W C S S Dba Solid Build Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to Oct 2026
- Last 24 months
- 18 permits filed
102 permits since 2000: 83 completed, 3 in progress, 8 never finaled, 8 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
26 bathroom remodel permits: 23 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 201 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 11, 2025 | In progress issued Dec 2025 | 4721 Lincoln Wy | 1st fl: remodel e powder to full bath, relocate e stair. 2nd fl: remodel kitchen, relocate laundry,new flooring, new skylight. exterior: new deck/patio at rear yard at grade, replace front windows in kind, new siding doors and windows at rearDetails
1st fl: remodel e powder to full bath, relocate e stair. 2nd fl: remodel kitchen, relocate laundry,new flooring, new skylight. exterior: new deck/patio at rear yard at grade, replace front windows in kind, new siding doors and windows at rear | $438,000 |
| May 29, 2025 | Completed final sign-off Aug 2026 | 5160 Diamond Heights Bl | enlarge kitchen by removing designated non load bearing interior partitions. convert existing swing doors to pocket doors or surface mounted sliding doors. reconfigure the bathroom layout with new plumbing fixtures and finishes. structural modifications to raise headers.Details
enlarge kitchen by removing designated non load bearing interior partitions. convert existing swing doors to pocket doors or surface mounted sliding doors. reconfigure the bathroom layout with new plumbing fixtures and finishes. structural modifications to raise headers. | $112,000 |
| Oct 25, 2023 | Completed final sign-off Sep 2024 | 1834 Mason St | (1) bathroom remodel in kind - replacing (e) shower, tub, vanity, and lights. like for like. no change to floor layout. no change to wall layout. no structural work.Details
(1) bathroom remodel in kind - replacing (e) shower, tub, vanity, and lights. like for like. no change to floor layout. no change to wall layout. no structural work. | $13,500 |
| Sep 28, 2023 | Completed final sign-off Aug 2024 | 2086 24th Av | bathroom remodeling: changing tub to shower, title walls and floors, installing recessed lighting, fan, new faucets, kitchen remodeling: installing new cabinets, install recessed ligts, new sink, replacing 3 retrofited windows and upgrade electrical wiresDetails
bathroom remodeling: changing tub to shower, title walls and floors, installing recessed lighting, fan, new faucets, kitchen remodeling: installing new cabinets, install recessed ligts, new sink, replacing 3 retrofited windows and upgrade electrical wires | $24,500 |
| Jul 13, 2023 | Completed final sign-off Jan 2024 | 2343 39th Av | remodel 2 bathrooms & kitchen, like to like. install kitchen cabinets, faucet for bathroom and kithen, skin code for walls & ceiling.Details
remodel 2 bathrooms & kitchen, like to like. install kitchen cabinets, faucet for bathroom and kithen, skin code for walls & ceiling. | $25,000 |
| Jun 7, 2023 | Completed final sign-off Dec 2023 | 1851 Noriega St | restore walls after water damage. double layer of 5/8" drywall in women's bathroom. double layer at 5/8" drywall in wall adjacent to kitchen. double layer at 5/8" drywall in wall adjacent to storage. all interior.Details
restore walls after water damage. double layer of 5/8" drywall in women's bathroom. double layer at 5/8" drywall in wall adjacent to kitchen. double layer at 5/8" drywall in wall adjacent to storage. all interior. | $7,200 |
| Dec 29, 2022 | Completed final sign-off Oct 2023 | 101 Crestmont Dr | kitchen & 2 bathrooms remodel, replace kitchen counter top, cabinets and appliances.Details
kitchen & 2 bathrooms remodel, replace kitchen counter top, cabinets and appliances. | $19,500 |
| Dec 22, 2022 | Completed final sign-off May 2023 | 4721 Lincoln Wy | remodel existing bathroom. no change to wallsDetails
remodel existing bathroom. no change to walls | $11,300 |
| Aug 1, 2022 | Completed final sign-off Oct 2023 | 101 Crestmont Dr | ground floor: conversion of (e) gym and game room into a new bathroom & bedroomDetails
ground floor: conversion of (e) gym and game room into a new bathroom & bedroom | $20,000 |
| Jan 13, 2022 | Completed final sign-off Mar 2022 | 2230 Pacific Av | # 103: like for like bathroom upgrade.Details
# 103: like for like bathroom upgrade. | $9,000 |
| Aug 25, 2021 | Completed final sign-off Feb 2022 | 180 Landers St | #1. installation of insulation between the studs and joists, install resilient channel on studs, and joists install two layers of drywall, all ceiling except four guest 8 room plus bathrooms and 2 walls in living roomDetails
#1. installation of insulation between the studs and joists, install resilient channel on studs, and joists install two layers of drywall, all ceiling except four guest 8 room plus bathrooms and 2 walls in living room | $15,000 |
| Aug 16, 2021 | Completed final sign-off Nov 2021 | 845 Lake St | bathroom remodel like for like.Details
bathroom remodel like for like. | $4,000 |
| Dec 24, 2020 | Completed final sign-off Sep 2021 | 757 12th Av | remodel kitchen, pantry, 2nd floor bahtroom & window in kind. remodel 3rd floor bathroom, remove non-load bearing wall, remove existing water closet door, remove bathtub. remove sink in bedroom closet.Details
remodel kitchen, pantry, 2nd floor bahtroom & window in kind. remodel 3rd floor bathroom, remove non-load bearing wall, remove existing water closet door, remove bathtub. remove sink in bedroom closet. | $49,000 |
| Oct 9, 2020 | Never finaled filed Oct 2020, never issued | 757 12th Av | remodel kitchen, pantry, 2nd floor bahtroom & window in kind. remodel 3rd floor bathroom, remove non-load bearing wall, remove existing water closet door, remove bathtub. remove sink in bedroom closet.Details
remodel kitchen, pantry, 2nd floor bahtroom & window in kind. remodel 3rd floor bathroom, remove non-load bearing wall, remove existing water closet door, remove bathtub. remove sink in bedroom closet. | $16,000 |
| Aug 18, 2020 | Completed final sign-off Mar 2021 | 1001 Pine St | unit #1203: bathroom remodeling in kind(~6'x5') - converting tub to shower, tiling walls and floor, adding light outlet, adding receptacle.Details
unit #1203: bathroom remodeling in kind(~6'x5') - converting tub to shower, tiling walls and floor, adding light outlet, adding receptacle. | $11,500 |
| Jun 22, 2020 | Completed final sign-off Dec 2020 | 2068 Grove St | install insulation, resilient clips/ channels, and two layers of drywall on the ceilings on the first floor. remodel 1.5 bathrooms in kind. upgrade the electrical and install 30 new recessed lights. 1/2 bath is 3'6"x5'. full bath is 5'10"x6'7"Details
install insulation, resilient clips/ channels, and two layers of drywall on the ceilings on the first floor. remodel 1.5 bathrooms in kind. upgrade the electrical and install 30 new recessed lights. 1/2 bath is 3'6"x5'. full bath is 5'10"x6'7" | $20,000 |
| May 12, 2020 | Completed final sign-off Dec 2020 | 1001 Pine St | unit 1206. bathroom remodel - replace sink, faucet, light, outlet, tile floor. kitchen - add electrical outlets. all work in-kindDetails
unit 1206. bathroom remodel - replace sink, faucet, light, outlet, tile floor. kitchen - add electrical outlets. all work in-kind | $7,500 |
| Mar 6, 2020 | Completed final sign-off Dec 2020 | 1 Daniel Burnham Ct | (#302) bathroom: replace tub, drywall & baseboard, fan and switch. kitchen: sink replacement, install tile floor, & install 2 gfi outlets. install wood floor to living room, bedroom, & hallway. all work in kindDetails
(#302) bathroom: replace tub, drywall & baseboard, fan and switch. kitchen: sink replacement, install tile floor, & install 2 gfi outlets. install wood floor to living room, bedroom, & hallway. all work in kind | $9,750 |
| Nov 27, 2019 | Completed final sign-off Feb 2020 | 3869 19th St | bathroom remodel in-kind. replace tile, floor, lights, showerDetails
bathroom remodel in-kind. replace tile, floor, lights, shower | $11,250 |
| Mar 12, 2019 | Completed final sign-off Mar 2020 | 2250 Vicente St | (1) (e) commercial parking to remain & to add access to material handling equipment storage. (2) (n) ada compliance bathroom. (3) (n) ada compliance break room. no work on residential unis. only on retail space.Details
(1) (e) commercial parking to remain & to add access to material handling equipment storage. (2) (n) ada compliance bathroom. (3) (n) ada compliance break room. no work on residential unis. only on retail space. | $31,000 |
| Nov 29, 2018 | Expired or cancelled withdrawn Dec 2018 | 2250 Vicente St | demo 1 office and expand bathroom. add kitchentte area, relocate office add electrical outlets and change lighting to ledDetails
demo 1 office and expand bathroom. add kitchentte area, relocate office add electrical outlets and change lighting to led | $15,000 |
| Dec 4, 2017 | Completed final sign-off May 2018 | 2152 Market St | remove existing drywall/lathe/plaster. install new gypsum board with resilient channel & green gloe. kitchen, bathroom & hallway ceilings. all products are 1 hour fire rated.Details
remove existing drywall/lathe/plaster. install new gypsum board with resilient channel & green gloe. kitchen, bathroom & hallway ceilings. all products are 1 hour fire rated. | $20,206 |
| Nov 4, 2016 | Completed final sign-off Jan 2017 | 2470 Bush St | sound proof ceiling, add resilient channel and double gypsum board, whole unit, except bathroom, maintain 1 hr. separation between units.Details
sound proof ceiling, add resilient channel and double gypsum board, whole unit, except bathroom, maintain 1 hr. separation between units. | $25,000 |
| Oct 30, 2015 | Completed final sign-off Feb 2016 | 346 01st St | unit 203, convert an (e) closet with existing washer/dryer into a 1/2 bathroom, sprinkler permit under separate pemitDetails
unit 203, convert an (e) closet with existing washer/dryer into a 1/2 bathroom, sprinkler permit under separate pemit | $6,500 |
| May 26, 2015 | Completed final sign-off Mar 2019 | 146 Swiss Av | removing extg 1st floor bathroom plumbing fixtures and transform space to new storage area. adding a new bathroom of 1st floor with new window to sideyard. new sliding in rear facade to replace extg windows.Details
removing extg 1st floor bathroom plumbing fixtures and transform space to new storage area. adding a new bathroom of 1st floor with new window to sideyard. new sliding in rear facade to replace extg windows. | $12,000 |
| Aug 12, 2014 | Completed final sign-off Mar 2015 | 2458 Bush St | ground floor improvement to add a sound proofed living room with a new full bath. sound proofing (e) walls, new sound proof windows and door, new ceiling and new non-ducted electrical heat pump.Details
ground floor improvement to add a sound proofed living room with a new full bath. sound proofing (e) walls, new sound proof windows and door, new ceiling and new non-ducted electrical heat pump. | $23,500 |