cec 150(k) 3 and 5. | $49,500 |
| Jun 19, 2019 | Completed final sign-off Aug 2020 | 343 Arlington St | remodel at both levels. remodel e kitchen at 2nd fl. bath remodel and new habitable space at gr flDetails
remodel at both levels. remodel e kitchen at 2nd fl. bath remodel and new habitable space at gr fl | $95,000 |
| Nov 1, 2018 | Completed final sign-off Apr 2021 | 137 Detroit St | 9'-2" horizontal rear addition, interior remodel of kitchen, bath, new half bath at upper level. interior remodel of garage level to include new bedroom, laundry room & family room.Details
9'-2" horizontal rear addition, interior remodel of kitchen, bath, new half bath at upper level. interior remodel of garage level to include new bedroom, laundry room & family room. | $195,000 |
| Oct 15, 2018 | Completed final sign-off Jan 2019 | 1007 Carolina St | kitchen and bathrooms remodel with the same layout. replace the new cabinets. new countertop, faucets, sinks, new tile, new toilet, new vanities. new bathtub one shower.Details
kitchen and bathrooms remodel with the same layout. replace the new cabinets. new countertop, faucets, sinks, new tile, new toilet, new vanities. new bathtub one shower. | $42,500 |
| Apr 3, 2018 | Completed final sign-off Sep 2018 | 2018 Bancroft Av | legalize two bedrooms, one full bath, add laundry & front side door at 1st fl per plan.Details
legalize two bedrooms, one full bath, add laundry & front side door at 1st fl per plan. | $36,000 |
| Feb 7, 2018 | Expired or cancelled cancelled Jan 2026 | 3900 California St | unit 3. kitchen and two bathrooms remodel with the same layout. new cabinets, new tile, new counter tops. no rough framing. maher naDetails
unit 3. kitchen and two bathrooms remodel with the same layout. new cabinets, new tile, new counter tops. no rough framing. maher na | |
| Jan 26, 2018 | Completed final sign-off Aug 2018 | 134 Naples St | 1st floor: add 1 bedroom, 1 family rm, 1 full bath. new stairs at rear. remove attached shed.Details
1st floor: add 1 bedroom, 1 family rm, 1 full bath. new stairs at rear. remove attached shed. | $50,000 |
| Dec 12, 2017 | Completed final sign-off Jun 2018 | 1220 Naples St | construct three bedrooms, two full bathrooms & laundry area at ground floor. relcoate (e) ktichen, convert (e) ktichen space to new bedroom & convert one (e) bathroom to two bathroom at 2nd floor. replace 7 windows with (e) vinyl windows not street visible.Details
construct three bedrooms, two full bathrooms & laundry area at ground floor. relcoate (e) ktichen, convert (e) ktichen space to new bedroom & convert one (e) bathroom to two bathroom at 2nd floor. replace 7 windows with (e) vinyl windows not street visible. | $72,000 |
| Aug 14, 2017 | Completed final sign-off Apr 2019 | 771 28th Av | remodel (e) kitchen, infill lightwell, relocate laundry from garage to 1/f, convert sunroom to full bath on 2/f.Details
remodel (e) kitchen, infill lightwell, relocate laundry from garage to 1/f, convert sunroom to full bath on 2/f. | $40,000 |
| Jun 16, 2017 | Completed final sign-off Feb 2018 | 16 Loyola Tr | 1st flr: add 1 media room, 2 bedrooms, 1 bath abd interior stairs to connect to 2nd flr. 2nd flr: remodel kitchen and bathroom, add 1 full bathDetails
1st flr: add 1 media room, 2 bedrooms, 1 bath abd interior stairs to connect to 2nd flr. 2nd flr: remodel kitchen and bathroom, add 1 full bath | $60,000 |
| Apr 17, 2017 | Completed final sign-off Jan 2018 | 1485 16th Av | interior remodel of existing sfd. remodel bathrooms. new elevator. new laundry space on second floor.Details
interior remodel of existing sfd. remodel bathrooms. new elevator. new laundry space on second floor. | $50,000 |
| Sep 20, 2016 | Completed final sign-off Feb 2017 | 125 Galewood Cr | kitchen & baths remodel with same layout, new cabinets, countertop, appliances, faucets, toilets, bath tubs and shower.Details
kitchen & baths remodel with same layout, new cabinets, countertop, appliances, faucets, toilets, bath tubs and shower. | $35,000 |
| Jul 21, 2016 | Completed final sign-off Mar 2025 | 4104 California St | to comply w/nov#202042521. legalize attic studio w/ kitchen, full bath, to include rear spiral stairDetails
to comply w/nov#202042521. legalize attic studio w/ kitchen, full bath, to include rear spiral stair | $50,000 |
| Jul 7, 2016 | Completed final sign-off Dec 2016 | 2591 21st Av | 1 kitchen & 2 bathrooms remodeling. replace 2 windows on side of house not visbale from street. no structural work. no wall modification. no ground floor work.Details
1 kitchen & 2 bathrooms remodeling. replace 2 windows on side of house not visbale from street. no structural work. no wall modification. no ground floor work. | $25,000 |
| Mar 22, 2016 | Completed final sign-off Aug 2016 | 134 Naples St | 2nd floor: remodel kitchen and bath.Details
2nd floor: remodel kitchen and bath. | $20,000 |
| Feb 6, 2015 | Completed final sign-off Jun 2015 | 1037 Rivera St | add two bedrooms, two full bathrooms, family room & laundry at 1st floor per plan.Details
add two bedrooms, two full bathrooms, family room & laundry at 1st floor per plan. | $43,300 |