Back to bathroom remodel contractors
Victor Bringas Construction
- Based in
- Mountain View
- On San Francisco permits
- Oct 2012 to Oct 2020
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 6 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 10, 2014 | Completed final sign-off Jul 2014 | 403 Main St | unit 518 - guest and master bath. remodel, elec upgrade and plumbing work upgrade. shwer valves only change. toilet and sinks changed, cabinets installation, tile to be changed; to comply with cec150(k) 10Details
unit 518 - guest and master bath. remodel, elec upgrade and plumbing work upgrade. shwer valves only change. toilet and sinks changed, cabinets installation, tile to be changed; to comply with cec150(k) 10 | $15,000 |
| Jun 3, 2013 | Completed final sign-off Jul 2013 | 321 Caselli Av | bathroom remodeling,reinstall tub and sink, no walls or structure to be touched, permanently installed lights in bathroom to comply with cec 150k 10Details
bathroom remodeling,reinstall tub and sink, no walls or structure to be touched, permanently installed lights in bathroom to comply with cec 150k 10 | $6,000 |
| Jan 10, 2013 | Completed final sign-off May 2013 | 1609 Sanchez St | revision to permit app# 201210121919 to legalize bedroom and bathroom at garage level. also relocate kitchen, remodel bath, add new bath, add home office, and relocate stair to basement.Details
revision to permit app# 201210121919 to legalize bedroom and bathroom at garage level. also relocate kitchen, remodel bath, add new bath, add home office, and relocate stair to basement. | $30,000 |
| Oct 12, 2012 | Never finaled issued Nov 2012, no final | 1609 Sanchez St | legalize existing bedroom and bath at ground levelDetails
legalize existing bedroom and bath at ground level | $10,000 |