Vitale Construction
- Based in
- So. Sf
- On San Francisco permits
- May 2017 to May 2019
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 9, 2019 | Expired or cancelled cancelled Jan 2026 | 1040 Francisco St | partial removal of e front wall to replace with decorative fenceDetails
partial removal of e front wall to replace with decorative fence | $9,000 |
| Oct 4, 2018 | Completed final sign-off Sep 2019 | 1040 Francisco St | revision to pa 2018-0514-8971 to include rear window replacement, new electrical and reduced structural scopeDetails
revision to pa 2018-0514-8971 to include rear window replacement, new electrical and reduced structural scope | |
| May 14, 2018 | Completed final sign-off Sep 2019 | 1040 Francisco St | facade remodel to include bow window demo, new windows, new metal balconies and changes in finishes. no envolope increased, master bathroom remodel to include sink addition and new finishes.Details
facade remodel to include bow window demo, new windows, new metal balconies and changes in finishes. no envolope increased, master bathroom remodel to include sink addition and new finishes. | $130,000 |
| Apr 24, 2018 | Completed final sign-off Sep 2019 | 1040 Francisco St | revision to 201801269621 replace 3rd flr courtyard window; replace siding & repair dry rot at courtyard, add powder room and wet bar at ground floor. no exterior work visible from street.Details
revision to 201801269621 replace 3rd flr courtyard window; replace siding & repair dry rot at courtyard, add powder room and wet bar at ground floor. no exterior work visible from street. | $20,000 |
| Jan 26, 2018 | Completed final sign-off Sep 2019 | 1040 Francisco St | residential remodel to include kitchen renovation. interior finishes, window replacement and legalization of e gr fl family rm. structural work inlcludes (n) beam in main floor, removal of post and new beam gr fl and voluntary seismic retrofit. windows to be aluminum clad woodDetails
residential remodel to include kitchen renovation. interior finishes, window replacement and legalization of e gr fl family rm. structural work inlcludes (n) beam in main floor, removal of post and new beam gr fl and voluntary seismic retrofit. windows to be aluminum clad wood | $185,000 |
| Oct 30, 2017 | Completed final sign-off Mar 2018 | 28 Hillway Av | replae windown in master bed, not visible from street. same size, same location. max u-factor 0.32. replace siding in kind at portion of rear wallDetails
replae windown in master bed, not visible from street. same size, same location. max u-factor 0.32. replace siding in kind at portion of rear wall | $3,000 |
| Aug 30, 2017 | Completed final sign-off Mar 2018 | 28 Hillway Av | minor exploratory demolition at rear wall in order to evaluate the structural elements in preparation for work on pa#201706300862. also nstall proper protection at areas of house that are ot affected by work on future permt. small areas to be opened in bathroom, kitchen and dining room.Details
minor exploratory demolition at rear wall in order to evaluate the structural elements in preparation for work on pa#201706300862. also nstall proper protection at areas of house that are ot affected by work on future permt. small areas to be opened in bathroom, kitchen and dining room. | $150 |
| Jun 30, 2017 | Completed final sign-off May 2021 | 28 Hillway Av | revision to 201507151596. reduce proposed addition. new deck. alter site permit for 2015-07-15-1596.Details
revision to 201507151596. reduce proposed addition. new deck. alter site permit for 2015-07-15-1596. | |
| May 24, 2017 | Completed final sign-off Aug 2017 | 3004 18th St | replace (e) front exterior stairs maher naDetails
replace (e) front exterior stairs maher na | $5,000 |