Back to bathroom remodel contractors
Van Ray Vorheis
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to Sep 2012
- Last 24 months
- 0 permits filed
27 permits since 2000: 26 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2012 | Completed final sign-off Mar 2012 | 4522 19th St | remodel down stairs. new bathroomDetails
remodel down stairs. new bathroom | $72,500 |
| Apr 14, 2010 | Completed final sign-off Sep 2010 | 312 Maple St | interior remodeling of (e) bathroom & home office. no square fottage, height or buck is added. the only exterior changes are the replacement of (e) window with new dual-glazed to matchDetails
interior remodeling of (e) bathroom & home office. no square fottage, height or buck is added. the only exterior changes are the replacement of (e) window with new dual-glazed to match | $54,000 |
| Jan 8, 2009 | Completed final sign-off May 2009 | 2112 Pine St | demolish non-bearing wall in master bathroom. remodel bathroom and add 1/2 bathroomDetails
demolish non-bearing wall in master bathroom. remodel bathroom and add 1/2 bathroom | $10,000 |
| Oct 22, 2008 | Completed final sign-off May 2009 | 2112 Pine St | upgrade kitchen new cabinets, floor, dry wall with 5/8" type "x" frig countertop, sink etc. upgrade existing bathroom, new tub, tile, floor, vanity paint entire interior walls, trim, ceiling. upgrade electrical.Details
upgrade kitchen new cabinets, floor, dry wall with 5/8" type "x" frig countertop, sink etc. upgrade existing bathroom, new tub, tile, floor, vanity paint entire interior walls, trim, ceiling. upgrade electrical. | $38,000 |
| Feb 21, 2008 | Expired or cancelled expired Apr 2010 | 312 Maple St | remodel (e) guest bedroom and full bathroom on the ground floor. remove (e) toilet. remove (e) window and add new window and double door. all work on the ground floor.Details
remodel (e) guest bedroom and full bathroom on the ground floor. remove (e) toilet. remove (e) window and add new window and double door. all work on the ground floor. | $97,460 |
| Sep 25, 2007 | Completed final sign-off Jan 2008 | 33 Ford St | upgrade upstairs bath :new tile around tub, new pedestal sink wainscott, tile floor move toilet, new toilet,install new medicine cab paint walls and ceiling demo extg sheet rock and old tile flood. hi efficiant lighting or manual on auto off switch non structuralDetails
upgrade upstairs bath :new tile around tub, new pedestal sink wainscott, tile floor move toilet, new toilet,install new medicine cab paint walls and ceiling demo extg sheet rock and old tile flood. hi efficiant lighting or manual on auto off switch non structural | $24,900 |
| Jul 26, 2006 | Completed final sign-off Nov 2007 | 608 Kirkham St | remodel kitchen, bath, new windows, partial concrete slab leaglize existing bedroom a grd flr + bath.Details
remodel kitchen, bath, new windows, partial concrete slab leaglize existing bedroom a grd flr + bath. | $140,000 |
| Sep 23, 2004 | Completed final sign-off Jan 2005 | 734 30th Av | bath remodel, remove e tile floor, wainscott, lath, plaster walls, ceiling. replace tub,toilet,vanitDetails
bath remodel, remove e tile floor, wainscott, lath, plaster walls, ceiling. replace tub,toilet,vanit | $14,700 |
| Sep 22, 2003 | Completed final sign-off Mar 2004 | 1488 Noe St | remodel bathroom, remove (e) tile in shower, remove tub/sink/toilet & replace w/new. no structuralDetails
remodel bathroom, remove (e) tile in shower, remove tub/sink/toilet & replace w/new. no structural | $8,000 |
| Oct 28, 2002 | Completed final sign-off Jan 2003 | 875 Castro St | remodel bath, new tub/sheetrock/tile, move toilet, new light fix., new pedestal sink, interior remodDetails
remodel bath, new tub/sheetrock/tile, move toilet, new light fix., new pedestal sink, interior remod | $14,450 |