Vnh Builders
- Based in
- Burlingame
- On San Francisco permits
- Nov 2020 to Jul 2025
- Last 24 months
- 1 permit filed
16 permits since 2000: 5 completed, 11 never finaled.
Of the 11 never-finaled permits, 2 are 3 to 5 years old, 9 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 1 completed, 2 never finaled. Typically 22 days from filing to permit and 308 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2021 | Completed final sign-off Oct 2022 | 477 Vermont St | englarge lower level door opening, new interior stair and lower level cosmetic updates. new seismic shear wall and footing are provided at lower level wall.Details
englarge lower level door opening, new interior stair and lower level cosmetic updates. new seismic shear wall and footing are provided at lower level wall. | $35,000 |
| Jun 15, 2021 | Never finaled issued Jul 2021, no final | 826 Central Av | common area - improvement to (e) stairs from street to basement including: install handrails @ both side of stairs; remove door @ bottom step; upgrade landing @ bottom of stair; install 2 (n) doors, 1 @ each side of landingDetails
common area - improvement to (e) stairs from street to basement including: install handrails @ both side of stairs; remove door @ bottom step; upgrade landing @ bottom of stair; install 2 (n) doors, 1 @ each side of landing | $2,500 |
| Jun 15, 2021 | Never finaled issued Jul 2021, no final | 822 Central Av | improvements to existing stairs from street to basement including: install handrails @ both side of the stairs; remove door at bottom step; upgrade landing @ bottom of stair; install 2 (n) doors, 1 at each side of the landingDetails
improvements to existing stairs from street to basement including: install handrails @ both side of the stairs; remove door at bottom step; upgrade landing @ bottom of stair; install 2 (n) doors, 1 at each side of the landing | $2,500 |