Back to bathroom remodel contractors
Waho Builders
- Based in
- Pacifica
- On San Francisco permits
- Mar 2000 to Mar 2017
- Last 24 months
- 0 permits filed
41 permits since 2000: 33 completed, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 never finaled. Typically 7 days from filing to permit and 129 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2017 | Completed final sign-off Jul 2017 | 115 Granville Wy | 2/f: bathroom remodel: replacing all fixtures & finsihes. remove non-bearing wall, replace 2 (e) windows w/ smaller more efficieant units; lighting upgrades.Details
2/f: bathroom remodel: replacing all fixtures & finsihes. remove non-bearing wall, replace 2 (e) windows w/ smaller more efficieant units; lighting upgrades. | $30,000 |
| Jun 20, 2014 | Never finaled issued Jun 2014, no final | 44 Cumberland St | revision to app#201312305269. remodel kitchen and bathroom per district inspector comments.Details
revision to app#201312305269. remodel kitchen and bathroom per district inspector comments. | |
| Apr 11, 2014 | Completed final sign-off Jan 2015 | 4020 18th St | kitchen remodel to replace cabinets, appliances & finishes, selective demolitoin, reconfigure rear facing window & door. documentation of (e) conditions of ground floor including bedroom, bathroom & living area.Details
kitchen remodel to replace cabinets, appliances & finishes, selective demolitoin, reconfigure rear facing window & door. documentation of (e) conditions of ground floor including bedroom, bathroom & living area. | $50,000 |
| Nov 25, 2013 | Completed final sign-off Mar 2016 | 428 Chenery St | vertical addition @ (e) attic space for new stair & bathroom.Details
vertical addition @ (e) attic space for new stair & bathroom. | $140,000 |
| Dec 1, 2011 | Completed final sign-off Aug 2012 | 137 Pierce St | #139 (4th floor): remodel existing kitchen, open up to dining, add 1/2 bath w/shower, create office/work space at front rooms. #137 (3rd floor): add 1/2 bath w/shower in util closet area. water heater and fau under separate permit.Details
#139 (4th floor): remodel existing kitchen, open up to dining, add 1/2 bath w/shower, create office/work space at front rooms. #137 (3rd floor): add 1/2 bath w/shower in util closet area. water heater and fau under separate permit. | $95,000 |
| Sep 1, 2011 | Completed final sign-off Dec 2011 | 15 Whitney St | remodel of two existing bathrooms and existing closet. relocate bathroom door. install new headers above new door openings. provide carbon monoxide alarm, one per level.Details
remodel of two existing bathrooms and existing closet. relocate bathroom door. install new headers above new door openings. provide carbon monoxide alarm, one per level. | $50,000 |
| Aug 18, 2010 | Completed final sign-off Oct 2010 | 428 Chenery St | replace plumbing fixtures and finish interiors of existing one bathroom, switch location of sink and toilet, no new lighting, no structural workDetails
replace plumbing fixtures and finish interiors of existing one bathroom, switch location of sink and toilet, no new lighting, no structural work | $6,750 |
| Sep 15, 2008 | Completed final sign-off Feb 2009 | 512 Chenery St | remodel bathroom into 2 bathrooms within (e) footprint, including non-structural wall removal of closets. remodel kitchen & add pantry.Details
remodel bathroom into 2 bathrooms within (e) footprint, including non-structural wall removal of closets. remodel kitchen & add pantry. | $30,000 |
| Jun 29, 2005 | Completed final sign-off Aug 2005 | 1419 16th Av | revision to 200505061745 to finish ground floor bathroom.Details
revision to 200505061745 to finish ground floor bathroom. | $5,800 |