Back to kitchen remodel contractors
W B Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Nov 2008
- Last 24 months
- 0 permits filed
19 permits since 2000: 16 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2008 | Completed final sign-off Jan 2009 | 455 09th Av | work @ unit#1. bathroom and kitchen remodel.Details
work @ unit#1. bathroom and kitchen remodel. | $20,000 |
| Sep 17, 2008 | Expired or cancelled expired Mar 2011 | 84 Broadmoor Dr | horizontal addition to enclose roof deck & roof on (e) 2nd floor. add 2 bathrooms & remodel master bath, add study room @ 2nd floor. to extend pantry area on 1st floor. (area added less than 500 sq ft.). relocation of windows at kitchen area.Details
horizontal addition to enclose roof deck & roof on (e) 2nd floor. add 2 bathrooms & remodel master bath, add study room @ 2nd floor. to extend pantry area on 1st floor. (area added less than 500 sq ft.). relocation of windows at kitchen area. | $50,000 |
| Jun 3, 2008 | Completed final sign-off Dec 2008 | 455 09th Av | unit#2 & #4 bathroom and kitchen remodel.Details
unit#2 & #4 bathroom and kitchen remodel. | $28,000 |
| May 19, 2008 | Completed final sign-off Dec 2008 | 455 09th Av | work on unit#3. bathroom and kitchen remodel. non structural/replacement in kind, no removal of life safety requirements.Details
work on unit#3. bathroom and kitchen remodel. non structural/replacement in kind, no removal of life safety requirements. | $15,000 |
| Jul 18, 2006 | Completed final sign-off Dec 2006 | 2577 21st Av | remodel (e) 3 story s.f.d. add 1 (n) bath, remodel (e) 3 baths, (e) kitchen, remodel 3 bedrooms replace windows. repair front stairs, convert 1 bedroom to family room.Details
remodel (e) 3 story s.f.d. add 1 (n) bath, remodel (e) 3 baths, (e) kitchen, remodel 3 bedrooms replace windows. repair front stairs, convert 1 bedroom to family room. | $40,000 |
| Mar 14, 2006 | Completed final sign-off May 2006 | 2139 Balboa St | bathroom & kitchen remodel. bathroom-replace tub,toilet,lav,1 window.window not visable from street. kitchen-replace countertop,cabinet,range,sink,appliances.Details
bathroom & kitchen remodel. bathroom-replace tub,toilet,lav,1 window.window not visable from street. kitchen-replace countertop,cabinet,range,sink,appliances. | $15,000 |