Back to kitchen remodel contractors
W S K Construction
- Based in
- Daly City
- On San Francisco permits
- Nov 2011 to Oct 2025
- Last 24 months
- 1 permit filed
38 permits since 2000: 26 completed, 1 in progress, 9 never finaled, 2 expired or cancelled.
Of the 9 never-finaled permits, 5 are 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 2 never finaled. Typically 1 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2025 | Completed final sign-off Jul 2026 | 1726 Washington St | remodel kitchen and bathroom. add shower to (e) powder room per plan. no exterior work.Details
remodel kitchen and bathroom. add shower to (e) powder room per plan. no exterior work. | $54,000 |
| May 19, 2023 | Never finaled issued May 2023, no final | 2100 15th Av | revision to pa 2022-0722-9182. install new sheetrock in the whole house. replace broken windows in the bedroom facing the backyard and in kitchen - interior workDetails
revision to pa 2022-0722-9182. install new sheetrock in the whole house. replace broken windows in the bedroom facing the backyard and in kitchen - interior work | $1,000 |
| Nov 17, 2021 | Completed final sign-off Apr 2022 | 1324 Jessie St | to comply with nov# 202184283: remodel one kitchen and one bathroom. replace 3 windows and comply with pid# 202184284Details
to comply with nov# 202184283: remodel one kitchen and one bathroom. replace 3 windows and comply with pid# 202184284 | $41,000 |
| Mar 5, 2021 | Completed final sign-off Mar 2022 | 2028 Sloat Bl | remodel (e) kitchen, bathroom & powder room. add 1 full bathroom on 2/f.Details
remodel (e) kitchen, bathroom & powder room. add 1 full bathroom on 2/f. | $43,000 |
| Feb 8, 2021 | Completed final sign-off Jul 2021 | 570 38th Av | remodel kitchen.install recessed light. install plumbing fixtures.Details
remodel kitchen.install recessed light. install plumbing fixtures. | $18,000 |
| Jun 3, 2020 | Completed final sign-off Mar 2021 | 307 Bartlett St | unit #2 - remodel kitchen and bathroom. replace electrical sub-panel. all work in-kind.Details
unit #2 - remodel kitchen and bathroom. replace electrical sub-panel. all work in-kind. | $26,000 |
| Dec 3, 2014 | Completed final sign-off Jul 2015 | 43 Ruth St | 1st flr: add family room, 1 bedroom, and 1/2 bath. 2nd flr: remodel kitchen and bathroom, adding new deck at rear.Details
1st flr: add family room, 1 bedroom, and 1/2 bath. 2nd flr: remodel kitchen and bathroom, adding new deck at rear. | $60,000 |
| Jan 6, 2014 | Completed final sign-off Mar 2014 | 135 Clipper St | remodel unit 12. kitchen, bath, replace subpanel, sheetrock and wiring. no structural. same layout. no windowsDetails
remodel unit 12. kitchen, bath, replace subpanel, sheetrock and wiring. no structural. same layout. no windows | $53,000 |
| Dec 23, 2013 | Completed final sign-off Mar 2014 | 2160 Taylor St | replace kitchen cabinets and counter top, update electrical, new subpanel, remodel bathroom, new hardwood floor for apt #3; new subpanel, tile kitchen floor, paint entire unit apt #2Details
replace kitchen cabinets and counter top, update electrical, new subpanel, remodel bathroom, new hardwood floor for apt #3; new subpanel, tile kitchen floor, paint entire unit apt #2 | $16,000 |
| Apr 11, 2012 | Never finaled issued Apr 2012, no final | 332 Clement St | plumbing reinstall sink in kitchen, replace some of the outlet in kitchen and repaint interior, carpentry, replace tile in living around 850 sq.ft. no structural work.Details
plumbing reinstall sink in kitchen, replace some of the outlet in kitchen and repaint interior, carpentry, replace tile in living around 850 sq.ft. no structural work. | $3,500 |
| Nov 28, 2011 | Completed final sign-off Jan 2012 | 2570 29th Av | remodel kitchen ( replace cabinets, counter tops, retile floor change outlets to gfci); retile bathroom floorDetails
remodel kitchen ( replace cabinets, counter tops, retile floor change outlets to gfci); retile bathroom floor | $10,000 |