Back to kitchen remodel contractors
Webcor Construction Lp
- Based in
- Alameda
- On San Francisco permits
- Nov 2001 to Mar 2026
- Last 24 months
- 12 permits filed
496 permits since 2000: 370 completed, 10 in progress, 78 never finaled, 38 expired or cancelled.
Of the 78 never-finaled permits, 5 are 3 to 5 years old, 41 are 5 to 10 years old, 32 are over 10 years old. 16 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 16 completed. Typically 56 days from filing to permit and 488 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 7, 2021 | Completed final sign-off Nov 2022 | 72 Ellis St | place of assembly permit operation: purpose: to operate warming kitchen on 3/f of hotel.Details
place of assembly permit operation: purpose: to operate warming kitchen on 3/f of hotel. | |
| Jul 23, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | mep for new kitchen and dining area on 25th floor. arch app#201904269208. n/a for maher. revision to arch for 2-hr rated horizontal enclosure around grease duct. type 1 kitchen hoods to be submitted under separate permit.Details
mep for new kitchen and dining area on 25th floor. arch app#201904269208. n/a for maher. revision to arch for 2-hr rated horizontal enclosure around grease duct. type 1 kitchen hoods to be submitted under separate permit. | $800,000 |
| Apr 29, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | 26th fl - arch only. new kitchen and dining areas. construction of new non-structural partition, acoustical grid & tile gyp board ceiings, millwork finishes, fire alarm, sprinklers, ansul & mep on separate permitDetails
26th fl - arch only. new kitchen and dining areas. construction of new non-structural partition, acoustical grid & tile gyp board ceiings, millwork finishes, fire alarm, sprinklers, ansul & mep on separate permit | $1,315,440 |
| Apr 29, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | 28th fl - arch only. new kitchen and dining areas. construction of new non-structural partition, acoustical grid & tile gyp board ceiings, millwork finishes, fire alarm, sprinklers, ansul & mep on separate permitDetails
28th fl - arch only. new kitchen and dining areas. construction of new non-structural partition, acoustical grid & tile gyp board ceiings, millwork finishes, fire alarm, sprinklers, ansul & mep on separate permit | $1,315,440 |
| Apr 29, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | 25th fl - arch only. new kitchen and dining areas. construction of new non-structural partition, acoustical grid & tile gyp board ceiings, millwork finishes, fire alarm, sprinklers, ansul & mep on separate permitDetails
25th fl - arch only. new kitchen and dining areas. construction of new non-structural partition, acoustical grid & tile gyp board ceiings, millwork finishes, fire alarm, sprinklers, ansul & mep on separate permit | $1,315,440 |
| Mar 22, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | 12th fl - ti with new kitchen and servery. new bearing partitions, horizontal exiting, patio seating, fire alarm, sprinklers & convenience stairs on separate permitDetails
12th fl - ti with new kitchen and servery. new bearing partitions, horizontal exiting, patio seating, fire alarm, sprinklers & convenience stairs on separate permit | $3,800,000 |
| Mar 22, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | 11th fl - ti with new kitchen and mechanical rooms. convenience stair; fire alarm & sprinklers on separate permitDetails
11th fl - ti with new kitchen and mechanical rooms. convenience stair; fire alarm & sprinklers on separate permit | $3,800,000 |
| Jan 26, 2016 | Completed final sign-off Dec 2016 | 401 Harrison St | replace kitchen and lav counter tops: units l24-2401,2402,2403,2405,2406,2407,2408: l25-2501,2502,2503,2505,2506,2507,2508: l26-2601,2602,2603,2605,2606,2607,2608: l27-2701,2702,2703,2705,2706,2707.2708: l36-3601,3601,3602,3603,3605,3606,3607,3608: l43-4301,4302,4303,4304,4305,4306,4307(42 units)Details
replace kitchen and lav counter tops: units l24-2401,2402,2403,2405,2406,2407,2408: l25-2501,2502,2503,2505,2506,2507,2508: l26-2601,2602,2603,2605,2606,2607,2608: l27-2701,2702,2703,2705,2706,2707.2708: l36-3601,3601,3602,3603,3605,3606,3607,3608: l43-4301,4302,4303,4304,4305,4306,4307(42 units) | $126,000 |
| Jan 26, 2016 | Completed final sign-off Dec 2016 | 401 Harrison St | replace kitchen & lav countertops for units l40-4001, 4005, 4007, l44-4401, 4405, 4407 - l45-4501, 4505, 4507 - l46-4601, 4605, 4607 (12 units) maher naDetails
replace kitchen & lav countertops for units l40-4001, 4005, 4007, l44-4401, 4405, 4407 - l45-4501, 4505, 4507 - l46-4601, 4605, 4607 (12 units) maher na | $36,000 |
| Jan 26, 2016 | Completed final sign-off Jul 2016 | 401 Harrison St | replace kitchen and lav counter tops: l5-501,502,503,504,505,506,507: l9-901,902,903,904,905,906,907,908: l11-1101,1102,1103,1104,1105,1106,1108: l18-1801,1802,1803,1805,1806,1807,1808: l19-1901,1902,1903,1905,1906,1907,1908: l28-2801,2802,2803,2805,2806,2807,2808Details
replace kitchen and lav counter tops: l5-501,502,503,504,505,506,507: l9-901,902,903,904,905,906,907,908: l11-1101,1102,1103,1104,1105,1106,1108: l18-1801,1802,1803,1805,1806,1807,1808: l19-1901,1902,1903,1905,1906,1907,1908: l28-2801,2802,2803,2805,2806,2807,2808 | $129,000 |
| Jan 26, 2016 | Completed final sign-off Nov 2016 | 401 Harrison St | replace kitchen and lav counter tops for units: l29-2901,2902,2903,2905,2906,2907,2908: l30-3001,3002,3003,3005,3006,3007,3008: l31-3101,3102,3103,3105,3106,3107,3108: l39-3901,3902,3903,3905,3906,3907,3908: l41-4101,4103,4105,4107: l42-4201,4203,4205,4207.Details
replace kitchen and lav counter tops for units: l29-2901,2902,2903,2905,2906,2907,2908: l30-3001,3002,3003,3005,3006,3007,3008: l31-3101,3102,3103,3105,3106,3107,3108: l39-3901,3902,3903,3905,3906,3907,3908: l41-4101,4103,4105,4107: l42-4201,4203,4205,4207. | $108,000 |
| Dec 14, 2015 | Completed final sign-off Nov 2016 | 401 Harrison St | replace kitchen & lav tops. l6- 601,602,603,604,605,606,607. l7 - 701,702,703,704,705,706,707. l8 - 801,802,803,804,805,806,807. l17 -1701,1702,1703,1704,1705,1706,1707,1708. l20 - 2001,2002,2003,2005,2006,2007,2008. l21 - 2101,2102,2103,2105,2106,2107,2108. (43 total). n/a maher ordinanceDetails
replace kitchen & lav tops. l6- 601,602,603,604,605,606,607. l7 - 701,702,703,704,705,706,707. l8 - 801,802,803,804,805,806,807. l17 -1701,1702,1703,1704,1705,1706,1707,1708. l20 - 2001,2002,2003,2005,2006,2007,2008. l21 - 2101,2102,2103,2105,2106,2107,2108. (43 total). n/a maher ordinance | $135,000 |
| Dec 14, 2015 | Completed final sign-off May 2016 | 401 Harrison St | replace kitchen & lav tops. l10-units 1001,1002,1003,1004,1005,1006,1007,1008. l14-1401,1402,1403,1404,1405,1406,1407,1408. l15-1501,1502,1503,1504,1505,1506,1507,1508. l33-3301,3302,3303,3305,3306,3307,3308. l34-3401,3402,3403,3405,3406,3407,3408. l35- 3501,3502,3503,3505,3506,3507,3508. (45 total)Details
replace kitchen & lav tops. l10-units 1001,1002,1003,1004,1005,1006,1007,1008. l14-1401,1402,1403,1404,1405,1406,1407,1408. l15-1501,1502,1503,1504,1505,1506,1507,1508. l33-3301,3302,3303,3305,3306,3307,3308. l34-3401,3402,3403,3405,3406,3407,3408. l35- 3501,3502,3503,3505,3506,3507,3508. (45 total) | $135,000 |
| Oct 28, 2014 | Completed final sign-off Mar 2017 | 28 South Park | change of use from a salon to a office space on first floor. demo of existing shelves and sink. install a new kitchenette and sink per plan.Details
change of use from a salon to a office space on first floor. demo of existing shelves and sink. install a new kitchenette and sink per plan. | $2,000 |
| Mar 7, 2007 | Completed final sign-off Apr 2009 | 726 Sutter St | remodel of the canterbury hotel and whitehall inn, including a seismic retrofit at whitehall, seismic strengthening at canterbury, and remodeling hotel rooms at both buildings into one- bedroom units and larger suites, all with full kitchens.Details
remodel of the canterbury hotel and whitehall inn, including a seismic retrofit at whitehall, seismic strengthening at canterbury, and remodeling hotel rooms at both buildings into one- bedroom units and larger suites, all with full kitchens. | $20,000,000 |
| Mar 9, 2005 | Completed final sign-off Aug 2007 | 125 03rd St | revision to pa# 2000/08/30/9233. revision to interior floor plans, construction of kitchen, adminDetails
revision to pa# 2000/08/30/9233. revision to interior floor plans, construction of kitchen, admin | $2,000,000 |