Back to kitchen remodel contractors
Urban West Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2021 to Sep 2026
- Last 24 months
- 41 permits filed
52 permits since 2000: 29 completed, 22 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2025 | Completed final sign-off May 2026 | 5150 Diamond Heights Bl | unit 304b: renovation w/ selective demo, modifications to plumbing and electrical systems as required. full kitchen replacement, new plumbing and lighting fixtures; retiling of floor in bathroom 1; full remodel of bathroom 2; new flooring throughout; & full painting. no removal of wallsDetails
unit 304b: renovation w/ selective demo, modifications to plumbing and electrical systems as required. full kitchen replacement, new plumbing and lighting fixtures; retiling of floor in bathroom 1; full remodel of bathroom 2; new flooring throughout; & full painting. no removal of walls | $99,000 |
| Oct 15, 2025 | Completed final sign-off Jan 2026 | 150 Page St | kitchen remodel and removal of carpet swap out of existing light fixtures and paint unit. (unit 410)Details
kitchen remodel and removal of carpet swap out of existing light fixtures and paint unit. (unit 410) | $40,000 |
| Jul 1, 2025 | Completed final sign-off Apr 2026 | 105 Lundys Ln | remodel of e) basement. basement is to be unconditioned space. replace entry door. move & replace garage door. remove kitchenette, living area, & bedroom & convert to non-habitable spaceDetails
remodel of e) basement. basement is to be unconditioned space. replace entry door. move & replace garage door. remove kitchenette, living area, & bedroom & convert to non-habitable space | $15,000 |
| Oct 30, 2024 | Completed final sign-off Mar 2025 | 1200 California St | unit #17c interior non structural remodel. new kitchen cabinets with (n) counter, addition of laundry room for washer dryer. remodel 3 bathrooms,1 bathroom tub to shower, one bathroom to powder room. new flooring and plumbing fixtures in areas of remodelDetails
unit #17c interior non structural remodel. new kitchen cabinets with (n) counter, addition of laundry room for washer dryer. remodel 3 bathrooms,1 bathroom tub to shower, one bathroom to powder room. new flooring and plumbing fixtures in areas of remodel | $420,000 |
| Jun 4, 2024 | Completed final sign-off Jul 2024 | 2595 Clay St | unit 2: one kitchen remodel: bathroom fixture replacement, new floors. bathroom remodel consists of new tile floor, new vanity, new shower trim and new shower headDetails
unit 2: one kitchen remodel: bathroom fixture replacement, new floors. bathroom remodel consists of new tile floor, new vanity, new shower trim and new shower head | $15,000 |
| Sep 27, 2023 | Completed final sign-off Aug 2024 | 1281 Greenwich St | to comply with enforcement case 2022-007739. contruct wall around staircase to seperate both units at this address. legalize 3/f kitchen. house remains a 2 unit buildingDetails
to comply with enforcement case 2022-007739. contruct wall around staircase to seperate both units at this address. legalize 3/f kitchen. house remains a 2 unit building | $40,000 |
| Sep 16, 2021 | Never finaled filed Sep 2021, never issued | 1177 Polk St | tenant improvement for full restaurant into existing shell space, including new dining and kitchen areas, new equipment, new lighting, new finishes, and new mep work.Details
tenant improvement for full restaurant into existing shell space, including new dining and kitchen areas, new equipment, new lighting, new finishes, and new mep work. | $150,000 |