Back to bathroom remodel contractors
Urban Design & Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Mar 2012
- Last 24 months
- 0 permits filed
41 permits since 2000: 32 completed, 2 never finaled, 7 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 10 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2012 | Completed final sign-off Jun 2012 | 271 San Marcos Av | bath remodel, replace in-kind, new electrical/plumbing, shower pan, new fixturesDetails
bath remodel, replace in-kind, new electrical/plumbing, shower pan, new fixtures | $10,000 |
| Mar 16, 2011 | Completed final sign-off Jul 2011 | 20 Paloma Av | 1 guest bathroom-replace fixtures in kind, new tiling, sheetrock & paint. lighting to comply with cec 150(k). no change to walls, windows or doorsDetails
1 guest bathroom-replace fixtures in kind, new tiling, sheetrock & paint. lighting to comply with cec 150(k). no change to walls, windows or doors | $9,200 |
| Jan 11, 2011 | Completed final sign-off Mar 2011 | 122 Hoffman Av | remodel guest & master bathrooms. replace in kind. no change of wall. master bath is 6'x10', guest bath is 7.5x6'.Details
remodel guest & master bathrooms. replace in kind. no change of wall. master bath is 6'x10', guest bath is 7.5x6'. | $27,629 |
| Dec 28, 2010 | Completed final sign-off Apr 2011 | 435 Crestmont Dr | replace master bathroom inkind,new fixtures, tile, lightingDetails
replace master bathroom inkind,new fixtures, tile, lighting | $10,000 |
| Jun 11, 2010 | Completed final sign-off Sep 2010 | 66 Cleary Ct | unit # 206: interior remodeling - 2 bathrooms: replace in kind, tiling, tub, fixtures, shower tiling/fixtures, vanities, all - unit plugs and switches in kind; kitchen in kind - cabs, sink, appliances, all doors, paint, new hardwood flooringDetails
unit # 206: interior remodeling - 2 bathrooms: replace in kind, tiling, tub, fixtures, shower tiling/fixtures, vanities, all - unit plugs and switches in kind; kitchen in kind - cabs, sink, appliances, all doors, paint, new hardwood flooring | $40,000 |
| Apr 2, 2008 | Completed final sign-off Dec 2008 | 357 Missouri St | interior remodel work 1st and 2nd level. 1st fl: remodel kitchen, move bath,remove existing 1/2 bath, revise stairs, move up header between kitchen and dining room,remove built in cbnet in dining rm, replace sliding glass door. 2nd fl: add 1 and reconfigur e closet space in bedroom, enlarge bathDetails
interior remodel work 1st and 2nd level. 1st fl: remodel kitchen, move bath,remove existing 1/2 bath, revise stairs, move up header between kitchen and dining room,remove built in cbnet in dining rm, replace sliding glass door. 2nd fl: add 1 and reconfigur e closet space in bedroom, enlarge bath | $125,000 |
| Feb 12, 2008 | Completed final sign-off Sep 2008 | 65 Ora Wy | unit #301-bath remodel: exchange vanity, sink fixture, shower fixtures, shower tile. tile bathroom floor, (e) exhaust fan.Details
unit #301-bath remodel: exchange vanity, sink fixture, shower fixtures, shower tile. tile bathroom floor, (e) exhaust fan. | $10,000 |
| Sep 10, 2007 | Completed final sign-off Feb 2008 | 1969 Jefferson St | field changes to previously approved pa# 2007.03.14.6194. demo of interior non struc.walls. (n) walls for exercise, laundry and half-bathroom. this permit is to address report of physical inspection of feb.6, 2007. non structural work.Details
field changes to previously approved pa# 2007.03.14.6194. demo of interior non struc.walls. (n) walls for exercise, laundry and half-bathroom. this permit is to address report of physical inspection of feb.6, 2007. non structural work. | $3,000 |
| May 23, 2007 | Expired or cancelled expired Oct 2008 | 446 Chenery St | new bathroom fixtures, sink, toilet, shower baht tub, update plumbing to kitchen, remove abs and replace w/copper, hot/cold water to sink. new bathroom walls, new sheetrock, lights, sub panel upstairsDetails
new bathroom fixtures, sink, toilet, shower baht tub, update plumbing to kitchen, remove abs and replace w/copper, hot/cold water to sink. new bathroom walls, new sheetrock, lights, sub panel upstairs | $42,000 |
| May 22, 2007 | Completed final sign-off Aug 2007 | 1105 Battery St | demo & replace bathrooms fixtures on 1/f & 2/f. demo of existing full height walls & replace of low height walls, 2 new conference rooms, 1 on 1/f, 1 on 2/f, plumbing in new fixtures, new carpeting. lighting under seperate eprmit, all interior work.Details
demo & replace bathrooms fixtures on 1/f & 2/f. demo of existing full height walls & replace of low height walls, 2 new conference rooms, 1 on 1/f, 1 on 2/f, plumbing in new fixtures, new carpeting. lighting under seperate eprmit, all interior work. | $80,000 |
| Mar 14, 2007 | Completed final sign-off Feb 2008 | 1969 Jefferson St | response to report of physical inspection - app. 3r-4801 of feb. 23, 2007 existing structure, bathroom & electrical included - water heater furnace, plumbing, electrical outlets and lighting. legalize rooms at garage level.Details
response to report of physical inspection - app. 3r-4801 of feb. 23, 2007 existing structure, bathroom & electrical included - water heater furnace, plumbing, electrical outlets and lighting. legalize rooms at garage level. | $1,500 |