Back to bathroom remodel contractors
Urban West Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2021 to Sep 2026
- Last 24 months
- 41 permits filed
52 permits since 2000: 29 completed, 22 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2025 | Completed final sign-off May 2026 | 5150 Diamond Heights Bl | unit 304b: renovation w/ selective demo, modifications to plumbing and electrical systems as required. full kitchen replacement, new plumbing and lighting fixtures; retiling of floor in bathroom 1; full remodel of bathroom 2; new flooring throughout; & full painting. no removal of wallsDetails
unit 304b: renovation w/ selective demo, modifications to plumbing and electrical systems as required. full kitchen replacement, new plumbing and lighting fixtures; retiling of floor in bathroom 1; full remodel of bathroom 2; new flooring throughout; & full painting. no removal of walls | $99,000 |
| Apr 15, 2025 | Completed final sign-off Sep 2025 | 98 Clarendon Av | ref pa# 2021-0614-2305: per inspector requirement for new scope of work for bathroom remodel includes installation of new plumbing and lighting fixtures, new tile flooring and wall finishes, modifiction to plumbing and electrical systems as requiredDetails
ref pa# 2021-0614-2305: per inspector requirement for new scope of work for bathroom remodel includes installation of new plumbing and lighting fixtures, new tile flooring and wall finishes, modifiction to plumbing and electrical systems as required | $2,300 |
| Oct 30, 2024 | Completed final sign-off Mar 2025 | 1200 California St | unit #17c interior non structural remodel. new kitchen cabinets with (n) counter, addition of laundry room for washer dryer. remodel 3 bathrooms,1 bathroom tub to shower, one bathroom to powder room. new flooring and plumbing fixtures in areas of remodelDetails
unit #17c interior non structural remodel. new kitchen cabinets with (n) counter, addition of laundry room for washer dryer. remodel 3 bathrooms,1 bathroom tub to shower, one bathroom to powder room. new flooring and plumbing fixtures in areas of remodel | $420,000 |
| Jun 4, 2024 | Completed final sign-off Jul 2024 | 2595 Clay St | unit 2: one kitchen remodel: bathroom fixture replacement, new floors. bathroom remodel consists of new tile floor, new vanity, new shower trim and new shower headDetails
unit 2: one kitchen remodel: bathroom fixture replacement, new floors. bathroom remodel consists of new tile floor, new vanity, new shower trim and new shower head | $15,000 |
| Aug 14, 2023 | Completed final sign-off Oct 2023 | 2757 Divisadero St | bathroom remodel - tub to shower.Details
bathroom remodel - tub to shower. | $15,000 |