Waho Builders
- Based in
- Pacifica
- On San Francisco permits
- Mar 2000 to Mar 2017
- Last 24 months
- 0 permits filed
41 permits since 2000: 33 completed, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 2 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 18, 2014 | Completed final sign-off Jun 2014 | 68 Whitney St | replace the extg front entry stairs in-kind. new stairs and railings as per s.f. bldg code. all changes in the stair configuration are required in order for the new stairs to be code compliant. replace the ground fl. bay window with a new door. no other visual changes to the front elevation.Details
replace the extg front entry stairs in-kind. new stairs and railings as per s.f. bldg code. all changes in the stair configuration are required in order for the new stairs to be code compliant. replace the ground fl. bay window with a new door. no other visual changes to the front elevation. | $53,000 |
| Nov 25, 2013 | Completed final sign-off Mar 2016 | 428 Chenery St | vertical addition @ (e) attic space for new stair & bathroom.Details
vertical addition @ (e) attic space for new stair & bathroom. | $140,000 |
| Mar 31, 2009 | Completed final sign-off Apr 2009 | 512 Chenery St | remove (e) exterior staircase. rebuild staircase at front.Details
remove (e) exterior staircase. rebuild staircase at front. | $9,200 |
| May 24, 2002 | Completed final sign-off Jun 2002 | 161 Randall St | tile (e) concrete entry stairsDetails
tile (e) concrete entry stairs | $800 |