Back to kitchen remodel contractors
Wei Guo Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jul 2016
- Last 24 months
- 0 permits filed
41 permits since 2000: 36 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 15 completed. Typically 0 days from filing to permit and 157 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2015 | Completed final sign-off Dec 2015 | 2226 Noriega St | remodel 1 bathroom, bath tub to be shower, replace toilet and sink. 1 kitchen remodel: replace cabinets, counter top and sink of 2nd floor.Details
remodel 1 bathroom, bath tub to be shower, replace toilet and sink. 1 kitchen remodel: replace cabinets, counter top and sink of 2nd floor. | $18,000 |
| Aug 7, 2014 | Completed final sign-off Apr 2015 | 1234 Church St | add a new deck on 2nd floor. remodel kitchen and bathroom. remove walls per plan.Details
add a new deck on 2nd floor. remodel kitchen and bathroom. remove walls per plan. | $50,000 |
| Jun 6, 2013 | Completed final sign-off Aug 2013 | 950 Baker St | replace kitchen cabinets , sink , countertop and new lighting at second floor. lighting shall comply w/t-24Details
replace kitchen cabinets , sink , countertop and new lighting at second floor. lighting shall comply w/t-24 | $11,000 |
| Jun 12, 2012 | Completed final sign-off Nov 2012 | 1239 38th Av | replaced damaged wood in kitchen, bedroom, bathroom areas of ceiling and roofing framing. replace cabinets, tiles at kitchen. replace sink, tile at bathroom in 2nd floor. to repair fire damage only. contact district inspector at start of work prior to the start of actual repair work.Details
replaced damaged wood in kitchen, bedroom, bathroom areas of ceiling and roofing framing. replace cabinets, tiles at kitchen. replace sink, tile at bathroom in 2nd floor. to repair fire damage only. contact district inspector at start of work prior to the start of actual repair work. | $50,000 |
| Oct 26, 2011 | Completed final sign-off Oct 2012 | 1771 34th Av | replace kitchen cabinets and sink at 2/f, no structural work, new lighting comply with cec150(k).Details
replace kitchen cabinets and sink at 2/f, no structural work, new lighting comply with cec150(k). | $8,000 |
| Jun 7, 2010 | Completed final sign-off Feb 2011 | 145 Crestlake Dr | remodel kitchen at 2nd floor: replace existing cabinets, counter top sink, add one new sink. no new wall and no existing wall relocation.Details
remodel kitchen at 2nd floor: replace existing cabinets, counter top sink, add one new sink. no new wall and no existing wall relocation. | $12,000 |
| Jan 7, 2010 | Completed final sign-off Dec 2010 | 30 Brentwood Av | replace 7 windows in kind on front side. remodel kitchen at 2nd floor: repalce (e) cabients, add new lit, countertop sinkDetails
replace 7 windows in kind on front side. remodel kitchen at 2nd floor: repalce (e) cabients, add new lit, countertop sink | $12,000 |
| Feb 20, 2009 | Completed final sign-off Jun 2009 | 52 Melrose Av | remodel kitchen on 2nd floor.Details
remodel kitchen on 2nd floor. | $7,500 |
| Nov 28, 2007 | Completed final sign-off Jul 2008 | 110 Morningside Dr | remodel kitchen, 1/2 bath & laundry rm. areas; w/ all (n) lighting in kitchen area at least 50% lumens fluorescent, & bathrm. lighting to be fluorescent or occupancy sensor control. (removal of (2) non-structural walls between kitchen & breakfast area). (n) laundry location.Details
remodel kitchen, 1/2 bath & laundry rm. areas; w/ all (n) lighting in kitchen area at least 50% lumens fluorescent, & bathrm. lighting to be fluorescent or occupancy sensor control. (removal of (2) non-structural walls between kitchen & breakfast area). (n) laundry location. | $20,000 |
| Oct 11, 2007 | Completed final sign-off May 2008 | 1387 29th Av | remodel 1 kitchen. 1 bathroom & replace new gypsum board in 2 bedrooms. 1 living room. new kitchen lighting at least 50% lumens flourescent. bath lighting flourescent, or occ sensor control. plumbing & electrical under separate permit.Details
remodel 1 kitchen. 1 bathroom & replace new gypsum board in 2 bedrooms. 1 living room. new kitchen lighting at least 50% lumens flourescent. bath lighting flourescent, or occ sensor control. plumbing & electrical under separate permit. | $48,000 |
| Jan 5, 2006 | Completed final sign-off Jul 2006 | 1568 15th Av | replace cabinets in kitchen, replace toilet, shoerer pand, tile in bathroom. new lighting in bath & kitchen.Details
replace cabinets in kitchen, replace toilet, shoerer pand, tile in bathroom. new lighting in bath & kitchen. | $10,000 |
| Jan 5, 2004 | Completed final sign-off Feb 2004 | 798 Monterey Bl | #3d - replace cabinet in kitchenDetails
#3d - replace cabinet in kitchen | $4,200 |
| Nov 21, 2003 | Completed final sign-off Mar 2004 | 57 Lakeshore Dr | replace cabinets in kitchen,replace tile,2 sinks,2 toilets,2 showers in 2 bathsDetails
replace cabinets in kitchen,replace tile,2 sinks,2 toilets,2 showers in 2 baths | $10,300 |
| Nov 14, 2002 | Completed final sign-off Feb 2003 | 219 27th Av | replace tiles toilets & shower on 2 bathrms in #3.replace cabinets sink on kitchen in apt#3.Details
replace tiles toilets & shower on 2 bathrms in #3.replace cabinets sink on kitchen in apt#3. | $9,000 |
| Jan 22, 2002 | Completed final sign-off Mar 2002 | 2763 35th Av | replace cabinet in kitchen. replace toilet,sink,tile in bathroom.no structural work.Details
replace cabinet in kitchen. replace toilet,sink,tile in bathroom.no structural work. | $10,000 |