Back to bathroom remodel contractors
Wayne Burkholder Construction
- Based in
- Pleasanton
- On San Francisco permits
- Jul 2018 to Jul 2018
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 59 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2018 | Completed final sign-off Dec 2018 | 301 Bryant St | unit d25: interior remodel only. remove and replace existing kitchen. remove and replace existing fixtures & finishes in bathroom. replace in kind. kitchen: 6'-8"x11'. bath: 6'6"x9'. install floor tile throughout.Details
unit d25: interior remodel only. remove and replace existing kitchen. remove and replace existing fixtures & finishes in bathroom. replace in kind. kitchen: 6'-8"x11'. bath: 6'6"x9'. install floor tile throughout. | $25,000 |