Permit GraphShortlistSan Francisco building permits since 2000

Wayne Burkholder Construction

Contractor license
985282
State license record
Based in
Pleasanton
On San Francisco permits
Jul 2018 to Jul 2018
Last 24 months
0 permits filed

1 permit since 2000: 1 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllKitchen remodel 1Bathroom remodel 1

1 kitchen remodel permit: 1 completed. Typically 59 days from filing to permit and 98 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 2, 2018Completed
final sign-off Dec 2018
301 Bryant Stunit d25: interior remodel only. remove and replace existing kitchen. remove and replace existing fixtures & finishes in bathroom. replace in kind. kitchen: 6'-8"x11'. bath: 6'6"x9'. install floor tile throughout.
Details
Permit
201807023531
Status
complete
Filed
Jul 2, 2018
Permit issued
Aug 30, 2018
Final sign-off
Dec 6, 2018
Declared cost
$25,000
Address
301 Bryant St

unit d25: interior remodel only. remove and replace existing kitchen. remove and replace existing fixtures & finishes in bathroom. replace in kind. kitchen: 6'-8"x11'. bath: 6'6"x9'. install floor tile throughout.

Open the permit page

$25,000