Back to bathroom remodel contractors
Vidal Alfredo Construction
- Based in
- San Leandro
- On San Francisco permits
- Nov 2020 to Oct 2024
- Last 24 months
- 1 permit filed
24 permits since 2000: 18 completed, 2 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 in progress. Typically 0 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2024 | In progress issued Oct 2024 | 67 Burlwood Dr | bathroom remodel like for like. no moving walls. all fixtures to remain in the same location. appprox 40 sq ftDetails
bathroom remodel like for like. no moving walls. all fixtures to remain in the same location. appprox 40 sq ft | $15,000 |
| Aug 2, 2024 | Completed final sign-off Oct 2024 | 900 Douglass St | remodel (e) kitchen like for like no relocation. remodel (e) bathroom like for like no relocation. install new subpanel.Details
remodel (e) kitchen like for like no relocation. remodel (e) bathroom like for like no relocation. install new subpanel. | $25,000 |
| Jun 24, 2024 | Completed final sign-off May 2025 | 193 Corbett Av | remodel kitchen, bathroom, laundry room, like for like no relocation. upgrade main panel to 200 amps, run new electrical from kitchen, bathroom. install new floor upper level/ or refinishDetails
remodel kitchen, bathroom, laundry room, like for like no relocation. upgrade main panel to 200 amps, run new electrical from kitchen, bathroom. install new floor upper level/ or refinish | $30,000 |
| Apr 22, 2024 | Completed final sign-off Jul 2024 | 3015 Ulloa St | remodel bathroom like for like, upgrade electrical and plumbing, remove tub and install shower.Details
remodel bathroom like for like, upgrade electrical and plumbing, remove tub and install shower. | $10,000 |
| Mar 20, 2024 | Completed final sign-off Aug 2025 | 33 Idora Av | 1st floor: remove internal stair. 2nd floor: 1)infill recessed entry to create new enty with internal stair. 2) remodel kitchen and bathroom. 3)convert a baby room into an office. 4)raise ceilin by removing ceiling joist.Details
1st floor: remove internal stair. 2nd floor: 1)infill recessed entry to create new enty with internal stair. 2) remodel kitchen and bathroom. 3)convert a baby room into an office. 4)raise ceilin by removing ceiling joist. | $50,000 |
| Jun 13, 2023 | Completed final sign-off Dec 2023 | 1591 Jackson St | unit 4: kitchen and bathroom remodel like for like. no relocations. no changes in wall layout.Details
unit 4: kitchen and bathroom remodel like for like. no relocations. no changes in wall layout. | $60,000 |
| Mar 1, 2022 | Completed final sign-off Oct 2022 | 52 Alma St | kitchen remodel in kind bathroom remodel in kind. replace cabinets, countertop, no walls or layout change. replace tiles, sink, toilet & tub.Details
kitchen remodel in kind bathroom remodel in kind. replace cabinets, countertop, no walls or layout change. replace tiles, sink, toilet & tub. | $25,000 |