Back to bathroom remodel contractors
Velic Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2012 to Apr 2018
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 9 completed. Typically 0 days from filing to permit and 136 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 20, 2018 | Completed final sign-off Jun 2018 | 4052 25th St | remodel bathroom in basement. install sliding wall system. remove tub & install stand in shower.Details
remodel bathroom in basement. install sliding wall system. remove tub & install stand in shower. | $40,000 |
| Mar 20, 2018 | Completed final sign-off May 2018 | 1551 26th Av | the ground level will be renovated to create master suite, the existing bathroom will be removed and a seperate passage way from garage and backyard will be created as well as master bedroom, bathroom & walk in closet, replace window in master bedroom & bathroom at rear side of house, ground levelDetails
the ground level will be renovated to create master suite, the existing bathroom will be removed and a seperate passage way from garage and backyard will be created as well as master bedroom, bathroom & walk in closet, replace window in master bedroom & bathroom at rear side of house, ground level | $25,000 |
| Oct 30, 2017 | Completed final sign-off Apr 2018 | 4235 25th St | remodel of the bathroom. new plumbing, new electric, tile bathroom, drywall, all high-efficicacy lights and controlle by vacancy sensor, provide ehaust fan & termirnate 3' from pl at openings, no alteration at wall, window and door.Details
remodel of the bathroom. new plumbing, new electric, tile bathroom, drywall, all high-efficicacy lights and controlle by vacancy sensor, provide ehaust fan & termirnate 3' from pl at openings, no alteration at wall, window and door. | $25,000 |
| Jan 24, 2017 | Completed final sign-off Oct 2017 | 140 Greenwood Av | renovation of a s.f.d. remodel of 1st floor kitchen, circulation, and entry hall area. remodel of extg bathroom. replace extg inerior stair, replace extg front porch in kind and new step lighting to be added.Details
renovation of a s.f.d. remodel of 1st floor kitchen, circulation, and entry hall area. remodel of extg bathroom. replace extg inerior stair, replace extg front porch in kind and new step lighting to be added. | $73,475 |
| Oct 18, 2016 | Completed final sign-off Mar 2017 | 55 Caselli Av | remodeling kitchen and bathroom, in kind.Details
remodeling kitchen and bathroom, in kind. | $45,000 |
| Jun 15, 2015 | Completed final sign-off Nov 2017 | 438 Holloway Av | horizontal addition of 156 sq/ft and remodeling (e) part of house to make master bedroom with bathroom & walk in closet.Details
horizontal addition of 156 sq/ft and remodeling (e) part of house to make master bedroom with bathroom & walk in closet. | $18,000 |
| Dec 3, 2014 | Completed final sign-off Apr 2015 | 204 Roosevelt Wy | remodeling 3 bathrooms, replacing exhaust fans and lightings, replace faucets, tubs & building new 2 showers on existing ones - replacing french door (0.40max u-factor) and two skylights (0.55max u-factor). replacing furnace with high efficiency one. replace all fixtures and skylights in-like kind.Details
remodeling 3 bathrooms, replacing exhaust fans and lightings, replace faucets, tubs & building new 2 showers on existing ones - replacing french door (0.40max u-factor) and two skylights (0.55max u-factor). replacing furnace with high efficiency one. replace all fixtures and skylights in-like kind. | $60,000 |
| Jun 6, 2014 | Completed final sign-off Aug 2014 | 3843 22nd St | remodel extg bathroom: new shower, new vanity, new toilet, new lighting and control per cec 150(k) new exhaust fan.Details
remodel extg bathroom: new shower, new vanity, new toilet, new lighting and control per cec 150(k) new exhaust fan. | $10,000 |
| Sep 19, 2012 | Completed final sign-off Jan 2013 | 1900 Sutter St | remodel (1) kitchen and bathrooms (1/2 bath), no change on walls, no sprinklers in unit. (e) bath exhaust fan to remain at lower level, at upperlvel replace with new exhaust fan. (n) fluorescent lights in the kitchen, (n) lighting in bathroom with occupancy sensors.Details
remodel (1) kitchen and bathrooms (1/2 bath), no change on walls, no sprinklers in unit. (e) bath exhaust fan to remain at lower level, at upperlvel replace with new exhaust fan. (n) fluorescent lights in the kitchen, (n) lighting in bathroom with occupancy sensors. | $41,250 |