Waters And Waters
- Based in
- Millbrae
- On San Francisco permits
- Oct 2013 to Jun 2026
- Last 24 months
- 9 permits filed
58 permits since 2000: 37 completed, 7 in progress, 7 never finaled, 7 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
6 deck permits: 4 completed, 1 in progress, 1 never finaled. Typically 100 days from filing to permit and 1040 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 11, 2025 | In progress issued Jul 2025 | 638 Rhode Island St | (n) exterior deck, (n) exterior stair to (n) 3rd fl deck, (n) roof deck, (n) spiral stair to (n) roof deck, (n) window and (n) door at 3rd fl. ref pa# 2023-0203-1391 for additional scope of work to 3rd fl.Details
(n) exterior deck, (n) exterior stair to (n) 3rd fl deck, (n) roof deck, (n) spiral stair to (n) roof deck, (n) window and (n) door at 3rd fl. ref pa# 2023-0203-1391 for additional scope of work to 3rd fl. | $68,000 |
| Apr 10, 2019 | Never finaled issued Jun 2019, no final | 917 Rhode Island St | revision to app# 201406178580. 1)infill extg openings in foundation wall with new reinforced concrete. 2)add steel beam and metal decking to re establish extg walkway. 3) add framing ledger to extg conc. walls.Details
revision to app# 201406178580. 1)infill extg openings in foundation wall with new reinforced concrete. 2)add steel beam and metal decking to re establish extg walkway. 3) add framing ledger to extg conc. walls. | $8,000 |
| Jul 10, 2018 | Completed final sign-off Jun 2021 | 378 Franconia St | build deck under 10 ft high from finish floor to surface, 2 openings to access deck, lights and recepticlesDetails
build deck under 10 ft high from finish floor to surface, 2 openings to access deck, lights and recepticles | $15,000 |
| Jun 30, 2017 | Completed final sign-off Apr 2019 | 126 Dolores St | proposed new deck at second floor at rear of house.Details
proposed new deck at second floor at rear of house. | $5,000 |
| Mar 10, 2017 | Completed final sign-off Apr 2021 | 126 Dolores St | interior remodel to include 1st fl new bath, new kitchen and bath 0n 2nd fl, interior upgrades to existing baths on 3rd fl. rear facade get window door upgrades and 3rd fl deck will be removed. new exterior siding throughout rearDetails
interior remodel to include 1st fl new bath, new kitchen and bath 0n 2nd fl, interior upgrades to existing baths on 3rd fl. rear facade get window door upgrades and 3rd fl deck will be removed. new exterior siding throughout rear | $95,000 |
| Sep 30, 2015 | Completed final sign-off Sep 2019 | 1542 20th Av | 3-story addition @ rear of property & deck. some remodeling inside. infill old stairwell to create new laundry @ 2nd & 3rd floors.Details
3-story addition @ rear of property & deck. some remodeling inside. infill old stairwell to create new laundry @ 2nd & 3rd floors. | $142,000 |