Back to kitchen remodel contractors
Van Ray Vorheis
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to Sep 2012
- Last 24 months
- 0 permits filed
27 permits since 2000: 26 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 22, 2008 | Completed final sign-off May 2009 | 2112 Pine St | upgrade kitchen new cabinets, floor, dry wall with 5/8" type "x" frig countertop, sink etc. upgrade existing bathroom, new tub, tile, floor, vanity paint entire interior walls, trim, ceiling. upgrade electrical.Details
upgrade kitchen new cabinets, floor, dry wall with 5/8" type "x" frig countertop, sink etc. upgrade existing bathroom, new tub, tile, floor, vanity paint entire interior walls, trim, ceiling. upgrade electrical. | $38,000 |
| May 3, 2007 | Completed final sign-off Jun 2007 | 58 Heather Av | remove existing kitchen cabinet and countertop and replace with new. new finyl floor, paint walls and ceiling. no change in walls or window. electrical outlets (2) code in kitchen. no lighting changes. work in unit 60 onlyDetails
remove existing kitchen cabinet and countertop and replace with new. new finyl floor, paint walls and ceiling. no change in walls or window. electrical outlets (2) code in kitchen. no lighting changes. work in unit 60 only | $7,500 |
| Jul 26, 2006 | Completed final sign-off Nov 2007 | 608 Kirkham St | remodel kitchen, bath, new windows, partial concrete slab leaglize existing bedroom a grd flr + bath.Details
remodel kitchen, bath, new windows, partial concrete slab leaglize existing bedroom a grd flr + bath. | $140,000 |
| Jan 18, 2006 | Completed final sign-off May 2006 | 58 Heather Av | remove (e) kitchen cabinets and cook stove. install new cabinets and stove, new vinyl floor paint walls & ceiling at #62 no change to /walls on windows.Details
remove (e) kitchen cabinets and cook stove. install new cabinets and stove, new vinyl floor paint walls & ceiling at #62 no change to /walls on windows. | $6,000 |