W B Jordan Inc **See Notes**
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Jul 2026
- Last 24 months
- 6 permits filed
75 permits since 2000: 71 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 11 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2024 | Completed final sign-off Apr 2025 | 2950 26th Av | new deck at yard. remodel kitchen and 2 bathrooms. new interior sheetrock. new electric wiring. new insulation.Details
new deck at yard. remodel kitchen and 2 bathrooms. new interior sheetrock. new electric wiring. new insulation. | $520,000 |
| Aug 18, 2023 | Completed final sign-off Jan 2024 | 135 Santa Paula Av | remodel kitchen in total: new cabinets, counters. finishes ect. new lighting, sink faucets appliances and flooring as neededed.Details
remodel kitchen in total: new cabinets, counters. finishes ect. new lighting, sink faucets appliances and flooring as neededed. | $200,000 |
| Mar 12, 2018 | Completed final sign-off Oct 2018 | 145 Balceta Av | no walls moved, added or infilled. all (e) layouts to remain. remodel kitchen in total - replace all finishd - cabinets - counters etc. sheetrock etc. plumbing and electrical to be done under separate sub contractor permits.Details
no walls moved, added or infilled. all (e) layouts to remain. remodel kitchen in total - replace all finishd - cabinets - counters etc. sheetrock etc. plumbing and electrical to be done under separate sub contractor permits. | $70,000 |
| Aug 7, 2017 | Completed final sign-off Sep 2017 | 135 Santa Paula Av | repair area of water damage in half bath on main floor near kitchen, open sheetrock & repair as needed.Details
repair area of water damage in half bath on main floor near kitchen, open sheetrock & repair as needed. | $15,000 |
| Apr 29, 2016 | Completed final sign-off Aug 2016 | 315 San Benito Wy | revision to kitchen ref pa 2016 0407 4208: to remove bearing wall add beam and footings. add wall ply at kitchenDetails
revision to kitchen ref pa 2016 0407 4208: to remove bearing wall add beam and footings. add wall ply at kitchen | $10,000 |
| Apr 7, 2016 | Completed final sign-off Aug 2016 | 315 San Benito Wy | remodel kitchen in total. in-kind. replace side entry door and frame northside. replace interior door to garage. upgrade electric service (electrical permit)Details
remodel kitchen in total. in-kind. replace side entry door and frame northside. replace interior door to garage. upgrade electric service (electrical permit) | $60,000 |
| Oct 30, 2015 | Completed final sign-off Oct 2016 | 4016 Fulton St | complete remodel of kitchen, bathroom and half bath. upgrade and or add additional electrical outlets in some other roomsDetails
complete remodel of kitchen, bathroom and half bath. upgrade and or add additional electrical outlets in some other rooms | $104,000 |
| Aug 24, 2015 | Completed final sign-off Oct 2015 | 120 Stratford Dr | remove and replace back door off of kitchenDetails
remove and replace back door off of kitchen | $4,000 |
| May 12, 2014 | Completed final sign-off Sep 2014 | 725 Panorama Dr | remodel kitchen in total install new cabinets appiances counters etc. plumbing and electrical will be by separate subcontractor permit.Details
remodel kitchen in total install new cabinets appiances counters etc. plumbing and electrical will be by separate subcontractor permit. | $40,000 |
| Apr 8, 2009 | Completed final sign-off Aug 2009 | 1645 15th Av | replace kitchen cbinets + counters.Details
replace kitchen cbinets + counters. | $15,000 |
| Nov 26, 2008 | Completed final sign-off Mar 2018 | 1276 Page St | repair areas of dryrot in kitchen & bath. replace rear windows, repair areas of lath & plater with sheetrock as needed. insulate where possible. new tile kitchen & bath, minor upgrades.Details
repair areas of dryrot in kitchen & bath. replace rear windows, repair areas of lath & plater with sheetrock as needed. insulate where possible. new tile kitchen & bath, minor upgrades. | $15,000 |
| Aug 24, 2005 | Expired or cancelled expired Feb 2008 | 1274 Page St | remodel kitchen + 2 baths, refinish hardwood floors. replace 2-4 rear windows if needed. repair areaDetails
remodel kitchen + 2 baths, refinish hardwood floors. replace 2-4 rear windows if needed. repair area | $40,000 |