Back to kitchen remodel contractors
Vidal Alfredo Construction
- Based in
- San Leandro
- On San Francisco permits
- Nov 2020 to Oct 2024
- Last 24 months
- 1 permit filed
24 permits since 2000: 18 completed, 2 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2024 | Completed final sign-off Oct 2024 | 900 Douglass St | remodel (e) kitchen like for like no relocation. remodel (e) bathroom like for like no relocation. install new subpanel.Details
remodel (e) kitchen like for like no relocation. remodel (e) bathroom like for like no relocation. install new subpanel. | $25,000 |
| Jun 24, 2024 | Completed final sign-off May 2025 | 193 Corbett Av | remodel kitchen, bathroom, laundry room, like for like no relocation. upgrade main panel to 200 amps, run new electrical from kitchen, bathroom. install new floor upper level/ or refinishDetails
remodel kitchen, bathroom, laundry room, like for like no relocation. upgrade main panel to 200 amps, run new electrical from kitchen, bathroom. install new floor upper level/ or refinish | $30,000 |
| Mar 20, 2024 | Completed final sign-off Aug 2025 | 33 Idora Av | 1st floor: remove internal stair. 2nd floor: 1)infill recessed entry to create new enty with internal stair. 2) remodel kitchen and bathroom. 3)convert a baby room into an office. 4)raise ceilin by removing ceiling joist.Details
1st floor: remove internal stair. 2nd floor: 1)infill recessed entry to create new enty with internal stair. 2) remodel kitchen and bathroom. 3)convert a baby room into an office. 4)raise ceilin by removing ceiling joist. | $50,000 |
| Sep 14, 2023 | Completed final sign-off Dec 2024 | 261 Texas St | kitchen remodel like for like no layout changes upgrade plumbing up to code update electrical up to codeDetails
kitchen remodel like for like no layout changes upgrade plumbing up to code update electrical up to code | $25,000 |
| Jul 5, 2023 | Never finaled issued Jul 2023, no final | 862 27th Av | kitchen remodel like for like no layout changes. no moving walls. replace cabinets, countertops, applicances. electrical & plumbing work.Details
kitchen remodel like for like no layout changes. no moving walls. replace cabinets, countertops, applicances. electrical & plumbing work. | $45,000 |
| Jun 13, 2023 | Completed final sign-off Dec 2023 | 1591 Jackson St | unit 4: kitchen and bathroom remodel like for like. no relocations. no changes in wall layout.Details
unit 4: kitchen and bathroom remodel like for like. no relocations. no changes in wall layout. | $60,000 |
| Feb 27, 2023 | Completed final sign-off May 2023 | 256 Cotter St | remodel kitchen like for like in kind.Details
remodel kitchen like for like in kind. | $30,000 |
| Mar 1, 2022 | Completed final sign-off Oct 2022 | 52 Alma St | kitchen remodel in kind bathroom remodel in kind. replace cabinets, countertop, no walls or layout change. replace tiles, sink, toilet & tub.Details
kitchen remodel in kind bathroom remodel in kind. replace cabinets, countertop, no walls or layout change. replace tiles, sink, toilet & tub. | $25,000 |