Back to bathroom remodel contractors
Wei Guo Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jul 2016
- Last 24 months
- 0 permits filed
41 permits since 2000: 36 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 16 completed, 4 expired or cancelled. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2016 | Completed final sign-off Jan 2016 | 1743 34th Av | revision to 201508144286. revise bathroom and laundry at gr floorDetails
revision to 201508144286. revise bathroom and laundry at gr floor | |
| Aug 14, 2015 | Completed final sign-off Jan 2016 | 1743 34th Av | convert (e) bathroom into two bathroom on 2nd floor. legalize (e) bedroom & (e) bathroom on ground floor.Details
convert (e) bathroom into two bathroom on 2nd floor. legalize (e) bedroom & (e) bathroom on ground floor. | $30,000 |
| Jul 30, 2015 | Completed final sign-off Dec 2015 | 2226 Noriega St | remodel 1 bathroom, bath tub to be shower, replace toilet and sink. 1 kitchen remodel: replace cabinets, counter top and sink of 2nd floor.Details
remodel 1 bathroom, bath tub to be shower, replace toilet and sink. 1 kitchen remodel: replace cabinets, counter top and sink of 2nd floor. | $18,000 |
| Aug 7, 2014 | Completed final sign-off Apr 2015 | 1234 Church St | add a new deck on 2nd floor. remodel kitchen and bathroom. remove walls per plan.Details
add a new deck on 2nd floor. remodel kitchen and bathroom. remove walls per plan. | $50,000 |
| Dec 27, 2013 | Expired or cancelled cancelled Feb 2015 | 2101 15th Av | replace toilet, sink (to be changed double sink), remove bath tub to be changed to jacuzzi @ 2nd floor.Details
replace toilet, sink (to be changed double sink), remove bath tub to be changed to jacuzzi @ 2nd floor. | $7,800 |
| Jun 12, 2012 | Completed final sign-off Nov 2012 | 1239 38th Av | replaced damaged wood in kitchen, bedroom, bathroom areas of ceiling and roofing framing. replace cabinets, tiles at kitchen. replace sink, tile at bathroom in 2nd floor. to repair fire damage only. contact district inspector at start of work prior to the start of actual repair work.Details
replaced damaged wood in kitchen, bedroom, bathroom areas of ceiling and roofing framing. replace cabinets, tiles at kitchen. replace sink, tile at bathroom in 2nd floor. to repair fire damage only. contact district inspector at start of work prior to the start of actual repair work. | $50,000 |
| Sep 3, 2009 | Completed final sign-off Aug 2010 | 69 Fernwood Dr | addition one family room & one bathroom on ground floor.Details
addition one family room & one bathroom on ground floor. | $38,000 |
| Feb 8, 2008 | Completed final sign-off Aug 2008 | 2475 37th Av | in ground floor: convert (e) storage room into two bedrooms, relocate bathroom and enlarge the window.Details
in ground floor: convert (e) storage room into two bedrooms, relocate bathroom and enlarge the window. | $43,000 |
| Nov 28, 2007 | Completed final sign-off Jul 2008 | 110 Morningside Dr | remodel kitchen, 1/2 bath & laundry rm. areas; w/ all (n) lighting in kitchen area at least 50% lumens fluorescent, & bathrm. lighting to be fluorescent or occupancy sensor control. (removal of (2) non-structural walls between kitchen & breakfast area). (n) laundry location.Details
remodel kitchen, 1/2 bath & laundry rm. areas; w/ all (n) lighting in kitchen area at least 50% lumens fluorescent, & bathrm. lighting to be fluorescent or occupancy sensor control. (removal of (2) non-structural walls between kitchen & breakfast area). (n) laundry location. | $20,000 |
| Oct 11, 2007 | Completed final sign-off May 2008 | 1387 29th Av | remodel 1 kitchen. 1 bathroom & replace new gypsum board in 2 bedrooms. 1 living room. new kitchen lighting at least 50% lumens flourescent. bath lighting flourescent, or occ sensor control. plumbing & electrical under separate permit.Details
remodel 1 kitchen. 1 bathroom & replace new gypsum board in 2 bedrooms. 1 living room. new kitchen lighting at least 50% lumens flourescent. bath lighting flourescent, or occ sensor control. plumbing & electrical under separate permit. | $48,000 |
| Jan 22, 2007 | Completed final sign-off Jun 2007 | 2550 33rd Av | build 2 storage rooms and one bathroom on g/f. storage areas are non habitable rooms.Details
build 2 storage rooms and one bathroom on g/f. storage areas are non habitable rooms. | $40,000 |
| Apr 25, 2006 | Expired or cancelled expired Dec 2007 | 2559 15th Av | replace vanity and top. toilet. put tile on walls & floor. in 3rd floor bathroom (in kind)Details
replace vanity and top. toilet. put tile on walls & floor. in 3rd floor bathroom (in kind) | $4,500 |
| Jan 5, 2006 | Completed final sign-off Jul 2006 | 1568 15th Av | replace cabinets in kitchen, replace toilet, shoerer pand, tile in bathroom. new lighting in bath & kitchen.Details
replace cabinets in kitchen, replace toilet, shoerer pand, tile in bathroom. new lighting in bath & kitchen. | $10,000 |
| Dec 2, 2005 | Completed final sign-off Feb 2006 | 798 Monterey Bl | repace sink, bathtub, toilet. add install tile in bathroomDetails
repace sink, bathtub, toilet. add install tile in bathroom | $2,300 |
| Feb 11, 2004 | Completed final sign-off Apr 2004 | 10 Scotia Av | to be building one bath rm. one bed rm one storage rm laundry in g/fDetails
to be building one bath rm. one bed rm one storage rm laundry in g/f | $12,000 |
| Nov 21, 2003 | Completed final sign-off Mar 2004 | 57 Lakeshore Dr | replace cabinets in kitchen,replace tile,2 sinks,2 toilets,2 showers in 2 bathsDetails
replace cabinets in kitchen,replace tile,2 sinks,2 toilets,2 showers in 2 baths | $10,300 |
| May 10, 2002 | Expired or cancelled expired Sep 2002 | 1901 17th Av | replace tile for wall and floor in ground floor bathroomDetails
replace tile for wall and floor in ground floor bathroom | $2,800 |
| Jan 22, 2002 | Completed final sign-off Mar 2002 | 2763 35th Av | replace cabinet in kitchen. replace toilet,sink,tile in bathroom.no structural work.Details
replace cabinet in kitchen. replace toilet,sink,tile in bathroom.no structural work. | $10,000 |
| Oct 25, 2000 | Expired or cancelled expired Mar 2001 | 2071 42nd Av | remove one bathroom on 2nd fl, new toilet, new basin, tile walls & floorsDetails
remove one bathroom on 2nd fl, new toilet, new basin, tile walls & floors | $3,600 |
| Mar 22, 2000 | Completed final sign-off Jul 2000 | 47 Baywood Ct | addition 2 bedrooms, 1 full bathroom, 1 storage on grd floorDetails
addition 2 bedrooms, 1 full bathroom, 1 storage on grd floor | $14,000 |