Vhea General Contractor
- Based in
- San Francisco
- On San Francisco permits
- Jan 2022 to Aug 2026
- Last 24 months
- 11 permits filed
17 permits since 2000: 12 completed, 3 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 in progress. Typically 1 days from filing to permit and 79 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 29, 2025 | In progress issued Dec 2025 | 1869 Turk St | bathroom remodel, bathtub and fixtures change. kitchen change cabinets and countertops and change only the switches and outlets.Details
bathroom remodel, bathtub and fixtures change. kitchen change cabinets and countertops and change only the switches and outlets. | $24,000 |
| Nov 12, 2025 | In progress issued Nov 2025 | 1914 Golden Gate Av | interior work: 2nd fl- construct two separate entries with a dividing wall. 3rd fl- convert (e) kitchen into new bathroom and nook. install new laundry in (e) closet. no work at 1st fl. no exterior changes.Details
interior work: 2nd fl- construct two separate entries with a dividing wall. 3rd fl- convert (e) kitchen into new bathroom and nook. install new laundry in (e) closet. no work at 1st fl. no exterior changes. | $30,000 |
| Aug 20, 2025 | Completed final sign-off Apr 2026 | 652 Miramar Av | remodel 2 bathrooms and panel upgrade to 220 amps.Details
remodel 2 bathrooms and panel upgrade to 220 amps. | $58,000 |
| Aug 18, 2025 | Completed final sign-off Nov 2025 | 50 Yerba Buena Av | bathroom remodel in kind. no change to floor layout. no change to wall layout. no structural work.Details
bathroom remodel in kind. no change to floor layout. no change to wall layout. no structural work. | $18,000 |
| Oct 17, 2024 | Completed final sign-off Dec 2024 | 51 Yerba Buena Av | remodel 1 (e) bathroom.Details
remodel 1 (e) bathroom. | $9,000 |
| Sep 27, 2024 | Completed final sign-off Nov 2024 | 455 Vallejo St | unit #105: remove countertops and install new countertops. remove the tile flooring and install new flooring. bathroom remove the tile flooring and install new flooring. remove the wall tile and install new tile and new fixtures. replace kitchen sink and faucet.Details
unit #105: remove countertops and install new countertops. remove the tile flooring and install new flooring. bathroom remove the tile flooring and install new flooring. remove the wall tile and install new tile and new fixtures. replace kitchen sink and faucet. | $12,000 |
| Jan 24, 2022 | Completed final sign-off Apr 2022 | 938 Plymouth Av | remodel kitchen and bathroom in kind. new electrical service and update electrical.Details
remodel kitchen and bathroom in kind. new electrical service and update electrical. | $65,000 |