Back to kitchen remodel contractors
Vitale Construction
- Based in
- So. Sf
- On San Francisco permits
- May 2017 to May 2019
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 6 days from filing to permit and 396 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 26, 2018 | Completed final sign-off Sep 2019 | 1040 Francisco St | residential remodel to include kitchen renovation. interior finishes, window replacement and legalization of e gr fl family rm. structural work inlcludes (n) beam in main floor, removal of post and new beam gr fl and voluntary seismic retrofit. windows to be aluminum clad woodDetails
residential remodel to include kitchen renovation. interior finishes, window replacement and legalization of e gr fl family rm. structural work inlcludes (n) beam in main floor, removal of post and new beam gr fl and voluntary seismic retrofit. windows to be aluminum clad wood | $185,000 |
| Aug 30, 2017 | Completed final sign-off Mar 2018 | 28 Hillway Av | minor exploratory demolition at rear wall in order to evaluate the structural elements in preparation for work on pa#201706300862. also nstall proper protection at areas of house that are ot affected by work on future permt. small areas to be opened in bathroom, kitchen and dining room.Details
minor exploratory demolition at rear wall in order to evaluate the structural elements in preparation for work on pa#201706300862. also nstall proper protection at areas of house that are ot affected by work on future permt. small areas to be opened in bathroom, kitchen and dining room. | $150 |