Back to kitchen remodel contractors
Vhea General Contractor
- Based in
- San Francisco
- On San Francisco permits
- Jan 2022 to Aug 2026
- Last 24 months
- 11 permits filed
17 permits since 2000: 12 completed, 3 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 2 in progress. Typically 0 days from filing to permit and 54 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 29, 2025 | In progress issued Dec 2025 | 1869 Turk St | bathroom remodel, bathtub and fixtures change. kitchen change cabinets and countertops and change only the switches and outlets.Details
bathroom remodel, bathtub and fixtures change. kitchen change cabinets and countertops and change only the switches and outlets. | $24,000 |
| Nov 12, 2025 | In progress issued Nov 2025 | 1914 Golden Gate Av | interior work: 2nd fl- construct two separate entries with a dividing wall. 3rd fl- convert (e) kitchen into new bathroom and nook. install new laundry in (e) closet. no work at 1st fl. no exterior changes.Details
interior work: 2nd fl- construct two separate entries with a dividing wall. 3rd fl- convert (e) kitchen into new bathroom and nook. install new laundry in (e) closet. no work at 1st fl. no exterior changes. | $30,000 |
| Sep 27, 2024 | Completed final sign-off Nov 2024 | 455 Vallejo St | unit #105: remove countertops and install new countertops. remove the tile flooring and install new flooring. bathroom remove the tile flooring and install new flooring. remove the wall tile and install new tile and new fixtures. replace kitchen sink and faucet.Details
unit #105: remove countertops and install new countertops. remove the tile flooring and install new flooring. bathroom remove the tile flooring and install new flooring. remove the wall tile and install new tile and new fixtures. replace kitchen sink and faucet. | $12,000 |
| Nov 27, 2023 | Completed final sign-off Jan 2024 | 4921 California St | apt 1; replace kitchen cabinets and install new seramic tile on the floor onlyDetails
apt 1; replace kitchen cabinets and install new seramic tile on the floor only | $8,000 |
| Jan 24, 2022 | Completed final sign-off Apr 2022 | 938 Plymouth Av | remodel kitchen and bathroom in kind. new electrical service and update electrical.Details
remodel kitchen and bathroom in kind. new electrical service and update electrical. | $65,000 |