Block 1012, lot 023
312 Maple St
- City’s use
- Single Family Residential
- Built
- 1908
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 3,410 sq ft
- Lot
- 2,812 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 10, 2014 | Completed final sign-off Jul 2014 | 312 Maple St | Gil Construction & Assoc Inc. | repair front landing under 50%Details
repair front landing under 50% | $7,500 |
| Oct 15, 2013 | Completed final sign-off Jan 2014 | 312 Maple St | Gil Construction & Assoc Inc. | remodel one bathroom, no structuralDetails
remodel one bathroom, no structural | $18,000 |
| Jun 26, 2013 | Completed final sign-off Jan 2014 | 312 Maple St | Gil Construction & Assoc Inc. | add walls for master bedroom closet and new lectrical outlets.Details
add walls for master bedroom closet and new lectrical outlets. | $8,000 |
| Jun 12, 2013 | Completed final sign-off Jan 2014 | 312 Maple St | Gil Construction & Assoc Inc. | remodel of existing garage, including relocating of (e) furnace, new garage door and plantor box. revision to existing pa# 201305146792Details
remodel of existing garage, including relocating of (e) furnace, new garage door and plantor box. revision to existing pa# 201305146792 | $5,000 |
| May 14, 2013 | Completed final sign-off Jan 2014 | 312 Maple St | Gil Construction & Assoc Inc. | replace extg brick foundation. new steel moment frame at front of bldg. replace extg frame floor a long northern half of bldg with concrete slab on grade.Details
replace extg brick foundation. new steel moment frame at front of bldg. replace extg frame floor a long northern half of bldg with concrete slab on grade. | $63,000 |
| Sep 20, 2012 | Completed final sign-off Feb 2013 | 312 Maple St | Van Ray Vorheis | remove and replace extg plust or minus 4 feet high side yard retaining with new @ rear yard.Details
remove and replace extg plust or minus 4 feet high side yard retaining with new @ rear yard. | $8,000 |
| Apr 14, 2010 | Completed final sign-off Sep 2010 | 312 Maple St | Van Ray Vorheis | interior remodeling of (e) bathroom & home office. no square fottage, height or buck is added. the only exterior changes are the replacement of (e) window with new dual-glazed to matchDetails
interior remodeling of (e) bathroom & home office. no square fottage, height or buck is added. the only exterior changes are the replacement of (e) window with new dual-glazed to match | $54,000 |
| Jul 17, 2008 | Never finaled issued Jul 2008, no final | 312 Maple St | street space permit only.Details
street space permit only. | ||
| May 16, 2008 | Never finaled issued May 2008, no final | 312 Maple St | street space permit only.Details
street space permit only. | ||
| Feb 21, 2008 | Expired or cancelled expired Apr 2010 | 312 Maple St | Van Ray Vorheis | remodel (e) guest bedroom and full bathroom on the ground floor. remove (e) toilet. remove (e) window and add new window and double door. all work on the ground floor.Details
remodel (e) guest bedroom and full bathroom on the ground floor. remove (e) toilet. remove (e) window and add new window and double door. all work on the ground floor. | $97,460 |
| Oct 22, 2007 | Completed final sign-off Feb 2013 | 312 Maple St | Van Ray Vorheis | water damage replace sheetrock and insulation downstair family room, ceiling and walls. electrical wires & replace recessed fixtures. new baseboards and door casing. paint oil primer, 2 topcoats interior paint. no structural work.Details
water damage replace sheetrock and insulation downstair family room, ceiling and walls. electrical wires & replace recessed fixtures. new baseboards and door casing. paint oil primer, 2 topcoats interior paint. no structural work. | $15,000 |
| Feb 4, 2004 | Completed final sign-off Apr 2004 | 312 Maple St | Edward Carey Construction Co. | replace (e) deck at rear of house in kindDetails
replace (e) deck at rear of house in kind | $25,000 |
| Dec 15, 2003 | Completed final sign-off Apr 2004 | 312 Maple St | Edward Carey Construction Co. | remodel bathroom, replace in kind, no structural alterationsDetails
remodel bathroom, replace in kind, no structural alterations | $15,000 |
| Nov 12, 2003 | Never finaled issued Nov 2003, no final | 312 Maple St | street space permitDetails
street space permit | ||
| Nov 7, 2003 | Completed final sign-off Apr 2004 | 312 Maple St | remodel kitchen w/bay window addition.replace window @family room bay,upgrade lighting/elec @kitchenDetails
remodel kitchen w/bay window addition.replace window @family room bay,upgrade lighting/elec @kitchen | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gil Construction & Assoc Inc. (5), Van Ray Vorheis (4), Edward Carey Construction Co. (2)
- Architects
- Joram Altman
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.