Back to kitchen remodel contractors
Velasquez Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Aug 2024
- Last 24 months
- 0 permits filed
16 permits since 2000: 15 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 5 days from filing to permit and 340 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2021 | Completed final sign-off Jul 2024 | 592 Wildwood Wy | revision to permit #2021/0510/0052 (no plans). first floor: remodel(e)bathroom, remove(e) front door. second floor: remodel (e) bathroom & kitchen.Details
revision to permit #2021/0510/0052 (no plans). first floor: remodel(e)bathroom, remove(e) front door. second floor: remodel (e) bathroom & kitchen. | $20,000 |
| May 10, 2021 | Completed final sign-off Dec 2021 | 592 Wildwood Wy | remodeling 2 bathroms, 1 kitchen. update electrical service 100 amp to 200 amps. plumbing update 3/4" to 1" to existing bathroom and kitchen. replace (5) windows not visible from street.Details
remodeling 2 bathroms, 1 kitchen. update electrical service 100 amp to 200 amps. plumbing update 3/4" to 1" to existing bathroom and kitchen. replace (5) windows not visible from street. | $70,000 |
| Sep 17, 2020 | Completed final sign-off Oct 2020 | 5 Surrey St | revision to building permit #2019.0507.9912 for final inspection: show as-built skylights at kitchen & sun room.Details
revision to building permit #2019.0507.9912 for final inspection: show as-built skylights at kitchen & sun room. | |
| May 7, 2019 | Completed final sign-off Oct 2020 | 5 Surrey St | no exterior work visible from street. changes rear sunroom roof slope. kitchen & bathroom remodel. new windows & skylights at sunroomDetails
no exterior work visible from street. changes rear sunroom roof slope. kitchen & bathroom remodel. new windows & skylights at sunroom | $100,000 |
| Jan 14, 2019 | Completed final sign-off Jan 2020 | 2133 Balboa St | remodel kitchen, bath, bedrooms, convert (e) wc to full bath, add internal stair to (e) ground floor habitable space, add 2 bedrooms and 1 bath, fill-in under (e) sunroom. no work to 2135 balboa upper floor unit.Details
remodel kitchen, bath, bedrooms, convert (e) wc to full bath, add internal stair to (e) ground floor habitable space, add 2 bedrooms and 1 bath, fill-in under (e) sunroom. no work to 2135 balboa upper floor unit. | $120,000 |
| Oct 26, 2018 | Completed final sign-off Sep 2019 | 1635 Bush St | unit 10: turn hallway into laundry, move electrical panel, outside closet with min clearance, refinish kitchen cabinets, new kitchen counter tops, non bearing wall, change bedroom door to sliding, new flooring throughout, repaint walls, bathroom shower niche install in master bath, non rated wall.Details
unit 10: turn hallway into laundry, move electrical panel, outside closet with min clearance, refinish kitchen cabinets, new kitchen counter tops, non bearing wall, change bedroom door to sliding, new flooring throughout, repaint walls, bathroom shower niche install in master bath, non rated wall. | $35,000 |