W B Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Nov 2008
- Last 24 months
- 0 permits filed
19 permits since 2000: 16 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 expired or cancelled. Typically 139 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2008 | Expired or cancelled expired Mar 2011 | 84 Broadmoor Dr | horizontal addition to enclose roof deck & roof on (e) 2nd floor. add 2 bathrooms & remodel master bath, add study room @ 2nd floor. to extend pantry area on 1st floor. (area added less than 500 sq ft.). relocation of windows at kitchen area.Details
horizontal addition to enclose roof deck & roof on (e) 2nd floor. add 2 bathrooms & remodel master bath, add study room @ 2nd floor. to extend pantry area on 1st floor. (area added less than 500 sq ft.). relocation of windows at kitchen area. | $50,000 |