Back to bathroom remodel contractors
Vnh Builders
- Based in
- Burlingame
- On San Francisco permits
- Nov 2020 to Jul 2025
- Last 24 months
- 1 permit filed
16 permits since 2000: 5 completed, 11 never finaled.
Of the 11 never-finaled permits, 2 are 3 to 5 years old, 9 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 never finaled. Typically 0 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2022 | Completed final sign-off Oct 2022 | 2774 21st St | (work in unit 2774 only) kitchen remodeling: replace cabinets, countertop, facuet, and point light. 2 bathroom remodels: new tiles, fan, light fixture, shower pan. replace fan and patch and paint.Details
(work in unit 2774 only) kitchen remodeling: replace cabinets, countertop, facuet, and point light. 2 bathroom remodels: new tiles, fan, light fixture, shower pan. replace fan and patch and paint. | $65,000 |
| Oct 25, 2021 | Completed final sign-off Jan 2022 | 1 Daniel Burnham Ct | bathroom remodeling. 64 sqft. replace bathtub, replace toilet in kind, install new tiles in the shower and floor.Details
bathroom remodeling. 64 sqft. replace bathtub, replace toilet in kind, install new tiles in the shower and floor. | $8,000 |
| Jun 16, 2021 | Never finaled issued Aug 2021, no final | 439 Princeton St | frame non structural new walls, new shower area in the bath of the 1st floor, new laundry area and open kithcen wall non loan bearing walls.Details
frame non structural new walls, new shower area in the bath of the 1st floor, new laundry area and open kithcen wall non loan bearing walls. | $65,000 |
| Apr 21, 2021 | Never finaled issued Apr 2021, no final | 1 Daniel Burnham Ct | replace kitchen cabinets, replace bathroom tile floor, add shower door, add back light livng room and bedroom. no structural workDetails
replace kitchen cabinets, replace bathroom tile floor, add shower door, add back light livng room and bedroom. no structural work | $10,000 |