Back to bathroom remodel contractors
W S K Construction
- Based in
- Daly City
- On San Francisco permits
- Nov 2011 to Oct 2025
- Last 24 months
- 1 permit filed
38 permits since 2000: 26 completed, 1 in progress, 9 never finaled, 2 expired or cancelled.
Of the 9 never-finaled permits, 5 are 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 14 completed, 2 never finaled. Typically 4 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2025 | Completed final sign-off Jul 2026 | 1726 Washington St | remodel kitchen and bathroom. add shower to (e) powder room per plan. no exterior work.Details
remodel kitchen and bathroom. add shower to (e) powder room per plan. no exterior work. | $54,000 |
| Apr 25, 2024 | Completed final sign-off Jul 2024 | 1845 Lincoln Wy | unit 1- remodel kitchn and bathroom no walls will be added or removedDetails
unit 1- remodel kitchn and bathroom no walls will be added or removed | $28,000 |
| Aug 18, 2023 | Completed final sign-off Feb 2024 | 1845 Lincoln Wy | unit #2: remodel bathroom. see complaint #202312279.Details
unit #2: remodel bathroom. see complaint #202312279. | $7,800 |
| Jul 22, 2022 | Completed final sign-off Oct 2023 | 2100 15th Av | reconfigure (e) stair from 2nd floor to ground fl. remodel (e) bathroom and add 1 new bath at 2nd floor. relocate (e) bath and add 1 new home office and laundry at g/f. replace/add new windows per plan.Details
reconfigure (e) stair from 2nd floor to ground fl. remodel (e) bathroom and add 1 new bath at 2nd floor. relocate (e) bath and add 1 new home office and laundry at g/f. replace/add new windows per plan. | $65,000 |
| Jul 21, 2022 | Completed final sign-off Jan 2023 | 81 Beaumont Av | unit 81: convert family room to office and bath at 1st fl. unit 83: convert family room to bedroom and bath at 4tth fl.Details
unit 81: convert family room to office and bath at 1st fl. unit 83: convert family room to bedroom and bath at 4tth fl. | $45,000 |
| Apr 27, 2022 | Never finaled issued Apr 2022, no final | 81 Beaumont Av | repair and replace dryrot and damaged drywall approx 100 sq ft found floor underneath 2nd floor bathroom. less than 50% repair.Details
repair and replace dryrot and damaged drywall approx 100 sq ft found floor underneath 2nd floor bathroom. less than 50% repair. | $3,000 |
| Dec 13, 2021 | Completed final sign-off Apr 2022 | 3365 17th St | unit 3365: add 1 full bath, relocate washer and dryer. unit 3367: add 1 full bath, relocate washer and dryer.Details
unit 3365: add 1 full bath, relocate washer and dryer. unit 3367: add 1 full bath, relocate washer and dryer. | $30,000 |
| Nov 17, 2021 | Completed final sign-off Apr 2022 | 1324 Jessie St | to comply with nov# 202184283: remodel one kitchen and one bathroom. replace 3 windows and comply with pid# 202184284Details
to comply with nov# 202184283: remodel one kitchen and one bathroom. replace 3 windows and comply with pid# 202184284 | $41,000 |
| Mar 5, 2021 | Completed final sign-off Mar 2022 | 2028 Sloat Bl | remodel (e) kitchen, bathroom & powder room. add 1 full bathroom on 2/f.Details
remodel (e) kitchen, bathroom & powder room. add 1 full bathroom on 2/f. | $43,000 |
| Jun 3, 2020 | Completed final sign-off Mar 2021 | 307 Bartlett St | unit #2 - remodel kitchen and bathroom. replace electrical sub-panel. all work in-kind.Details
unit #2 - remodel kitchen and bathroom. replace electrical sub-panel. all work in-kind. | $26,000 |
| Mar 15, 2018 | Completed final sign-off Dec 2020 | 71 Mount Vernon Av | add half bathroom , 1 each laundry room, exercise room and 1 computer room on 1st flrDetails
add half bathroom , 1 each laundry room, exercise room and 1 computer room on 1st flr | $40,000 |
| Dec 3, 2014 | Completed final sign-off Jul 2015 | 43 Ruth St | 1st flr: add family room, 1 bedroom, and 1/2 bath. 2nd flr: remodel kitchen and bathroom, adding new deck at rear.Details
1st flr: add family room, 1 bedroom, and 1/2 bath. 2nd flr: remodel kitchen and bathroom, adding new deck at rear. | $60,000 |
| Jan 6, 2014 | Completed final sign-off Mar 2014 | 135 Clipper St | remodel unit 12. kitchen, bath, replace subpanel, sheetrock and wiring. no structural. same layout. no windowsDetails
remodel unit 12. kitchen, bath, replace subpanel, sheetrock and wiring. no structural. same layout. no windows | $53,000 |
| Dec 23, 2013 | Completed final sign-off Mar 2014 | 2160 Taylor St | replace kitchen cabinets and counter top, update electrical, new subpanel, remodel bathroom, new hardwood floor for apt #3; new subpanel, tile kitchen floor, paint entire unit apt #2Details
replace kitchen cabinets and counter top, update electrical, new subpanel, remodel bathroom, new hardwood floor for apt #3; new subpanel, tile kitchen floor, paint entire unit apt #2 | $16,000 |
| Jun 27, 2012 | Never finaled issued Jul 2012, no final | 244 University St | add 1 bedroom, 1 storage room, 1 family room & 1 full bathroom at ground floor. no structural work. no work on 2nd floorDetails
add 1 bedroom, 1 storage room, 1 family room & 1 full bathroom at ground floor. no structural work. no work on 2nd floor | $50,000 |
| Nov 28, 2011 | Completed final sign-off Jan 2012 | 2570 29th Av | remodel kitchen ( replace cabinets, counter tops, retile floor change outlets to gfci); retile bathroom floorDetails
remodel kitchen ( replace cabinets, counter tops, retile floor change outlets to gfci); retile bathroom floor | $10,000 |