Back to kitchen remodel contractors
Velic Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2012 to Apr 2018
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 105 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2018 | Completed final sign-off May 2018 | 1551 26th Av | remodel kitchen in-kind, no structural work.Details
remodel kitchen in-kind, no structural work. | $40,000 |
| Jan 24, 2017 | Completed final sign-off Oct 2017 | 140 Greenwood Av | renovation of a s.f.d. remodel of 1st floor kitchen, circulation, and entry hall area. remodel of extg bathroom. replace extg inerior stair, replace extg front porch in kind and new step lighting to be added.Details
renovation of a s.f.d. remodel of 1st floor kitchen, circulation, and entry hall area. remodel of extg bathroom. replace extg inerior stair, replace extg front porch in kind and new step lighting to be added. | $73,475 |
| Oct 18, 2016 | Completed final sign-off Mar 2017 | 55 Caselli Av | remodeling kitchen and bathroom, in kind.Details
remodeling kitchen and bathroom, in kind. | $45,000 |
| Sep 29, 2016 | Completed final sign-off Dec 2016 | 4316 26th St | kitchen remodel in kindDetails
kitchen remodel in kind | $35,000 |
| Aug 25, 2016 | Completed final sign-off Oct 2016 | 1900 Sutter St | work in unit #7: kitchen remodeling in-kindDetails
work in unit #7: kitchen remodeling in-kind | $23,000 |
| May 8, 2015 | Completed final sign-off Oct 2015 | 141 27th Av | interior remodel of kitchen (cabinetry, appliances, plumbing, electrical, appliances, finishes); relocate & replace existing awning window at side yard; maher n/aDetails
interior remodel of kitchen (cabinetry, appliances, plumbing, electrical, appliances, finishes); relocate & replace existing awning window at side yard; maher n/a | $25,000 |
| Sep 19, 2012 | Completed final sign-off Jan 2013 | 1900 Sutter St | remodel (1) kitchen and bathrooms (1/2 bath), no change on walls, no sprinklers in unit. (e) bath exhaust fan to remain at lower level, at upperlvel replace with new exhaust fan. (n) fluorescent lights in the kitchen, (n) lighting in bathroom with occupancy sensors.Details
remodel (1) kitchen and bathrooms (1/2 bath), no change on walls, no sprinklers in unit. (e) bath exhaust fan to remain at lower level, at upperlvel replace with new exhaust fan. (n) fluorescent lights in the kitchen, (n) lighting in bathroom with occupancy sensors. | $41,250 |