Back to bathroom remodel contractors
W B Jordan Inc **See Notes**
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Jul 2026
- Last 24 months
- 6 permits filed
75 permits since 2000: 71 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 21 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2024 | Completed final sign-off Apr 2025 | 2950 26th Av | new deck at yard. remodel kitchen and 2 bathrooms. new interior sheetrock. new electric wiring. new insulation.Details
new deck at yard. remodel kitchen and 2 bathrooms. new interior sheetrock. new electric wiring. new insulation. | $520,000 |
| Nov 18, 2022 | Completed final sign-off Jan 2023 | 2 Marne Av | remove and replace bathroom window on east wall. repair any potential rot if found around window and or east side. not visible from street.Details
remove and replace bathroom window on east wall. repair any potential rot if found around window and or east side. not visible from street. | $6,742 |
| Feb 10, 2021 | Completed final sign-off Feb 2022 | 27 Gennessee St | bathroom remodel in kind, electrical plumbing (subcontractors). demo existing, new fixtures, tiling, no changes in size.Details
bathroom remodel in kind, electrical plumbing (subcontractors). demo existing, new fixtures, tiling, no changes in size. | $30,000 |
| Jun 19, 2019 | Completed final sign-off Jun 2021 | 141 Warren Dr | remove replace main entrance door. remodel topfloor master bath in the total.Details
remove replace main entrance door. remodel topfloor master bath in the total. | $107,000 |
| Sep 5, 2018 | Completed final sign-off Dec 2018 | 3224 Judah St | unit #3: repair area of rot in bathroom at bathtub wall. no change on wallsDetails
unit #3: repair area of rot in bathroom at bathtub wall. no change on walls | $15,000 |
| Nov 30, 2017 | Completed final sign-off Feb 2019 | 465 Bosworth St | remodel top floor upper unit bath in total. replace a total of 4 exterior doors - door to rear yard & 3 doors to lightwell wooden exterior staircase. repair anticipated rot in top floor bath & same staircase. rot discovered during work on pa #201708306433.Details
remodel top floor upper unit bath in total. replace a total of 4 exterior doors - door to rear yard & 3 doors to lightwell wooden exterior staircase. repair anticipated rot in top floor bath & same staircase. rot discovered during work on pa #201708306433. | $65,000 |
| Aug 30, 2017 | Completed final sign-off Aug 2018 | 465 Bosworth St | remodel bath in total lower unit # 465. plumbing and electrical to be by separate contractor permit. n/a maherDetails
remodel bath in total lower unit # 465. plumbing and electrical to be by separate contractor permit. n/a maher | $45,000 |
| Aug 7, 2017 | Completed final sign-off Sep 2017 | 135 Santa Paula Av | repair area of water damage in half bath on main floor near kitchen, open sheetrock & repair as needed.Details
repair area of water damage in half bath on main floor near kitchen, open sheetrock & repair as needed. | $15,000 |
| Jun 28, 2016 | Completed final sign-off May 2017 | 1275 40th Av | add 382 sf constiting of 2 new bedrooms, laundry room & relocated bathroom at 1st floor. replace rear deck in kind, voluntary structural stregthening of 1st floor. deck less than 10' highDetails
add 382 sf constiting of 2 new bedrooms, laundry room & relocated bathroom at 1st floor. replace rear deck in kind, voluntary structural stregthening of 1st floor. deck less than 10' high | $250,000 |
| Oct 30, 2015 | Completed final sign-off Oct 2016 | 4016 Fulton St | complete remodel of kitchen, bathroom and half bath. upgrade and or add additional electrical outlets in some other roomsDetails
complete remodel of kitchen, bathroom and half bath. upgrade and or add additional electrical outlets in some other rooms | $104,000 |
| Dec 24, 2014 | Completed final sign-off Nov 2015 | 145 Balceta Av | lower level/(garage): adding bathroom, laundry room, storage space, music storage room, foundation for laundry room (underpinning) per plan.Details
lower level/(garage): adding bathroom, laundry room, storage space, music storage room, foundation for laundry room (underpinning) per plan. | $100,000 |
| Nov 4, 2013 | Completed final sign-off Sep 2014 | 75 Clipper St | remodel existing basement room & entry level bathroom, add basement toilet room to existing laundry room, change lighting, relocate furnace & hw.Details
remodel existing basement room & entry level bathroom, add basement toilet room to existing laundry room, change lighting, relocate furnace & hw. | $112,000 |
| Sep 4, 2013 | Completed final sign-off Jan 2014 | 405 Teresita Bl | remodel top floor bath in total , new tile etc. (plumbing & electrical by separate subcontractor)Details
remodel top floor bath in total , new tile etc. (plumbing & electrical by separate subcontractor) | $23,000 |
| Oct 30, 2012 | Completed final sign-off Feb 2013 | 405 Teresita Bl | add new family room, bathroom & storage to lower level (basement). add bathroom closet. add new french door and window to yard. add plywood to walls.Details
add new family room, bathroom & storage to lower level (basement). add bathroom closet. add new french door and window to yard. add plywood to walls. | $25,000 |
| Jun 6, 2012 | Completed final sign-off Jul 2012 | 742 Cabrillo St | retile 2nd floor bathroom, re-sheetrock damaged ceiling and walls on 1st floor dining & living room. dry rot repair (minor plywood in living room wall)Details
retile 2nd floor bathroom, re-sheetrock damaged ceiling and walls on 1st floor dining & living room. dry rot repair (minor plywood in living room wall) | $5,000 |
| Nov 29, 2011 | Completed final sign-off Mar 2012 | 1001 Portola Dr | add new full bathroom to lower level. enclosed garage from living space (build rated wall between garage and extg stairs). add closet to extg study at lower level. no new work at upper levels.Details
add new full bathroom to lower level. enclosed garage from living space (build rated wall between garage and extg stairs). add closet to extg study at lower level. no new work at upper levels. | $13,000 |
| Dec 10, 2010 | Completed final sign-off Apr 2011 | 80 Justin Dr | remodel upper 1 bathroom in total, new fixtures, tile, plumbing, electrical etc. in kind. remove & replace bathroom windows (side) subcontractor to obtain plumbing & electrical permit. lighting to comply with cec 150(k)Details
remodel upper 1 bathroom in total, new fixtures, tile, plumbing, electrical etc. in kind. remove & replace bathroom windows (side) subcontractor to obtain plumbing & electrical permit. lighting to comply with cec 150(k) | $9,000 |
| Apr 20, 2010 | Completed final sign-off Jul 2010 | 506 Foerster St | replace rear deck and stair which is less than 10' above grade. provide 3 ft side setback on each side of deck. minor dry rot repairs at front garage door frame, front stair range wall, and interior bathroom shower and floor on the 2nd floorDetails
replace rear deck and stair which is less than 10' above grade. provide 3 ft side setback on each side of deck. minor dry rot repairs at front garage door frame, front stair range wall, and interior bathroom shower and floor on the 2nd floor | $10,500 |
| Dec 16, 2009 | Expired or cancelled expired Jul 2011 | 1257 Bowdoin St | new full bathroom at lower/garage level. legalize (e) exercise room and family room at lower level. work to include new framing, elec, plbg work with new fixturesDetails
new full bathroom at lower/garage level. legalize (e) exercise room and family room at lower level. work to include new framing, elec, plbg work with new fixtures | $11,500 |
| Mar 11, 2009 | Completed final sign-off Jul 2009 | 30 Estero Av | remodel bathroom. install new fixtures, tile paint etc. all plumbing & electrical under separate permit. leave area clean & tidy.Details
remodel bathroom. install new fixtures, tile paint etc. all plumbing & electrical under separate permit. leave area clean & tidy. | $12,430 |
| Dec 10, 2008 | Completed final sign-off Mar 2009 | 30 Estero Av | repair/replace approx 600 sq ft of stucco & rot damage east side. install new front & garage doors and repair potential rot around both. repair area of rot in bathroom floor. repair rot in bsmt under front door. repair approx 30 feet of rotted mudsill east side.Details
repair/replace approx 600 sq ft of stucco & rot damage east side. install new front & garage doors and repair potential rot around both. repair area of rot in bathroom floor. repair rot in bsmt under front door. repair approx 30 feet of rotted mudsill east side. | $25,000 |
| Nov 26, 2008 | Completed final sign-off Mar 2018 | 1276 Page St | repair areas of dryrot in kitchen & bath. replace rear windows, repair areas of lath & plater with sheetrock as needed. insulate where possible. new tile kitchen & bath, minor upgrades.Details
repair areas of dryrot in kitchen & bath. replace rear windows, repair areas of lath & plater with sheetrock as needed. insulate where possible. new tile kitchen & bath, minor upgrades. | $15,000 |
| Aug 24, 2005 | Expired or cancelled expired Feb 2008 | 1274 Page St | remodel kitchen + 2 baths, refinish hardwood floors. replace 2-4 rear windows if needed. repair areaDetails
remodel kitchen + 2 baths, refinish hardwood floors. replace 2-4 rear windows if needed. repair area | $40,000 |