W E Lyons Construction Co
- Based in
- Walnut Creek
- On San Francisco permits
- Aug 2000 to Aug 2026
- Last 24 months
- 8 permits filed
60 permits since 2000: 31 completed, 7 in progress, 19 never finaled, 3 expired or cancelled.
Of the 19 never-finaled permits, 1 is 3 to 5 years old, 13 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 1 completed, 1 in progress, 1 never finaled. Typically 55 days from filing to permit and 181 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2025 | In progress issued Oct 2025 | 1 South Van Ness Av | revison to pa# 202203079381: create a temporary structural floor opening in existing deck floor. construction consists of structural support and new pan deck welded back with dowels in concrete after equipment is installedDetails
revison to pa# 202203079381: create a temporary structural floor opening in existing deck floor. construction consists of structural support and new pan deck welded back with dowels in concrete after equipment is installed | $10,000 |
| Sep 8, 2017 | Completed final sign-off Jul 2018 | 725 Fulton St | repair concrete deck > 50 % repair steel beamsDetails
repair concrete deck > 50 % repair steel beams | $300,000 |
| Jul 2, 2004 | Never finaled issued Jul 2004, no final | 900 Green St | scaffold bldg, repair damage to eifs, repair deck, roof as required, flooring.Details
scaffold bldg, repair damage to eifs, repair deck, roof as required, flooring. | $1,600,000 |