Back to kitchen remodel contractors
Velero Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2017 to Jun 2026
- Last 24 months
- 3 permits filed
20 permits since 2000: 15 completed, 3 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 3 completed, 2 in progress, 1 never finaled. Typically 38 days from filing to permit and 52 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2025 | In progress issued Apr 2026 | 442 44th Av | expansion of condtioned living space to the 1st floor to include new bedrooms, bath, & family room; infill below existing 2nd floor bedroom. new interior stair connection & the renovation & reconfiguration of the existing bath, removing existing wall between kitchen & dining room & installDetails
expansion of condtioned living space to the 1st floor to include new bedrooms, bath, & family room; infill below existing 2nd floor bedroom. new interior stair connection & the renovation & reconfiguration of the existing bath, removing existing wall between kitchen & dining room & install | $250,000 |
| Nov 12, 2024 | In progress issued Nov 2024 | 3899 Jackson St | modifying the kitchen island. replacing 2 cabinets and installing sink. new kitchen counters, new kitchen sink. new lights in kitchen. master bath: change shower/tub to shower. move toilet to the other side. change position of vanity. change lightsDetails
modifying the kitchen island. replacing 2 cabinets and installing sink. new kitchen counters, new kitchen sink. new lights in kitchen. master bath: change shower/tub to shower. move toilet to the other side. change position of vanity. change lights | $50,000 |
| Jan 9, 2023 | Completed final sign-off Mar 2023 | 701 Minnesota St | unit 119: add 9'10" glass with 4'11" opening on mezzenine with drywall & door. add outdoor outlet on patio. replace light fixtures, toilet, and fix kitchen sink water pressure. non structural work and hoa approved.Details
unit 119: add 9'10" glass with 4'11" opening on mezzenine with drywall & door. add outdoor outlet on patio. replace light fixtures, toilet, and fix kitchen sink water pressure. non structural work and hoa approved. | $15,000 |
| Feb 25, 2021 | Completed final sign-off May 2021 | 82 Parnassus Av | revision to pa# 201911137164. to remove a revised length of the load bearing wall between kitchen and dining room at the subject unit.Details
revision to pa# 201911137164. to remove a revised length of the load bearing wall between kitchen and dining room at the subject unit. | |
| Nov 13, 2019 | Completed final sign-off May 2021 | 82 Parnassus Av | remove the load-bearing wall between kitchen and dining room at the subject unitDetails
remove the load-bearing wall between kitchen and dining room at the subject unit | $20,000 |
| Feb 1, 2018 | Never finaled issued Feb 2018, no final | 925 Corbett Av | kitchen remodel new counters and cabinets, sink facuet plum to remain in same place. move ele panel. upgrade to 8 circuits (7 in kitchen). renovate (2) bathrooms. tile and vanity shower pan premade. remove kitchen wall, paint unit & upgrade closets. recess lighting in kitchen, hallwya and living rmDetails
kitchen remodel new counters and cabinets, sink facuet plum to remain in same place. move ele panel. upgrade to 8 circuits (7 in kitchen). renovate (2) bathrooms. tile and vanity shower pan premade. remove kitchen wall, paint unit & upgrade closets. recess lighting in kitchen, hallwya and living rm | $85,000 |