Back to bathroom remodel contractors
Umadhay Construction & Design
- Based in
- San Francisco
- On San Francisco permits
- Jul 2011 to Sep 2025
- Last 24 months
- 2 permits filed
37 permits since 2000: 25 completed, 2 in progress, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 never finaled. Typically 7 days from filing to permit and 278 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2023 | Completed final sign-off Jul 2024 | 408 Utah St | renovation of (e) 2-story carriage house kitchen & bath, new spiral stairs, replace new partition wall to create office on 2/fDetails
renovation of (e) 2-story carriage house kitchen & bath, new spiral stairs, replace new partition wall to create office on 2/f | $150,000 |
| Nov 10, 2021 | Completed final sign-off Apr 2022 | 53 Van Buren St | replace in kind of fixtures. bathroom remodel.Details
replace in kind of fixtures. bathroom remodel. | $20,000 |
| Jan 29, 2020 | Completed final sign-off Nov 2021 | 1062 Huron Av | adu of units downstairs, upgrade of electrical to 200 amp repair toilet and bath, provide new kitchenDetails
adu of units downstairs, upgrade of electrical to 200 amp repair toilet and bath, provide new kitchen | $45,000 |
| May 13, 2019 | Never finaled filed May 2019, never issued | 1062 Huron Av | to comply with nov 201404731 - legalization of bedroom, upgrade electrical panel, repair toilet & bath, install new connecting stair from 2nd floor to basement.Details
to comply with nov 201404731 - legalization of bedroom, upgrade electrical panel, repair toilet & bath, install new connecting stair from 2nd floor to basement. | $45,000 |
| Jan 2, 2018 | Completed final sign-off Nov 2020 | 247 Madrid St | construction of 2 bedroom, 1 study room, 1 bath, bar sink, family room @ 1st floor. circular stair to 2nd floor. remodel toiet & add 1 bath @ 2nd floor, install 5x10 lightwell.Details
construction of 2 bedroom, 1 study room, 1 bath, bar sink, family room @ 1st floor. circular stair to 2nd floor. remodel toiet & add 1 bath @ 2nd floor, install 5x10 lightwell. | $180,000 |
| Dec 2, 2016 | Completed final sign-off Jan 2017 | 225 Waller St | converting closet into half bath. installing plumbing for toilet and single vanity. installing electrical for light and gfiDetails
converting closet into half bath. installing plumbing for toilet and single vanity. installing electrical for light and gfi | $7,000 |
| Dec 9, 2015 | Completed final sign-off Mar 2017 | 3166 16th St | t.i. to extg space. new electrical outlets and lighting. add sinks. upgrade extg bathroom for disabled persons. breakroom. to comply with nov #201538583Details
t.i. to extg space. new electrical outlets and lighting. add sinks. upgrade extg bathroom for disabled persons. breakroom. to comply with nov #201538583 | $30,000 |
| Sep 11, 2015 | Completed final sign-off Nov 2015 | 378 Golden Gate Av | kitchen and bath remodel, new bathtub, mixing valve, angle stops, electrical where needed, new dishwasher, move drain lines,Details
kitchen and bath remodel, new bathtub, mixing valve, angle stops, electrical where needed, new dishwasher, move drain lines, | $13,000 |
| May 17, 2013 | Completed final sign-off Aug 2013 | 193 Henry St | remodel of bathroom & kitchenDetails
remodel of bathroom & kitchen | $15,000 |