Back to kitchen remodel contractors
Victor Bringas Construction
- Based in
- Mountain View
- On San Francisco permits
- Oct 2012 to Oct 2020
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 2 days from filing to permit and 107 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2020 | Completed final sign-off Mar 2021 | 2242 44th Av | revision to pa 202010035860. add plans to show the removal of non-bearing wall at kitchen area (per plan)Details
revision to pa 202010035860. add plans to show the removal of non-bearing wall at kitchen area (per plan) | $1,500 |
| Oct 3, 2020 | Completed final sign-off Mar 2021 | 2242 44th Av | kitchen remodel, in-kind. replace (e) cabs & sink, move stove & refrigerator. sink at same area w/ (e) plumb. gas line will be extended to opposite wall w/ shut-off in cab. electrical upgrades along w/ lighting. no walls altered, no walls moved.Details
kitchen remodel, in-kind. replace (e) cabs & sink, move stove & refrigerator. sink at same area w/ (e) plumb. gas line will be extended to opposite wall w/ shut-off in cab. electrical upgrades along w/ lighting. no walls altered, no walls moved. | $26,000 |
| Dec 13, 2017 | Completed final sign-off Mar 2018 | 750 Vicente St | kitchen remodel - replace (e) cabinets, appliances (same location) upgrade electrical, re install sin, range and fridge. (no change of (e) layout) dishwasher.Details
kitchen remodel - replace (e) cabinets, appliances (same location) upgrade electrical, re install sin, range and fridge. (no change of (e) layout) dishwasher. | $14,000 |
| Jun 16, 2016 | Completed final sign-off Sep 2016 | 175 Clipper St | kitchen remodel: replace (e) cabinets, countertops and upgrade electrical at kitchen plugs, gfci.Details
kitchen remodel: replace (e) cabinets, countertops and upgrade electrical at kitchen plugs, gfci. | $7,500 |
| Jan 10, 2013 | Completed final sign-off May 2013 | 1609 Sanchez St | revision to permit app# 201210121919 to legalize bedroom and bathroom at garage level. also relocate kitchen, remodel bath, add new bath, add home office, and relocate stair to basement.Details
revision to permit app# 201210121919 to legalize bedroom and bathroom at garage level. also relocate kitchen, remodel bath, add new bath, add home office, and relocate stair to basement. | $30,000 |