Back to kitchen remodel contractors
W N G S Construction
- Based in
- San Bruno
- On San Francisco permits
- Feb 2010 to Dec 2025
- Last 24 months
- 1 permit filed
49 permits since 2000: 34 completed, 2 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2025 | Completed final sign-off Apr 2026 | 15 Venus St | kitchen and two baths remodel. no removeal at walls replace fixture in-kind.Details
kitchen and two baths remodel. no removeal at walls replace fixture in-kind. | $50,000 |
| Oct 2, 2023 | Completed final sign-off Jan 2024 | 951 Brussels St | in-kind replacement of plumbing, electrical fixtures remodel kitchen and 1 bath, no removal of walls , dry rot repair for approx. 100sfDetails
in-kind replacement of plumbing, electrical fixtures remodel kitchen and 1 bath, no removal of walls , dry rot repair for approx. 100sf | $40,000 |
| May 19, 2023 | Completed final sign-off Sep 2023 | 2241 Judah St | to comply with nov 202305675. replacing the ceiling and wall gypsum board in the front seating area with equivalent materials. installing new counter space. remove non-bearing wall, and adding 3 commercial kitchen appliances and one mop sink to the 1/f restaurant space.Details
to comply with nov 202305675. replacing the ceiling and wall gypsum board in the front seating area with equivalent materials. installing new counter space. remove non-bearing wall, and adding 3 commercial kitchen appliances and one mop sink to the 1/f restaurant space. | $15,000 |
| Apr 26, 2022 | Completed final sign-off Jun 2023 | 1100 Eddy St | unit h: in kind remodel of kitchen & (2) baths. no removal of walls. to comply to complaints 202289780 and 202289779. kitchen: cabinets, appliances, countertop, hood, electrical. baths: shower vanity, tiles.Details
unit h: in kind remodel of kitchen & (2) baths. no removal of walls. to comply to complaints 202289780 and 202289779. kitchen: cabinets, appliances, countertop, hood, electrical. baths: shower vanity, tiles. | $35,000 |
| Aug 28, 2017 | Completed final sign-off Nov 2019 | 740 Hyde St | work in (3) units; update of 3 kitchens (3 stroies) and update of 3 bathrooms (3 stories) -a replace all windows front and rear. at front, wood frames; (45) total windows, same size/location, max u-factor 0.32; update electricalDetails
work in (3) units; update of 3 kitchens (3 stroies) and update of 3 bathrooms (3 stories) -a replace all windows front and rear. at front, wood frames; (45) total windows, same size/location, max u-factor 0.32; update electrical | $147,000 |
| Jul 10, 2017 | Completed final sign-off Sep 2017 | 481 Minna St | in manager apartment - remodel kitchen and run new electrical in living room, 180 sq.ft. in reception area- new electrical and remodel 120 sq.ft.Details
in manager apartment - remodel kitchen and run new electrical in living room, 180 sq.ft. in reception area- new electrical and remodel 120 sq.ft. | $10,000 |
| Oct 18, 2016 | Completed final sign-off Aug 2017 | 1982 Palou Av | add 3 baths, 3 rooms, remodel kitchen and existing bath. street facing windows to be wood aluminum clad. interior wall demo not to exceed 75%Details
add 3 baths, 3 rooms, remodel kitchen and existing bath. street facing windows to be wood aluminum clad. interior wall demo not to exceed 75% | $70,000 |
| Jan 30, 2015 | Expired or cancelled cancelled Jun 2015 | 6509 Geary Bl | add to scope: remove wall (non-structural)between kitchen and living room.Details
add to scope: remove wall (non-structural)between kitchen and living room. | |
| Jan 15, 2015 | Completed final sign-off Jun 2015 | 6509 Geary Bl | #204- remodel kitchen & bath, move electrical panel out of closet.Details
#204- remodel kitchen & bath, move electrical panel out of closet. | $12,000 |