Back to bathroom remodel contractors
W N G S Construction
- Based in
- San Bruno
- On San Francisco permits
- Feb 2010 to Dec 2025
- Last 24 months
- 1 permit filed
49 permits since 2000: 34 completed, 2 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 12 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2025 | Completed final sign-off Apr 2026 | 15 Venus St | kitchen and two baths remodel. no removeal at walls replace fixture in-kind.Details
kitchen and two baths remodel. no removeal at walls replace fixture in-kind. | $50,000 |
| Nov 29, 2023 | Completed final sign-off Dec 2024 | 2524 Lombard St | replace floor tile with ceramic tile in bathrooms, repaint all bathrooms, replace sink cabinets in all bathrooms, replace toilets. ( 5 bathrooms all on the second floor)Details
replace floor tile with ceramic tile in bathrooms, repaint all bathrooms, replace sink cabinets in all bathrooms, replace toilets. ( 5 bathrooms all on the second floor) | $3,000 |
| Oct 5, 2023 | Completed final sign-off Jan 2024 | 951 Brussels St | add bathroom in bedroom on 1st floor. to replace existing (7) single pane windows with new double pane windowsDetails
add bathroom in bedroom on 1st floor. to replace existing (7) single pane windows with new double pane windows | $25,000 |
| Oct 2, 2023 | Completed final sign-off Jan 2024 | 951 Brussels St | in-kind replacement of plumbing, electrical fixtures remodel kitchen and 1 bath, no removal of walls , dry rot repair for approx. 100sfDetails
in-kind replacement of plumbing, electrical fixtures remodel kitchen and 1 bath, no removal of walls , dry rot repair for approx. 100sf | $40,000 |
| Apr 26, 2022 | Completed final sign-off Jun 2023 | 1100 Eddy St | unit h: in kind remodel of kitchen & (2) baths. no removal of walls. to comply to complaints 202289780 and 202289779. kitchen: cabinets, appliances, countertop, hood, electrical. baths: shower vanity, tiles.Details
unit h: in kind remodel of kitchen & (2) baths. no removal of walls. to comply to complaints 202289780 and 202289779. kitchen: cabinets, appliances, countertop, hood, electrical. baths: shower vanity, tiles. | $35,000 |
| Dec 13, 2021 | Expired or cancelled expired Aug 2023 | 2741 Vallejo St | rev to pa202011058298: structural upgrade to stair stringers, structural upgrade and repair (e) balcony; structural upgrade to roof joists due to sklight relocation. change bathrooms layouts.Details
rev to pa202011058298: structural upgrade to stair stringers, structural upgrade and repair (e) balcony; structural upgrade to roof joists due to sklight relocation. change bathrooms layouts. | $100,000 |
| Nov 5, 2020 | Expired or cancelled expired Jan 2026 | 2741 Vallejo St | 1. renovation of interior spaces w/no addition of sq ft, number of rooms, nor bathrooms. 2. replacement of rear windows & doors. upgrade of electrical & replace drywall. 3. structural upgrade by double of joists at living room ceiling @ bedroom #3, #4.Details
1. renovation of interior spaces w/no addition of sq ft, number of rooms, nor bathrooms. 2. replacement of rear windows & doors. upgrade of electrical & replace drywall. 3. structural upgrade by double of joists at living room ceiling @ bedroom #3, #4. | $250,000 |
| May 28, 2020 | Expired or cancelled expired Jan 2022 | 2741 Vallejo St | (6) bathroom remodel in kind: new paint & wall coverings on existing partitions, refinish existing wood floors, new tile floors in bathrooms. no change to wall/openings.Details
(6) bathroom remodel in kind: new paint & wall coverings on existing partitions, refinish existing wood floors, new tile floors in bathrooms. no change to wall/openings. | $18,000 |
| Feb 22, 2019 | Never finaled issued Mar 2019, no final | 860 Eddy St | remodel ada bathroom in room 201 & 204Details
remodel ada bathroom in room 201 & 204 | $8,000 |
| Aug 28, 2017 | Completed final sign-off Nov 2019 | 740 Hyde St | work in (3) units; update of 3 kitchens (3 stroies) and update of 3 bathrooms (3 stories) -a replace all windows front and rear. at front, wood frames; (45) total windows, same size/location, max u-factor 0.32; update electricalDetails
work in (3) units; update of 3 kitchens (3 stroies) and update of 3 bathrooms (3 stories) -a replace all windows front and rear. at front, wood frames; (45) total windows, same size/location, max u-factor 0.32; update electrical | $147,000 |
| Aug 17, 2017 | Completed final sign-off Dec 2017 | 2111 27th Av | g/f: adding a bathroom in basement, new bedroom & storage. no exterior workDetails
g/f: adding a bathroom in basement, new bedroom & storage. no exterior work | $30,000 |
| Oct 18, 2016 | Completed final sign-off Aug 2017 | 1982 Palou Av | add 3 baths, 3 rooms, remodel kitchen and existing bath. street facing windows to be wood aluminum clad. interior wall demo not to exceed 75%Details
add 3 baths, 3 rooms, remodel kitchen and existing bath. street facing windows to be wood aluminum clad. interior wall demo not to exceed 75% | $70,000 |
| May 29, 2015 | Completed final sign-off Jun 2015 | 481 Minna St | for administration purpose only per inspector request to reissue same permit with corrected room count. ref #201206182836 bathroom construction. addressing complaint #201210161 items 6 & 7 and complaint 201218141 items 4 & 5.Details
for administration purpose only per inspector request to reissue same permit with corrected room count. ref #201206182836 bathroom construction. addressing complaint #201210161 items 6 & 7 and complaint 201218141 items 4 & 5. | |
| Jan 15, 2015 | Completed final sign-off Jun 2015 | 6509 Geary Bl | #204- remodel kitchen & bath, move electrical panel out of closet.Details
#204- remodel kitchen & bath, move electrical panel out of closet. | $12,000 |
| Jun 30, 2011 | Completed final sign-off Aug 2011 | 1830 Leavenworth St | main bathroom renovation on 2nd floor. no removal of walls, no alterations of walls. 72"x55" area. lighting must comply with 150 (k).Details
main bathroom renovation on 2nd floor. no removal of walls, no alterations of walls. 72"x55" area. lighting must comply with 150 (k). | $6,000 |
| Feb 22, 2010 | Completed final sign-off Nov 2010 | 24 06th Av | remodel bathrooms (2.5). no structural work.Details
remodel bathrooms (2.5). no structural work. | $45,000 |