Back to kitchen remodel contractors
Udream Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2013 to Nov 2025
- Last 24 months
- 1 permit filed
20 permits since 2000: 18 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 10 completed. Typically 0 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2025 | Completed final sign-off Dec 2025 | 60 Stonecrest Dr | like for like kitchen remodel. partial remodel of bathroom on upper floor and half bathroom on main floor. not to include lower level rooms. to correct nov #202543151Details
like for like kitchen remodel. partial remodel of bathroom on upper floor and half bathroom on main floor. not to include lower level rooms. to correct nov #202543151 | $40,000 |
| Apr 30, 2021 | Completed final sign-off Nov 2021 | 66 Cleary Ct | 1402: in kind kitchen remodel. in kind bathroom remodel. (both master & guest)Details
1402: in kind kitchen remodel. in kind bathroom remodel. (both master & guest) | $30,000 |
| Mar 11, 2021 | Completed final sign-off Aug 2023 | 2096 Fell St | kitchen remodel, upgrade plumb, upgrade ele, upgrade vent roof. connect stove to e gas line, install cabinets countertops, 2 bath remodel, 2 new tub upgrade plumbinb, upgrade elec, upgrade exhaust fan, wet walls inspection 2nd bath new dcurb shower bench upgrade plumb, upgrade elec, mechDetails
kitchen remodel, upgrade plumb, upgrade ele, upgrade vent roof. connect stove to e gas line, install cabinets countertops, 2 bath remodel, 2 new tub upgrade plumbinb, upgrade elec, upgrade exhaust fan, wet walls inspection 2nd bath new dcurb shower bench upgrade plumb, upgrade elec, mech | $45,000 |
| Jan 15, 2021 | Completed final sign-off May 2021 | 2845 Polk St | unit 103 in kind kitchen remodel. unit 103 onlyDetails
unit 103 in kind kitchen remodel. unit 103 only | $25,000 |
| Oct 24, 2020 | Completed final sign-off Nov 2021 | 2328 19th Av | 2/f: remodel (e) kitchen, infill (e) 2nd floor only lightwell and new skylight. remove (e) fire place.Details
2/f: remodel (e) kitchen, infill (e) 2nd floor only lightwell and new skylight. remove (e) fire place. | $45,000 |
| Jul 28, 2017 | Completed final sign-off Mar 2018 | 339 College Av | kitchen and bathroom update in kind, replace 19 windows on the second floor, replace 5 street facing windows in kind wood casement windows with matching divided lite panels in kindDetails
kitchen and bathroom update in kind, replace 19 windows on the second floor, replace 5 street facing windows in kind wood casement windows with matching divided lite panels in kind | $30,000 |
| Apr 18, 2016 | Completed final sign-off Jul 2016 | 2127 46th Av | kitchen update - replace cabinet, counter top & tile floor. bathroom update - replace shower, vanity and toilet. replace in kind.Details
kitchen update - replace cabinet, counter top & tile floor. bathroom update - replace shower, vanity and toilet. replace in kind. | $15,000 |
| Sep 14, 2015 | Completed final sign-off Oct 2015 | 156 Amherst St | kitchen remodel: replace kitchen cabinet, countertop & install 7 recessed lights in kitchen ceiling. no wall to be removed & no plubming/mechanical work will be performed behind wall.Details
kitchen remodel: replace kitchen cabinet, countertop & install 7 recessed lights in kitchen ceiling. no wall to be removed & no plubming/mechanical work will be performed behind wall. | $8,000 |
| Oct 1, 2014 | Completed final sign-off Nov 2014 | 1284 03rd Av | repair back stairway approx. 10% - replace stringer & hand /guard rails; caused by fire damage; replace approx. 40 s.f. of sidings; replace a 2" drain pipe from garage to roof; install 5/8" sheetrock for unit 1286 kitchen ceilingDetails
repair back stairway approx. 10% - replace stringer & hand /guard rails; caused by fire damage; replace approx. 40 s.f. of sidings; replace a 2" drain pipe from garage to roof; install 5/8" sheetrock for unit 1286 kitchen ceiling | $24,000 |
| Feb 19, 2014 | Completed final sign-off Feb 2014 | 1284 03rd Av | to replace (3) windows in kitchen not visible from street. u-factor < -.4Details
to replace (3) windows in kitchen not visible from street. u-factor < -.4 | $1,200 |