Permit GraphShortlistSan Francisco building permits since 2000

Umadhay Construction & Design

Contractor license
723838
State license record
Based in
San Francisco
On San Francisco permits
Jul 2011 to Sep 2025
Last 24 months
2 permits filed

37 permits since 2000: 25 completed, 2 in progress, 6 never finaled, 4 expired or cancelled.

Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllStairs 8Kitchen remodel 10Bathroom remodel 9

8 stairs permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 56 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Feb 2, 2023Completed
final sign-off Jul 2024
408 Utah Strenovation of (e) 2-story carriage house kitchen & bath, new spiral stairs, replace new partition wall to create office on 2/f
Details
Permit
202302021222
Status
complete
Filed
Feb 2, 2023
Permit issued
Feb 28, 2023
Final sign-off
Jul 25, 2024
Declared cost
$150,000
Address
408 Utah St

renovation of (e) 2-story carriage house kitchen & bath, new spiral stairs, replace new partition wall to create office on 2/f

Open the permit page

$150,000
May 13, 2019Never finaled
filed May 2019, never issued
1062 Huron Avto comply with nov 201404731 - legalization of bedroom, upgrade electrical panel, repair toilet & bath, install new connecting stair from 2nd floor to basement.
Details
Permit
201905130429
Status
filed
Filed
May 13, 2019
Declared cost
$45,000
Address
1062 Huron Av

to comply with nov 201404731 - legalization of bedroom, upgrade electrical panel, repair toilet & bath, install new connecting stair from 2nd floor to basement.

Open the permit page

$45,000
Jan 24, 2018Completed
final sign-off Feb 2018
15 Guerrero Streplacing 8 to 9 common area windows, replace less than 50% of back stairs due to dry rot. to comply with nov#200343379,item 2.
Details
Permit
201801249459
Status
complete
Filed
Jan 24, 2018
Permit issued
Jan 24, 2018
Final sign-off
Feb 1, 2018
Declared cost
$5,500
Address
15 Guerrero St

replacing 8 to 9 common area windows, replace less than 50% of back stairs due to dry rot. to comply with nov#200343379,item 2.

Open the permit page

$5,500
Jan 24, 2018Completed
final sign-off Feb 2018
21 Guerrero Streplacing 8 to 9 common area windows, replace less than 50% of back stairs due to dry rot. also to comply with nov#200997220.
Details
Permit
201801249462
Status
complete
Filed
Jan 24, 2018
Permit issued
Jan 24, 2018
Final sign-off
Feb 1, 2018
Declared cost
$5,500
Address
21 Guerrero St

replacing 8 to 9 common area windows, replace less than 50% of back stairs due to dry rot. also to comply with nov#200997220.

Open the permit page

$5,500
Jan 2, 2018Completed
final sign-off Nov 2020
247 Madrid Stconstruction of 2 bedroom, 1 study room, 1 bath, bar sink, family room @ 1st floor. circular stair to 2nd floor. remodel toiet & add 1 bath @ 2nd floor, install 5x10 lightwell.
Details
Permit
201801027698
Status
complete
Filed
Jan 2, 2018
Permit issued
Jan 16, 2018
Final sign-off
Nov 4, 2020
Declared cost
$180,000
Address
247 Madrid St

construction of 2 bedroom, 1 study room, 1 bath, bar sink, family room @ 1st floor. circular stair to 2nd floor. remodel toiet & add 1 bath @ 2nd floor, install 5x10 lightwell.

Open the permit page

$180,000
Jul 29, 2014Completed
final sign-off Sep 2014
1508 Taraval Streplacement of stair in-kind @ side of the building (not visible from street). same location.
Details
Permit
201407292428
Status
complete
Filed
Jul 29, 2014
Permit issued
Jul 30, 2014
Final sign-off
Sep 3, 2014
Declared cost
$6,000
Address
1508 Taraval St

replacement of stair in-kind @ side of the building (not visible from street). same location.

Open the permit page

$6,000
Nov 1, 2011Completed
final sign-off Jan 2012
727 41st Avrelocate lightwell stairs and door to north side of the rear bedroom. replace e door with window per plan.
Details
Permit
201111018022
Status
complete
Filed
Nov 1, 2011
Permit issued
Nov 15, 2011
Final sign-off
Jan 31, 2012
Declared cost
$1,000
Address
727 41st Av

relocate lightwell stairs and door to north side of the rear bedroom. replace e door with window per plan.

Open the permit page

$1,000
Jul 12, 2011Expired or cancelled
expired Feb 2013
4014 Mission Strepair fire damagedwindow at front and rear. comply with notice of violation 201148889. remove fire damaged debris and fire damaged. no structural work and soft demo. legalize mechanical room, partial complaince only. stairs at rear to be done with additional permit.
Details
Permit
201107120002
Status
expired
Filed
Jul 12, 2011
Permit issued
Jul 12, 2011
Declared cost
$2,000
Address
4014 Mission St

repair fire damagedwindow at front and rear. comply with notice of violation 201148889. remove fire damaged debris and fire damaged. no structural work and soft demo. legalize mechanical room, partial complaince only. stairs at rear to be done with additional permit.

Open the permit page

$2,000