Back to kitchen remodel contractors
Urban Design & Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Mar 2012
- Last 24 months
- 0 permits filed
41 permits since 2000: 32 completed, 2 never finaled, 7 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 8 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 23, 2011 | Completed final sign-off Jul 2011 | 442 Collingwood St | rear cottage - kitchen remodel, replace in kind, new cabinets, appliances, update electrical to code, tiling, paint.Details
rear cottage - kitchen remodel, replace in kind, new cabinets, appliances, update electrical to code, tiling, paint. | $10,900 |
| Mar 7, 2011 | Completed final sign-off Mar 2011 | 739 Shrader St | kitchen remodel. 1 cabinet, replace oven and hood in kind, new countertopDetails
kitchen remodel. 1 cabinet, replace oven and hood in kind, new countertop | $5,000 |
| Jan 27, 2011 | Completed final sign-off Jul 2011 | 20 Paloma Av | remodel kitchen: replace in-kind, bring plumbing & electrical up to code. lighting changes to comply with cec 150 (k), no change wall windwos, doors at front; @ rear change 2 windows in kind & 1 rear door; min u-factor 0.40.Details
remodel kitchen: replace in-kind, bring plumbing & electrical up to code. lighting changes to comply with cec 150 (k), no change wall windwos, doors at front; @ rear change 2 windows in kind & 1 rear door; min u-factor 0.40. | $15,000 |
| Jun 11, 2010 | Completed final sign-off Sep 2010 | 66 Cleary Ct | unit # 206: interior remodeling - 2 bathrooms: replace in kind, tiling, tub, fixtures, shower tiling/fixtures, vanities, all - unit plugs and switches in kind; kitchen in kind - cabs, sink, appliances, all doors, paint, new hardwood flooringDetails
unit # 206: interior remodeling - 2 bathrooms: replace in kind, tiling, tub, fixtures, shower tiling/fixtures, vanities, all - unit plugs and switches in kind; kitchen in kind - cabs, sink, appliances, all doors, paint, new hardwood flooring | $40,000 |
| Aug 24, 2009 | Expired or cancelled expired Dec 2010 | 1477 09th Av | reove wall in kitch/dining and dining/living room. raise headers/ openingsto 8'and provide new headers on new i openings, reinforce floor joists on 2nd fl. remodel (e0 kitchen with new cabs, appliances and new associated elec and plumbing.Details
reove wall in kitch/dining and dining/living room. raise headers/ openingsto 8'and provide new headers on new i openings, reinforce floor joists on 2nd fl. remodel (e0 kitchen with new cabs, appliances and new associated elec and plumbing. | $75,000 |
| Apr 7, 2009 | Completed final sign-off May 2009 | 856 Cole St | #854- reinforce ceiling beam between living rm. & kitchen to support 3rd. floor & roof framing loads. work to be performed in unit 854.Details
#854- reinforce ceiling beam between living rm. & kitchen to support 3rd. floor & roof framing loads. work to be performed in unit 854. | $5,000 |
| May 14, 2008 | Completed final sign-off Jul 2008 | 490 Joost Av | kitchen remodel adjust sink lines, gas line, adjust 3 elec plugs, receptacles, install new floor & cabinetryDetails
kitchen remodel adjust sink lines, gas line, adjust 3 elec plugs, receptacles, install new floor & cabinetry | $5,000 |
| Apr 2, 2008 | Completed final sign-off Dec 2008 | 357 Missouri St | interior remodel work 1st and 2nd level. 1st fl: remodel kitchen, move bath,remove existing 1/2 bath, revise stairs, move up header between kitchen and dining room,remove built in cbnet in dining rm, replace sliding glass door. 2nd fl: add 1 and reconfigur e closet space in bedroom, enlarge bathDetails
interior remodel work 1st and 2nd level. 1st fl: remodel kitchen, move bath,remove existing 1/2 bath, revise stairs, move up header between kitchen and dining room,remove built in cbnet in dining rm, replace sliding glass door. 2nd fl: add 1 and reconfigur e closet space in bedroom, enlarge bath | $125,000 |
| Feb 12, 2008 | Completed final sign-off Jun 2008 | 66 Cleary Ct | unit #1008- interior remodel, new doors, cabinetry, plumb-in new kitchen appliances (dishwasher, washing machine, fridge ice/h20 line.Details
unit #1008- interior remodel, new doors, cabinetry, plumb-in new kitchen appliances (dishwasher, washing machine, fridge ice/h20 line. | $10,000 |
| May 23, 2007 | Expired or cancelled expired Oct 2008 | 446 Chenery St | new bathroom fixtures, sink, toilet, shower baht tub, update plumbing to kitchen, remove abs and replace w/copper, hot/cold water to sink. new bathroom walls, new sheetrock, lights, sub panel upstairsDetails
new bathroom fixtures, sink, toilet, shower baht tub, update plumbing to kitchen, remove abs and replace w/copper, hot/cold water to sink. new bathroom walls, new sheetrock, lights, sub panel upstairs | $42,000 |