Back to kitchen remodel contractors
W C S S Dba Solid Build Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to Oct 2026
- Last 24 months
- 18 permits filed
102 permits since 2000: 83 completed, 3 in progress, 8 never finaled, 8 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 13 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 203 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 11, 2025 | In progress issued Dec 2025 | 4721 Lincoln Wy | 1st fl: remodel e powder to full bath, relocate e stair. 2nd fl: remodel kitchen, relocate laundry,new flooring, new skylight. exterior: new deck/patio at rear yard at grade, replace front windows in kind, new siding doors and windows at rearDetails
1st fl: remodel e powder to full bath, relocate e stair. 2nd fl: remodel kitchen, relocate laundry,new flooring, new skylight. exterior: new deck/patio at rear yard at grade, replace front windows in kind, new siding doors and windows at rear | $438,000 |
| Dec 2, 2025 | Completed final sign-off Jan 2026 | 3447 Fillmore St | installation of 2 layers of insulation sound isolation channels, light covers and 2 layers of 5/8" drywall in the hallway, living room, kitchen for sound mitigation between units.Details
installation of 2 layers of insulation sound isolation channels, light covers and 2 layers of 5/8" drywall in the hallway, living room, kitchen for sound mitigation between units. | $12,500 |
| May 29, 2025 | Completed final sign-off Aug 2026 | 5160 Diamond Heights Bl | enlarge kitchen by removing designated non load bearing interior partitions. convert existing swing doors to pocket doors or surface mounted sliding doors. reconfigure the bathroom layout with new plumbing fixtures and finishes. structural modifications to raise headers.Details
enlarge kitchen by removing designated non load bearing interior partitions. convert existing swing doors to pocket doors or surface mounted sliding doors. reconfigure the bathroom layout with new plumbing fixtures and finishes. structural modifications to raise headers. | $112,000 |
| Nov 21, 2023 | Completed final sign-off Aug 2024 | 2086 24th Av | revision to permit# 202309287642: remove wall, replace window like to like and remove kitchen door. no exterior work. not visible from the street.Details
revision to permit# 202309287642: remove wall, replace window like to like and remove kitchen door. no exterior work. not visible from the street. | $3,000 |
| Sep 28, 2023 | Completed final sign-off Aug 2024 | 2086 24th Av | bathroom remodeling: changing tub to shower, title walls and floors, installing recessed lighting, fan, new faucets, kitchen remodeling: installing new cabinets, install recessed ligts, new sink, replacing 3 retrofited windows and upgrade electrical wiresDetails
bathroom remodeling: changing tub to shower, title walls and floors, installing recessed lighting, fan, new faucets, kitchen remodeling: installing new cabinets, install recessed ligts, new sink, replacing 3 retrofited windows and upgrade electrical wires | $24,500 |
| Jul 13, 2023 | Completed final sign-off Jan 2024 | 2343 39th Av | remodel 2 bathrooms & kitchen, like to like. install kitchen cabinets, faucet for bathroom and kithen, skin code for walls & ceiling.Details
remodel 2 bathrooms & kitchen, like to like. install kitchen cabinets, faucet for bathroom and kithen, skin code for walls & ceiling. | $25,000 |
| Jun 7, 2023 | Completed final sign-off Dec 2023 | 1851 Noriega St | restore walls after water damage. double layer of 5/8" drywall in women's bathroom. double layer at 5/8" drywall in wall adjacent to kitchen. double layer at 5/8" drywall in wall adjacent to storage. all interior.Details
restore walls after water damage. double layer of 5/8" drywall in women's bathroom. double layer at 5/8" drywall in wall adjacent to kitchen. double layer at 5/8" drywall in wall adjacent to storage. all interior. | $7,200 |
| Dec 29, 2022 | Completed final sign-off Oct 2023 | 101 Crestmont Dr | kitchen & 2 bathrooms remodel, replace kitchen counter top, cabinets and appliances.Details
kitchen & 2 bathrooms remodel, replace kitchen counter top, cabinets and appliances. | $19,500 |
| Jan 20, 2021 | Completed final sign-off Jun 2021 | 71 Forest View Dr | upstairs restroom to be demoed in order to update original worn out and eroded plumbing and electrical kitchen to be partial demoed to replace electr and plumbing for safethy. subsquent & reparsto wall ceilings, floors, all like for like. rewire house 200ampDetails
upstairs restroom to be demoed in order to update original worn out and eroded plumbing and electrical kitchen to be partial demoed to replace electr and plumbing for safethy. subsquent & reparsto wall ceilings, floors, all like for like. rewire house 200amp | $10,000 |
| Dec 24, 2020 | Completed final sign-off Sep 2021 | 757 12th Av | remodel kitchen, pantry, 2nd floor bahtroom & window in kind. remodel 3rd floor bathroom, remove non-load bearing wall, remove existing water closet door, remove bathtub. remove sink in bedroom closet.Details
remodel kitchen, pantry, 2nd floor bahtroom & window in kind. remodel 3rd floor bathroom, remove non-load bearing wall, remove existing water closet door, remove bathtub. remove sink in bedroom closet. | $49,000 |
| Oct 9, 2020 | Never finaled filed Oct 2020, never issued | 757 12th Av | remodel kitchen, pantry, 2nd floor bahtroom & window in kind. remodel 3rd floor bathroom, remove non-load bearing wall, remove existing water closet door, remove bathtub. remove sink in bedroom closet.Details
remodel kitchen, pantry, 2nd floor bahtroom & window in kind. remodel 3rd floor bathroom, remove non-load bearing wall, remove existing water closet door, remove bathtub. remove sink in bedroom closet. | $16,000 |
| May 12, 2020 | Completed final sign-off Dec 2020 | 1001 Pine St | unit 1206. bathroom remodel - replace sink, faucet, light, outlet, tile floor. kitchen - add electrical outlets. all work in-kindDetails
unit 1206. bathroom remodel - replace sink, faucet, light, outlet, tile floor. kitchen - add electrical outlets. all work in-kind | $7,500 |
| Mar 6, 2020 | Completed final sign-off Dec 2020 | 1 Daniel Burnham Ct | (#302) bathroom: replace tub, drywall & baseboard, fan and switch. kitchen: sink replacement, install tile floor, & install 2 gfi outlets. install wood floor to living room, bedroom, & hallway. all work in kindDetails
(#302) bathroom: replace tub, drywall & baseboard, fan and switch. kitchen: sink replacement, install tile floor, & install 2 gfi outlets. install wood floor to living room, bedroom, & hallway. all work in kind | $9,750 |
| Nov 29, 2018 | Expired or cancelled withdrawn Dec 2018 | 2250 Vicente St | demo 1 office and expand bathroom. add kitchentte area, relocate office add electrical outlets and change lighting to ledDetails
demo 1 office and expand bathroom. add kitchentte area, relocate office add electrical outlets and change lighting to led | $15,000 |
| Sep 21, 2018 | Never finaled issued Sep 2018, no final | 763 05th Av | soundproof ceiling with resiliant channles and green glue/double gypsum board at 2 bedrooms, living room, kitchen, hallways. maint 1hr fire rating between units. add 7 recessed lights, change faucet in kitchen.Details
soundproof ceiling with resiliant channles and green glue/double gypsum board at 2 bedrooms, living room, kitchen, hallways. maint 1hr fire rating between units. add 7 recessed lights, change faucet in kitchen. | $12,000 |
| Dec 4, 2017 | Completed final sign-off May 2018 | 2152 Market St | remove existing drywall/lathe/plaster. install new gypsum board with resilient channel & green gloe. kitchen, bathroom & hallway ceilings. all products are 1 hour fire rated.Details
remove existing drywall/lathe/plaster. install new gypsum board with resilient channel & green gloe. kitchen, bathroom & hallway ceilings. all products are 1 hour fire rated. | $20,206 |
| Mar 19, 2015 | Completed final sign-off May 2015 | 135 07th Av | to comply with violaton notices # 201534901 - demo (e0 drywall on ceiling. install insulation, recileint channels, and two (n) layers of 5/8" gypboard type x. 1 hr fire assembly. unit on 2nd floor. total 200 s.f. includes hallways, kitchen and bedroomDetails
to comply with violaton notices # 201534901 - demo (e0 drywall on ceiling. install insulation, recileint channels, and two (n) layers of 5/8" gypboard type x. 1 hr fire assembly. unit on 2nd floor. total 200 s.f. includes hallways, kitchen and bedroom | $3,500 |