Velero Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2017 to Jun 2026
- Last 24 months
- 3 permits filed
20 permits since 2000: 15 completed, 3 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 in progress. Typically 68 days from filing to permit and 246 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2025 | In progress issued Apr 2026 | 442 44th Av | expansion of condtioned living space to the 1st floor to include new bedrooms, bath, & family room; infill below existing 2nd floor bedroom. new interior stair connection & the renovation & reconfiguration of the existing bath, removing existing wall between kitchen & dining room & installDetails
expansion of condtioned living space to the 1st floor to include new bedrooms, bath, & family room; infill below existing 2nd floor bedroom. new interior stair connection & the renovation & reconfiguration of the existing bath, removing existing wall between kitchen & dining room & install | $250,000 |
| Nov 10, 2022 | Completed final sign-off Jul 2023 | 661 Broadway | cutting rusted areas of 2 metal stairways and welding on some new sections. repairs in-kind.Details
cutting rusted areas of 2 metal stairways and welding on some new sections. repairs in-kind. | $3,000 |